This report provides a summary of the energy offered and transacted for the Day-ahead Market (DAM) in New York. More than 90% of the energy traded in the NYISO wholesale energy market occurs in the DAM. The remainder is conducted in the real-time market, where adjustments are made for conditions that occur within the day. The report is currently issued Monday through Friday and is intended for use by our Customers and Market Participants.The weather-adjusted forecast of the expected energy load or consumption for the day as determined by the NYISO.The forecast energy consumption as submitted by NYISO Customers. For informational purposes, the percentage difference between the Customer and NYISO load forecasts is provided.The amount of load Customers will procure in the DAM at the location based marginal price (LBMP). Customers may choose to bid more or less than their load forecast with any excess or shortage being settled in the real-time market. All load bids offered within New York are automatically scheduled by NYISO.These transactions are scheduled directly between a generator and a load, that is, bilateral - between two parties. All bilateral bids offered within NY are also automatically scheduled by NYISO.This allows customers to set limits on the amount they are willing to pay for their energy. Customers can also choose to buy more energy if the price is lower. These load bids consist of price capped loads at internal NYCA bus specific locations and at the external proxy buses. The proxy bus loads are also considered exports.This is energy brought into New York from neighboring control areas, which include PJM Interconnection, ISO New England, Hydro Quebec and IMO (Ontario). The amount scheduled is determined by price, thus not all that is bid gets scheduled.Energy flowing out of New York to the neighboring control areas. Again price determines how much energy is actually scheduled for export.This is the sum of energy imports less exports. Wheel throughs have no impact on this calculation as their flow in and out nets to zero.The amount of energy purchased in one control area and delivered to another control area, that is, just wheeling through New York.All generating units in New York must submit bids in order to be considered by NYISO. Units are scheduled based on economics and the need to maintain reliable system operation.This is energy brought into New York from neighboring control areas, which include PJM Interconnection, ISO New England, Hydro Quebec and IMO (Ontario). The amount scheduled is determined by price, thus not all that is bid gets scheduled.The Daily Energy Report also includes a graph of the DAM Marginal Cost of Energy that shows the base price of energy for New York during each hour of the day. This price does not include the marginal cost of electrical losses or congestion that may occur since these quantities are location dependent. The zonal and generator locational-based marginal prices (LBMPs) do include these components and these values may be found on the OASIS section of the web site. The Marginal Cost of Energy by definition is determined at the NYISO reference bus, so named because it is the reference against which losses, congestion, shift factors, penalty factors and other system mathematical quantities are calculated. It is physically located at the Marcy 345 kV substation in Marcy, New York.This is energy brought into New York from neighboring control areas, which include PJM Interconnection, ISO New England, Hydro Quebec and IMO (Ontario). The amount scheduled is determined by price, thus not all that is bid gets scheduled.This is a summary of gross imports, gross exports and net imports displayed by external control area.This is the virtual energy purchased in the DAM and sold in the RT Market. These are financial transactions only and have no effect on real time physical energy consumption.This is the virtual energy sold in the DAM and purchased in the RT Market. These are financial transactions only and have no effect on real time physical energy consumption.
Daily Energy Report - Day Ahead Market (DAM)
Date: 02/07/2019

MWh Percent
NYISO Load Forecast 415495
Customer Load Forecast 416095 0.1%

Offered MWh Scheduled MWh Percent
Load Bids 226895 226895 100.0%
Bilateral Bids 165408 165408 100.0%
Price Capped Load Bids 45253 38983 86.1%
Virtual Load Bids 28322 24732 87.3%

Total Load 465878 456018 97.9%
Total Peak Load 329825 323803 98.2%
Total Non Peak Load 136053 132215 97.2%

Generation Bids 816755 350367 42.9%
Virtual Supply Bids 94928 67821 71.4%

Total Generation 911683 418188 45.9%
Total Peak Generation 612480 298830 48.8%
Total Non Peak Generation 299203 119359 39.9%

Imports 88851 86095 96.9%
Exports 38220 35646 93.3%

Net Imports/(Exports) 50631 50449 99.6%
Gross Imports/Exports Summary
Wheel Throughs 8930 8675 97.1%