P-2507-Nov-2012

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices
Market Pricing Notices

Dispatcher Notices

Back to top
Insert TimeMessage
07-Nov-2012 02:06:21ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 02:00 FOR .
07-Nov-2012 02:08:54O H initiated curtailment cut 100 MWs. 11/07/2012 02:08 EST
07-Nov-2012 02:15:55ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 02:00.
07-Nov-2012 06:30:30ISO REQUESTS AST_ENERGY_2_CC3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 06:00 FOR 345kv contingency.
07-Nov-2012 06:31:15ISO REQUESTS AST_ENERGY_2_CC4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 06:00 FOR 345kv contingency.
07-Nov-2012 07:05:54Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 07:00 FOR P/C LOADING.
07-Nov-2012 07:06:26ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 07:00 FOR CPS.
07-Nov-2012 07:06:3211/07/2012 07:06:10 NYISO large event reserve pick-up executed.
07-Nov-2012 07:13:24Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 07:00 FOR P/C LOADING.
07-Nov-2012 08:27:17Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 08:00 FOR P/C Flows.
07-Nov-2012 09:43:32NYISO Locational based curtailment cut 100 MWs. 11/07/2012 09:43 EST
07-Nov-2012 09:44:36NYISO Locational based curtailment cut 199 MWs. 11/07/2012 09:44 EST
07-Nov-2012 10:04:59Metering Authority - Niagara Mohawk REQUESTS MARBLE_RIVER_WT_PWR OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 10:00 FOR .
07-Nov-2012 10:05:25Metering Authority - Niagara Mohawk REQUESTS CHATEAUG_WT_PWR OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 10:00 FOR .
07-Nov-2012 10:05:33Metering Authority - Niagara Mohawk REQUESTS ELLENBURG_WT_PWR OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 10:00 FOR ACTUAL LOADING.
07-Nov-2012 10:06:07Metering Authority - Niagara Mohawk REQUESTS CLINTON_WT_PWR OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 10:00 FOR ACTUAL LOADING.
07-Nov-2012 10:06:18Metering Authority - Niagara Mohawk UPDATES MARBLE_RIVER_WT_PWR OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 10:00 FOR Actual Loading.
07-Nov-2012 10:06:28Metering Authority - Niagara Mohawk UPDATES CHATEAUG_WT_PWR OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 10:00 FOR Actual Loading.
07-Nov-2012 10:07:18Metering Authority - Niagara Mohawk REQUESTS ALTONA_WT_PWR OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 10:00 FOR ACTUAL LOADING.
07-Nov-2012 10:15:56Metering Authority - Niagara Mohawk REQUESTS ST LAWRENCE____ OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 10:00 FOR Actual Loading.
07-Nov-2012 10:17:55Metering Authority - Niagara Mohawk UPDATES ST LAWRENCE____ OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 10:00 FOR Actual Loading.
07-Nov-2012 10:34:0411/07/2012 10:33:40 NYISO large event reserve pick-up executed.
07-Nov-2012 10:35:45ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 10:00 FOR ACE.
07-Nov-2012 10:36:1411/07/2012 10:35:00 NYISO large event reserve pick-up executed.
07-Nov-2012 10:39:31ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 10:00 FOR CPS.
07-Nov-2012 12:24:49ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 12:00 FOR .
07-Nov-2012 12:33:54ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 14:00.
07-Nov-2012 12:42:04Metering Authority - Niagara Mohawk REMOVES ALTONA_WT_PWR OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 12:00.
07-Nov-2012 12:42:04Metering Authority - Niagara Mohawk REMOVES CHATEAUG_WT_PWR OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 12:00.
07-Nov-2012 12:42:04Metering Authority - Niagara Mohawk REMOVES CLINTON_WT_PWR OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 12:00.
07-Nov-2012 12:42:05Metering Authority - Niagara Mohawk REMOVES ELLENBURG_WT_PWR OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 12:00.
07-Nov-2012 12:42:05Metering Authority - Niagara Mohawk REMOVES MARBLE_RIVER_WT_PWR OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 12:00.
07-Nov-2012 12:42:05Metering Authority - Niagara Mohawk REMOVES ST LAWRENCE____ OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 12:00.
07-Nov-2012 14:16:51NYISO Locational based curtailment cut 104 MWs. 11/07/2012 14:16 EST
07-Nov-2012 15:11:42ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 15:00.
07-Nov-2012 16:17:05ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 16:00 FOR ACTUAL LOADING.
07-Nov-2012 16:27:01ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 16:00 FOR ACTUAL LOADING.
07-Nov-2012 16:33:10ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 17:00.
07-Nov-2012 16:33:10ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 17:00.
07-Nov-2012 16:55:37ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 17:00 FOR ACTUAL LOADING.
07-Nov-2012 16:55:37ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 17:00 FOR ACTUAL LOADING.
07-Nov-2012 17:00:20 Consolidated Edison of NY has Declared Today a Min Oil Burn Day.
07-Nov-2012 17:06:48Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 17:00 FOR Transmission.
07-Nov-2012 17:08:12ISO UPDATES AST_ENERGY_2_CC4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 17:00 FOR FUEL INLET PRESSURE.
07-Nov-2012 17:10:43ISO UPDATES AST_ENERGY_2_CC3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 17:00 FOR .
07-Nov-2012 17:10:55ISO UPDATES AST_ENERGY_2_CC4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 17:00 FOR FUEL INLET PRESSURE.
07-Nov-2012 17:11:07ISO UPDATES AST_ENERGY_2_CC4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 17:00 FOR .
07-Nov-2012 17:20:33Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 17:00 FOR P/C LOADING / Fule Swap.
07-Nov-2012 17:21:07Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 17:00 FOR P/C LOADING / Fuel Swap.
07-Nov-2012 17:23:54Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 17:00 FOR P/C LOADING.
07-Nov-2012 17:32:13ISO UPDATES AST_ENERGY_2_CC3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 17:00 FOR .
07-Nov-2012 17:32:29ISO UPDATES AST_ENERGY_2_CC4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 17:00 FOR .
07-Nov-2012 17:35:17NYISO Locational based curtailment cut 200 MWs. 11/07/2012 17:35 EST
07-Nov-2012 17:54:36ISO UPDATES RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 17:00 FOR GAS SYSTEM PRESSURES..
07-Nov-2012 17:55:15ISO REQUESTS RAVENSWOOD___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 17:00 FOR GAS SYSTEM PRESSURES..
07-Nov-2012 18:06:15ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 18:00.
07-Nov-2012 18:07:09ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 18:00 FOR ACE/CPS.
07-Nov-2012 18:08:01ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 18:00 FOR ACTUAL LOADING. Record deleted in current hour..
07-Nov-2012 18:08:17ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 18:00 FOR ACTUAL LOADING..
07-Nov-2012 18:12:22ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 18:00.
07-Nov-2012 18:29:40ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 18:00.
07-Nov-2012 18:51:3411/07/2012 18:51:10 NYISO large event reserve pick-up executed.
07-Nov-2012 18:52:57ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 18:00 FOR .
07-Nov-2012 18:56:1011/07/2012 18:55:00 NYISO large event reserve pick-up executed.
07-Nov-2012 19:19:12ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/07/2012 20:00.
07-Nov-2012 21:03:34Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 21:00.
07-Nov-2012 21:03:34Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/07/2012 21:00.
07-Nov-2012 21:07:36ISO REQUESTS AST_ENERGY_2_CC4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/08/2012 00:00 FOR .
07-Nov-2012 21:07:36ISO REQUESTS AST_ENERGY_2_CC3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/08/2012 00:00 FOR .
07-Nov-2012 21:07:37ISO REQUESTS RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/08/2012 00:00 FOR GAS SYSTEM PRESSURES..
07-Nov-2012 21:07:37ISO REQUESTS RAVENSWOOD___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/08/2012 00:00 FOR GAS SYSTEM PRESSURES..

Committed for Reliability

Back to top
Insert TimeMessage
07-Nov-2012 05:07:2811/07/2012 05:07:28 Generator: RAVENSWOOD___4 requested for Day Ahead Reliability in DAM market for 11/08/2012 00 to 11/08/2012 23 ARR: 37
07-Nov-2012 05:07:2811/07/2012 05:07:28 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 11/08/2012 00 to 11/08/2012 23 ARR: 37
07-Nov-2012 05:07:2811/07/2012 05:07:28 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 11/08/2012 00 to 11/08/2012 23 ARR: 37
07-Nov-2012 05:07:2811/07/2012 05:07:28 Generator: ASTORIA_EAST_ENERGY_CC2 requested for Day Ahead Reliability in DAM market for 11/08/2012 00 to 11/08/2012 23
07-Nov-2012 05:07:2811/07/2012 05:07:28 Generator: NORTHPORT___3 requested for Day Ahead Reliability in DAM market for 11/08/2012 00 to 11/08/2012 23
07-Nov-2012 05:07:2811/07/2012 05:07:28 Generator: NORTHPORT___1 requested for Day Ahead Reliability in DAM market for 11/08/2012 00 to 11/08/2012 23 ARR: 28
07-Nov-2012 05:07:2811/07/2012 05:07:28 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 11/08/2012 00 to 11/08/2012 23 ARR: 37
07-Nov-2012 05:07:2811/07/2012 05:07:28 Generator: NYPA___ASTORIA_CC2 requested for Day Ahead Reliability in DAM market for 11/08/2012 00 to 11/08/2012 23
07-Nov-2012 05:07:2811/07/2012 05:07:28 Generator: NYPA___ASTORIA_CC1 requested for Day Ahead Reliability in DAM market for 11/08/2012 00 to 11/08/2012 23
07-Nov-2012 05:07:2811/07/2012 05:07:28 Generator: PORT_JEFF_4 requested for Day Ahead Reliability in DAM market for 11/08/2012 00 to 11/08/2012 23
07-Nov-2012 05:07:2811/07/2012 05:07:28 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 11/08/2012 00 to 11/08/2012 23 ARR: 37
07-Nov-2012 05:07:2811/07/2012 05:07:28 Generator: NORTHPORT___4 requested for Day Ahead Reliability in DAM market for 11/08/2012 00 to 11/08/2012 23 ARR: 28
07-Nov-2012 05:07:2811/07/2012 05:07:28 Generator: RAVENSWOOD___2 requested for Day Ahead Reliability in DAM market for 11/08/2012 00 to 11/08/2012 23 ARR: 37
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:12Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:13Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:13Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:13Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:13Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:13Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:13Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:13Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:13Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:37:13Generator: ROSETON___1 scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 20 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 21 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 22 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 06 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 07 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 08 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 09 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 10 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 11 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 12 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 13 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 14 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 15 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 16 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 17 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 18 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 13:49:35Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/08/2012 19 Energy = 123 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 14:15:56Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 21 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 14:15:56Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/07/2012 22 Energy = 124 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 15:45:34Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 07 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 16 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 15 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 14 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 13 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 12 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 11 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 10 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 09 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 08 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 17 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 18 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 19 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 20 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 15:45:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 11/08/2012 21 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 23
07-Nov-2012 21:10:34Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:36Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:36Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:36Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:36Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:10:36Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/08/2012 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-Nov-2012 21:28:44Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 11/07/2012 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage

Market Pricing Notices

Back to top
Insert TimeMessage
07-Nov-2012 15:27:44Prices in the November 06, 2012 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the November 06, 2012 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the November 08, 2012 Day-Ahead Market encompassing Energy, Regulation, and Operating Reserves are correct.
07-Nov-2012 15:41:44Prices in the November 07, 2012 Real-Time Market for the period hours beginning 0 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the November 07, 2012 Hour-Ahead Market for the period hours beginning 0 through 11 are correct.