This report provides a summary of the energy offered and transacted for the Day-ahead Market (DAM) in New York. More than 90% of the energy traded in the NYISO wholesale energy market occurs in the DAM. The remainder is conducted in the real-time market, where adjustments are made for conditions that occur within the day. The report is currently issued Monday through Friday and is intended for use by our Customers and Market Participants.The weather-adjusted forecast of the expected energy load or consumption for the day as determined by the NYISO.The forecast energy consumption as submitted by NYISO Customers. For informational purposes, the percentage difference between the Customer and NYISO load forecasts is provided.The amount of load Customers will procure in the DAM at the location based marginal price (LBMP). Customers may choose to bid more or less than their load forecast with any excess or shortage being settled in the real-time market. All load bids offered within New York are automatically scheduled by NYISO.These transactions are scheduled directly between a generator and a load, that is, bilateral - between two parties. All bilateral bids offered within NY are also automatically scheduled by NYISO.This allows customers to set limits on the amount they are willing to pay for their energy. Customers can also choose to buy more energy if the price is lower. These load bids consist of price capped loads at internal NYCA bus specific locations and at the external proxy buses. The proxy bus loads are also considered exports.This is energy brought into New York from neighboring control areas, which include PJM Interconnection, ISO New England, Hydro Quebec and IMO (Ontario). The amount scheduled is determined by price, thus not all that is bid gets scheduled.Energy flowing out of New York to the neighboring control areas. Again price determines how much energy is actually scheduled for export.This is the sum of energy imports less exports. Wheel throughs have no impact on this calculation as their flow in and out nets to zero.The amount of energy purchased in one control area and delivered to another control area, that is, just wheeling through New York.All generating units in New York must submit bids in order to be considered by NYISO. Units are scheduled based on economics and the need to maintain reliable system operation.This is energy brought into New York from neighboring control areas, which include PJM Interconnection, ISO New England, Hydro Quebec and IMO (Ontario). The amount scheduled is determined by price, thus not all that is bid gets scheduled.The Daily Energy Report also includes a graph of the DAM Marginal Cost of Energy that shows the base price of energy for New York during each hour of the day. This price does not include the marginal cost of electrical losses or congestion that may occur since these quantities are location dependent. The zonal and generator locational-based marginal prices (LBMPs) do include these components and these values may be found on the OASIS section of the web site. The Marginal Cost of Energy by definition is determined at the NYISO reference bus, so named because it is the reference against which losses, congestion, shift factors, penalty factors and other system mathematical quantities are calculated. It is physically located at the Marcy 345 kV substation in Marcy, New York.This is energy brought into New York from neighboring control areas, which include PJM Interconnection, ISO New England, Hydro Quebec and IMO (Ontario). The amount scheduled is determined by price, thus not all that is bid gets scheduled.This is a summary of gross imports, gross exports and net imports displayed by external control area.This is the virtual energy purchased in the DAM and sold in the RT Market. These are financial transactions only and have no effect on real time physical energy consumption.This is the virtual energy sold in the DAM and purchased in the RT Market. These are financial transactions only and have no effect on real time physical energy consumption.
Daily Energy Report - Day Ahead Market (DAM)
Date: 07/21/2019

MWh Percent
NYISO Load Forecast 608290
Customer Load Forecast 579905 -4.7%

Offered MWh Scheduled MWh Percent
Load Bids 332303 332303 100.0%
Bilateral Bids 167243 167243 100.0%
Price Capped Load Bids 102137 93454 91.5%
Virtual Load Bids 81808 62446 76.3%

Total Load 683491 655446 95.9%
Total Peak Load 489976 473070 96.5%
Total Non Peak Load 193515 182376 94.2%

Generation Bids 854997 530395 62.0%
Virtual Supply Bids 67001 58464 87.3%

Total Generation 921998 588859 63.9%
Total Peak Generation 625151 430370 68.8%
Total Non Peak Generation 296847 158489 53.4%

Imports 135504 111678 82.4%
Exports 32463 28337 87.3%

Net Imports/(Exports) 103041 83341 80.9%
Gross Imports/Exports Summary
Wheel Throughs 9810 9624 98.1%