Insert Time | Message |
06-Nov-2012 09:00:54 | Metering Authority - Long Island Power Authority UPDATES WEST BABYLON___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/06/2012 09:00 FOR Transformer/Transmission failure. |
06-Nov-2012 10:49:06 | ISO REQUESTS AST_ENERGY_2_CC3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 10:00 FOR actual flow. |
06-Nov-2012 10:49:43 | ISO REQUESTS AST_ENERGY_2_CC4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 10:00 FOR actual flow. |
06-Nov-2012 11:01:36 | ISO REMOVES AST_ENERGY_2_CC4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 11:00. |
06-Nov-2012 11:01:36 | ISO REMOVES AST_ENERGY_2_CC3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 11:00. |
06-Nov-2012 11:06:17 | 11/06/2012 11:04:22 NYISO large event reserve pick-up executed. |
06-Nov-2012 11:06:22 | 11/06/2012 11:05:00 NYISO large event reserve pick-up executed. |
06-Nov-2012 11:11:14 | 11/06/2012 11:10:00 NYISO large event reserve pick-up executed. |
06-Nov-2012 11:11:19 | 11/06/2012 11:10:16 NYISO large event reserve pick-up executed. |
06-Nov-2012 17:19:16 | ISO REQUESTS NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 17:00 FOR P/C loading. |
06-Nov-2012 17:20:25 | ISO REQUESTS NORTHPORT___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 17:00 FOR P/C loading. |
06-Nov-2012 17:20:45 | ISO UPDATES NORTHPORT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 17:00 FOR P/C loading. |
06-Nov-2012 17:30:20 | ISO UPDATES NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 17:00 FOR P/C loading. |
06-Nov-2012 17:30:34 | ISO UPDATES NORTHPORT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 17:00 FOR P/C loading. |
06-Nov-2012 17:30:56 | ISO UPDATES NORTHPORT___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 17:00 FOR P/C loading. |
06-Nov-2012 17:45:16 | ISO UPDATES NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 17:00 FOR P/C loading. |
06-Nov-2012 17:45:30 | ISO UPDATES NORTHPORT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 17:00 FOR P/C loading. |
06-Nov-2012 17:45:46 | ISO UPDATES NORTHPORT___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 17:00 FOR P/C loading. |
06-Nov-2012 18:11:49 | ISO UPDATES NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 18:00 FOR P/C loading. |
06-Nov-2012 18:12:03 | ISO UPDATES NORTHPORT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 18:00 FOR P/C loading. |
06-Nov-2012 18:41:34 | Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/06/2012 18:00 FOR P/C Loading. |
06-Nov-2012 18:46:42 | 11/06/2012 18:46:22 NYISO small event reserve pick-up executed. |
06-Nov-2012 18:51:12 | 11/06/2012 18:50:00 NYISO small event reserve pick-up executed. |
06-Nov-2012 18:53:23 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 18:00 FOR . |
06-Nov-2012 18:56:13 | 11/06/2012 18:55:00 NYISO small event reserve pick-up executed. |
06-Nov-2012 18:56:33 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 18:00. |
06-Nov-2012 19:12:00 | ISO REMOVES NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 19:00. |
06-Nov-2012 19:12:01 | ISO REMOVES NORTHPORT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 19:00. |
06-Nov-2012 19:12:01 | ISO REMOVES NORTHPORT___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 19:00. |
06-Nov-2012 19:53:37 | ISO REQUESTS RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 19:00 FOR P/C loading. |
06-Nov-2012 19:54:10 | ISO REQUESTS RAVENSWOOD___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 19:00 FOR P/C loading. |
06-Nov-2012 19:55:47 | ISO REQUESTS RAVENSWOOD___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 19:00 FOR P/C loading. |
06-Nov-2012 20:20:42 | ISO REMOVES RAVENSWOOD___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 20:00. |
06-Nov-2012 20:20:42 | ISO REMOVES RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 20:00. |
06-Nov-2012 20:30:57 | ISO REMOVES RAVENSWOOD___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/06/2012 20:00. |
06-Nov-2012 21:30:30 | Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/06/2012 21:00. |
Insert Time | Message |
06-Nov-2012 05:07:29 | 11/06/2012 05:07:29 Generator: NORTHPORT___4 requested for Day Ahead Reliability in DAM market for 11/07/2012 00 to 11/07/2012 23 ARR: 28 |
06-Nov-2012 05:07:29 | 11/06/2012 05:07:29 Generator: RAVENSWOOD___4 requested for Day Ahead Reliability in DAM market for 11/07/2012 00 to 11/07/2012 23 ARR: 37 |
06-Nov-2012 05:07:29 | 11/06/2012 05:07:29 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 11/07/2012 00 to 11/07/2012 23 ARR: 37 |
06-Nov-2012 05:07:29 | 11/06/2012 05:07:29 Generator: ASTORIA_EAST_ENERGY_CC2 requested for Day Ahead Reliability in DAM market for 11/07/2012 00 to 11/07/2012 23 |
06-Nov-2012 05:07:29 | 11/06/2012 05:07:29 Generator: NORTHPORT___3 requested for Day Ahead Reliability in DAM market for 11/07/2012 00 to 11/07/2012 23 |
06-Nov-2012 05:07:29 | 11/06/2012 05:07:29 Generator: NORTHPORT___1 requested for Day Ahead Reliability in DAM market for 11/07/2012 00 to 11/07/2012 23 ARR: 28 |
06-Nov-2012 05:07:29 | 11/06/2012 05:07:29 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 11/07/2012 00 to 11/07/2012 23 ARR: 37 |
06-Nov-2012 05:07:29 | 11/06/2012 05:07:29 Generator: NYPA___ASTORIA_CC2 requested for Day Ahead Reliability in DAM market for 11/07/2012 00 to 11/07/2012 23 |
06-Nov-2012 05:07:29 | 11/06/2012 05:07:29 Generator: NYPA___ASTORIA_CC1 requested for Day Ahead Reliability in DAM market for 11/07/2012 00 to 11/07/2012 23 |
06-Nov-2012 05:07:29 | 11/06/2012 05:07:29 Generator: PORT_JEFF_4 requested for Day Ahead Reliability in DAM market for 11/07/2012 00 to 11/07/2012 23 |
06-Nov-2012 05:07:29 | 11/06/2012 05:07:29 Generator: RAVENSWOOD___2 requested for Day Ahead Reliability in DAM market for 11/07/2012 00 to 11/07/2012 23 ARR: 37 |
06-Nov-2012 05:07:29 | 11/06/2012 05:07:29 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 11/07/2012 00 to 11/07/2012 23 ARR: 37 |
06-Nov-2012 05:07:29 | 11/06/2012 05:07:29 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 11/07/2012 00 to 11/07/2012 23 ARR: 37 |
06-Nov-2012 11:31:54 | Generator: ATHENS_STG_2 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 00 Energy = 297 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:31:55 | Generator: ATHENS_STG_2 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 01 Energy = 297 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:31:55 | Generator: ATHENS_STG_2 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 02 Energy = 297 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:31:55 | Generator: ATHENS_STG_2 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 03 Energy = 298 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:31:55 | Generator: ATHENS_STG_2 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 04 Energy = 298 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:31:55 | Generator: ATHENS_STG_2 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 05 Energy = 298 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:31:55 | Generator: ATHENS_STG_2 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 06 Energy = 297 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:31:55 | Generator: ATHENS_STG_2 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 07 Energy = 297 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 11:33:20 | Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:48 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 06 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 20 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 19 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 18 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 17 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 16 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 14 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 13 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 12 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 11 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 10 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 09 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 08 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 07 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Nov-2012 13:29:49 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 15 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |