03-Aug-2012 07:23:35 Long Island Power Authority has Declared Today a Min Oil Burn Day.
03-Aug-2012 09:44:59Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 09:00 FOR East End TVR.
03-Aug-2012 10:17:59Power System conditions will no longer allow HQTE-NYISO Chateauguay-Massena Interconnection operation above 1500MW as described in NYISO Technical Bulletin #150.
03-Aug-2012 10:22:48NYISO Locational based curtailment cut 10 MWs. 08/03/2012 10:22 EDT
03-Aug-2012 10:44:43Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 10:00 FOR TVR.
03-Aug-2012 10:46:14Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 10:00 FOR TVR.
03-Aug-2012 10:47:42Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 10:00 FOR TVR.
03-Aug-2012 10:48:46Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 10:00 FOR TVR.
03-Aug-2012 11:06:2408/03/2012 11:05:19 NYISO large event reserve pick-up executed.
03-Aug-2012 11:17:04Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 11:00 FOR TVR.
03-Aug-2012 11:17:38Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 11:00 FOR TVR.
03-Aug-2012 11:23:19Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 11:00 FOR TVR.
03-Aug-2012 11:23:51Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 11:00 FOR TVR.
03-Aug-2012 11:26:22Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 11:00 FOR TVR.
03-Aug-2012 11:27:33Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 11:00 FOR TVR.
03-Aug-2012 11:44:11Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 11:00 FOR TVR.
03-Aug-2012 12:26:47Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 12:00 FOR 69kV contingencies.
03-Aug-2012 12:37:01Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 12:00 FOR TVR.
03-Aug-2012 12:53:06Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 12:00 FOR TVR.
03-Aug-2012 12:53:06Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 12:00 FOR TVR.
03-Aug-2012 12:53:06Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 12:00 FOR TVR.
03-Aug-2012 12:53:07Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 12:00 FOR TVR.
03-Aug-2012 12:53:07Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 12:00 FOR TVR.
03-Aug-2012 12:53:40Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 12:00 FOR TVR.
03-Aug-2012 13:42:46Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 13:00 FOR TVR (Derated to 17 for half unit).
03-Aug-2012 14:11:22 Consolidated Edison of NY has Declared Today a Min Oil Burn Day.
03-Aug-2012 14:24:39Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 14:00 FOR 69kv system.
03-Aug-2012 15:23:38NPX initiated curtailment cut 224 MWs. 08/03/2012 15:23 EDT
03-Aug-2012 17:24:27Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 17:00.
03-Aug-2012 17:24:27Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 17:00.
03-Aug-2012 17:24:28Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 17:00.
03-Aug-2012 17:24:28Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 17:00.
03-Aug-2012 17:24:28Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 17:00.
03-Aug-2012 17:24:28Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 17:00.
03-Aug-2012 17:24:28Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 17:00.
03-Aug-2012 18:06:17Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00.
03-Aug-2012 18:22:38Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00.
03-Aug-2012 18:22:38Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00.
03-Aug-2012 18:22:38Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00.
03-Aug-2012 18:24:51Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00 FOR ACTUAL LOADING.
03-Aug-2012 18:25:36Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00 FOR ACTUAL LOADING.
03-Aug-2012 18:26:07Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00 FOR ACTUIAL LOADING.
03-Aug-2012 18:31:39Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00 FOR ACTUAL LOADING.
03-Aug-2012 18:31:53Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00 FOR ACTUAL LOADING.
03-Aug-2012 18:32:05Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00 FOR ACTUIAL LOADING.
03-Aug-2012 18:43:13Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00 FOR ACTUAL LOADING.
03-Aug-2012 18:43:26Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00 FOR ACTUAL LOADING.
03-Aug-2012 18:43:38Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00 FOR ACTUIAL LOADING.
03-Aug-2012 18:50:42Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00.
03-Aug-2012 18:50:42Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00.
03-Aug-2012 18:50:42Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 18:00.
03-Aug-2012 19:14:15Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 19:00 FOR ACTUAL LOADING.
03-Aug-2012 19:14:31Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 19:00 FOR ACTUAL LOADING.
03-Aug-2012 19:14:42Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 19:00 FOR ACTUIAL LOADING.
03-Aug-2012 19:34:40Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 19:00 FOR ACTUAL LOADING.
03-Aug-2012 19:34:56Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 19:00 FOR ACTUAL LOADING.
03-Aug-2012 19:35:10Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 19:00 FOR ACTUIAL LOADING.
03-Aug-2012 19:44:16Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 19:00.
03-Aug-2012 19:44:16Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 19:00.
03-Aug-2012 19:44:16Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 19:00.
03-Aug-2012 20:26:52Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 20:00 FOR ACTUAL LOADING.
03-Aug-2012 20:27:05Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 20:00 FOR ACTUAL LOADING.
03-Aug-2012 20:27:18Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 20:00 FOR ACTUIAL LOADING.
03-Aug-2012 20:50:54Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/04/2012 00:00 FOR ACTUAL LOADING.
03-Aug-2012 20:50:54Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/04/2012 00:00 FOR ACTUAL LOADING.
03-Aug-2012 20:50:54Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/04/2012 00:00 FOR ACTUIAL LOADING.
03-Aug-2012 20:51:18Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 20:00.
03-Aug-2012 21:00:50Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 21:00.
03-Aug-2012 21:00:50Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 21:00.
03-Aug-2012 21:00:50Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 21:00.
03-Aug-2012 21:36:45Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 22:00.
03-Aug-2012 21:36:45Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 22:00.
03-Aug-2012 21:36:45Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 22:00.
03-Aug-2012 21:40:55Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 21:00 FOR ACTUAL LOADING..
03-Aug-2012 21:41:13Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 21:00 FOR ACTUAL LOADING.
03-Aug-2012 21:41:27Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 21:00 FOR ACTUIAL LOADING..
03-Aug-2012 21:41:39Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 21:00 FOR ACTUAL LOADING..
03-Aug-2012 21:41:48Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 22:00 FOR ACTUAL LOADING..
03-Aug-2012 21:41:48Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 22:00 FOR ACTUAL LOADING.
03-Aug-2012 21:41:48Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 22:00 FOR ACTUIAL LOADING..
03-Aug-2012 21:47:57Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 21:00 FOR ACTUAL LOADING..
03-Aug-2012 21:48:10Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 21:00 FOR ACTUAL LOADING.
03-Aug-2012 21:49:10Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 21:00 FOR ACTUIAL LOADING..
03-Aug-2012 21:49:30Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 21:00 FOR ACTUAL LOADING.
03-Aug-2012 21:49:40Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 21:00 FOR ACTUAL LOADING..
03-Aug-2012 22:12:20Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 22:00 FOR ACTUAL LOADING..
03-Aug-2012 22:12:35Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 22:00 FOR ACTUAL LOADING.
03-Aug-2012 22:12:48Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 22:00 FOR ACTUIAL LOADING..
03-Aug-2012 22:23:36Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/04/2012 00:00 FOR ACTUIAL LOADING..
03-Aug-2012 22:23:36Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/04/2012 00:00 FOR ACTUAL LOADING.
03-Aug-2012 22:23:36Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/04/2012 00:00 FOR ACTUAL LOADING..
03-Aug-2012 22:53:07Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 08/03/2012 22:00.

Committed for Reliability

Back to top
Insert TimeMessage
03-Aug-2012 05:07:3008/03/2012 05:07:30 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 08/04/2012 00 to 08/04/2012 23 ARR: 29
03-Aug-2012 05:07:3008/03/2012 05:07:30 Generator: KEDC PORT_JEFF_GT3 requested for Day Ahead Reliability in DAM market for 08/04/2012 12 to 08/04/2012 18 ARR: 28
03-Aug-2012 05:07:3008/03/2012 05:07:30 Generator: DUNKIRK___2 requested for Day Ahead Reliability in DAM market for 08/04/2012 00 to 08/04/2012 23
03-Aug-2012 05:07:3008/03/2012 05:07:30 Generator: PORT_JEFF_3 requested for Day Ahead Reliability in DAM market for 08/04/2012 00 to 08/04/2012 23 ARR: 28
03-Aug-2012 05:07:3008/03/2012 05:07:30 Generator: KEDC PORT_JEFF_GT2 requested for Day Ahead Reliability in DAM market for 08/04/2012 11 to 08/04/2012 17 ARR: 28
03-Aug-2012 05:07:3008/03/2012 05:07:30 Generator: NORTHPORT___3 requested for Day Ahead Reliability in DAM market for 08/04/2012 00 to 08/04/2012 23 ARR: 28
03-Aug-2012 05:07:3008/03/2012 05:07:30 Generator: FPL FAR_ROCK_GT1 requested for Day Ahead Reliability in DAM market for 08/04/2012 09 to 08/04/2012 21
03-Aug-2012 05:07:3008/03/2012 05:07:30 Generator: PORT_JEFF_4 requested for Day Ahead Reliability in DAM market for 08/04/2012 00 to 08/04/2012 23 ARR: 28
03-Aug-2012 05:07:3008/03/2012 05:07:30 Generator: HUNTLEY___68 requested for Day Ahead Reliability in DAM market for 08/04/2012 00 to 08/04/2012 23
03-Aug-2012 05:07:3008/03/2012 05:07:30 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 08/04/2012 00 to 08/04/2012 23 ARR: 37
03-Aug-2012 05:07:3008/03/2012 05:07:30 Generator: NORTHPORT___4 requested for Day Ahead Reliability in DAM market for 08/04/2012 00 to 08/04/2012 23 ARR: 28
03-Aug-2012 05:07:3008/03/2012 05:07:30 Generator: NORTHPORT___1 requested for Day Ahead Reliability in DAM market for 08/04/2012 00 to 08/04/2012 23 ARR: 28
03-Aug-2012 12:42:06Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/04/2012 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 37
03-Aug-2012 12:42:06Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/04/2012 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 37
03-Aug-2012 12:42:06Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/04/2012 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 37
03-Aug-2012 12:42:06Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/04/2012 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. ARR: 37
03-Aug-2012 14:46:04Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 08/04/2012 12 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2012 14:46:04Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 08/04/2012 11 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2012 14:46:04Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 08/04/2012 10 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2012 14:46:04Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 08/04/2012 09 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2012 14:46:05Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 08/04/2012 13 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2012 14:46:05Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 08/04/2012 14 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2012 14:46:05Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 08/04/2012 15 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2012 14:46:05Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 08/04/2012 17 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2012 14:46:05Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 08/04/2012 18 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2012 14:46:05Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 08/04/2012 19 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2012 14:46:05Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 08/04/2012 20 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2012 14:46:05Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 08/04/2012 16 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage

Market Pricing Notices

Back to top
Insert TimeMessage
03-Aug-2012 15:29:54Prices in the August 02, 2012 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the August 02, 2012 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the August 04, 2012 Day-Ahead Market encompassing Energy, Regulation, and Operating Reserves are correct.