This report provides a summary of the energy offered and transacted for the Day-ahead Market (DAM) in New York. More than 90% of the energy traded in the NYISO wholesale energy market occurs in the DAM. The remainder is conducted in the real-time market, where adjustments are made for conditions that occur within the day. The report is currently issued Monday through Friday and is intended for use by our Customers and Market Participants.The weather-adjusted forecast of the expected energy load or consumption for the day as determined by the NYISO.The forecast energy consumption as submitted by NYISO Customers. For informational purposes, the percentage difference between the Customer and NYISO load forecasts is provided.The amount of load Customers will procure in the DAM at the location based marginal price (LBMP). Customers may choose to bid more or less than their load forecast with any excess or shortage being settled in the real-time market. All load bids offered within New York are automatically scheduled by NYISO.These transactions are scheduled directly between a generator and a load, that is, bilateral - between two parties. All bilateral bids offered within NY are also automatically scheduled by NYISO.This allows customers to set limits on the amount they are willing to pay for their energy. Customers can also choose to buy more energy if the price is lower. These load bids consist of price capped loads at internal NYCA bus specific locations and at the external proxy buses. The proxy bus loads are also considered exports.This is energy brought into New York from neighboring control areas, which include PJM Interconnection, ISO New England, Hydro Quebec and IMO (Ontario). The amount scheduled is determined by price, thus not all that is bid gets scheduled.Energy flowing out of New York to the neighboring control areas. Again price determines how much energy is actually scheduled for export.This is the sum of energy imports less exports. Wheel throughs have no impact on this calculation as their flow in and out nets to zero.The amount of energy purchased in one control area and delivered to another control area, that is, just wheeling through New York.All generating units in New York must submit bids in order to be considered by NYISO. Units are scheduled based on economics and the need to maintain reliable system operation.This is energy brought into New York from neighboring control areas, which include PJM Interconnection, ISO New England, Hydro Quebec and IMO (Ontario). The amount scheduled is determined by price, thus not all that is bid gets scheduled.The Daily Energy Report also includes a graph of the DAM Marginal Cost of Energy that shows the base price of energy for New York during each hour of the day. This price does not include the marginal cost of electrical losses or congestion that may occur since these quantities are location dependent. The zonal and generator locational-based marginal prices (LBMPs) do include these components and these values may be found on the OASIS section of the web site. The Marginal Cost of Energy by definition is determined at the NYISO reference bus, so named because it is the reference against which losses, congestion, shift factors, penalty factors and other system mathematical quantities are calculated. It is physically located at the Marcy 345 kV substation in Marcy, New York.This is energy brought into New York from neighboring control areas, which include PJM Interconnection, ISO New England, Hydro Quebec and IMO (Ontario). The amount scheduled is determined by price, thus not all that is bid gets scheduled.This is a summary of gross imports, gross exports and net imports displayed by external control area.This is the virtual energy purchased in the DAM and sold in the RT Market. These are financial transactions only and have no effect on real time physical energy consumption.This is the virtual energy sold in the DAM and purchased in the RT Market. These are financial transactions only and have no effect on real time physical energy consumption.
Daily Energy Report - Day Ahead Market (DAM)
Date: 12/03/2019

MWh Percent
NYISO Load Forecast 430635
Customer Load Forecast 422642 -1.9%

Offered MWh Scheduled MWh Percent
Load Bids 228328 228328 100.0%
Bilateral Bids 166800 166800 100.0%
Price Capped Load Bids 51381 43346 84.4%
Virtual Load Bids 41735 30748 73.7%

Total Load 488244 469222 96.1%
Total Peak Load 343878 334595 97.3%
Total Non Peak Load 144366 134627 93.3%

Generation Bids 821386 369349 45.0%
Virtual Supply Bids 76362 59390 77.8%

Total Generation 897748 428739 47.8%
Total Peak Generation 608300 306486 50.4%
Total Non Peak Generation 289448 122254 42.2%

Imports 103430 90856 87.8%
Exports 44619 38159 85.5%

Net Imports/(Exports) 58811 52697 89.6%
Gross Imports/Exports Summary
Wheel Throughs 6432 5525 85.9%