These transactions are scheduled directly between a generator and a load, that is, bilateral - between two parties. All bilateral bids offered within NY are also automatically scheduled by NYISO. This is energy brought into New York from neighboring control areas, which include PJM Interconnection, ISO New England, Hydro Quebec and IMO (Ontario). The amount scheduled is determined by price, thus not all that is bid gets scheduled.Energy flowing out of New York to the neighboring control areas. Again price determines how much energy is actually scheduled for export.This is the sum of energy imports less exports. Wheel throughs have no impact on this calculation as their flow in and out nets to zero.The amount of energy purchased in one control area and delivered to another control area, that is, just wheeling through New York.All generating units in New York must submit bids in order to be considered by NYISO. Units are scheduled based on economics and the need to maintain reliable system operation.  
Balancing Market Advisory Summary
Date: 02/17/2005

Offered MWh Scheduled MWh Percent
Bilateral Bids 3216 3216

Generation Bids 516752 476254 92.2%

Imports 66394 65383 98.5%
Exports 18610 18221 97.9%

Net Imports/(Exports) 47784 47162 98.7%
Wheel Throughs 0 0 0.0%