Insert TimeMessage
01-Sep-2010 00:18:48Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 00:00 FOR .
01-Sep-2010 00:19:21Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 00:00 FOR P/C LOADING.
01-Sep-2010 00:54:41Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 00:00 FOR P/C LOADING.
01-Sep-2010 01:33:19ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 01:00.
01-Sep-2010 01:36:55Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 01:00 FOR P/C LOADING.
01-Sep-2010 01:51:52Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 01:00 FOR P/C LOADING.
01-Sep-2010 01:57:55ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 01:00 FOR ACE.
01-Sep-2010 02:13:24ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 02:00.
01-Sep-2010 06:19:48Consolidated Edison of NY has Declared Today a Min Oil Burn Day.
01-Sep-2010 07:01:15ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 07:00 FOR .
01-Sep-2010 07:08:58ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 07:00.
01-Sep-2010 07:50:01ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 07:00 FOR GREENWOOD/STATEN ISLAND LOAD POCKET.
01-Sep-2010 07:51:37Metering Authority - Niagara Mohawk UPDATES DUNKIRK___1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 07:00 FOR P/C LOADING.
01-Sep-2010 07:51:49Metering Authority - Niagara Mohawk UPDATES DUNKIRK___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 07:00 FOR P/C LOADING.
01-Sep-2010 08:21:34Long Island Power Authority has Declared Today a Min Oil Burn Day
01-Sep-2010 08:57:44Metering Authority - New York State Electric & Gas REQUESTS NEG WEST_LEA_LOCKPORT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 08:00 FOR 115KV.
01-Sep-2010 08:58:11Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 08:00 FOR East End TVR.
01-Sep-2010 09:09:13Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 09:00 FOR East End TVR.
01-Sep-2010 09:15:45Metering Authority - Niagara Mohawk REMOVES DUNKIRK___1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 09:00.
01-Sep-2010 09:15:45Metering Authority - Niagara Mohawk REMOVES DUNKIRK___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 09:00.
01-Sep-2010 09:20:05ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 09:00 FOR GREENWOOD/STATEN ISLAND LOAD POCKET.
01-Sep-2010 09:59:16Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 09:00 FOR East End TVR.
01-Sep-2010 10:02:56Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 10:00 FOR P/C LOADING.
01-Sep-2010 10:51:45Metering Authority - New York State Electric & Gas UPDATES NEG WEST_LEA_LOCKPORT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 10:00 FOR 115KV.
01-Sep-2010 11:09:30ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 11:00 FOR GREENWOOD/STATEN ISLAND LOAD POCKET.
01-Sep-2010 11:38:52Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR TVR.
01-Sep-2010 11:39:24Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR TVR.
01-Sep-2010 11:39:25Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR TVR.
01-Sep-2010 11:40:05Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR East End TVR.
01-Sep-2010 11:40:44Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR TVR.
01-Sep-2010 11:50:27Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR TVR.
01-Sep-2010 11:54:53Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR East End TVR / water injection problems derate.
01-Sep-2010 12:19:07Metering Authority - Long Island Power Authority REQUESTS SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 12:00 FOR East End TVR.
01-Sep-2010 12:34:06Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 12:00 FOR TVR.
01-Sep-2010 12:39:19Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 12:00 FOR East End TVR.
01-Sep-2010 12:39:53Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 12:00 FOR TVR.
01-Sep-2010 13:38:53Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.
01-Sep-2010 13:38:54Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.
01-Sep-2010 13:38:55Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.
01-Sep-2010 13:38:57Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.
01-Sep-2010 13:38:58Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.
01-Sep-2010 13:39:44Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.
01-Sep-2010 13:39:44Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.
01-Sep-2010 13:39:45Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.
01-Sep-2010 13:40:21Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.
01-Sep-2010 13:41:07Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00.
01-Sep-2010 13:41:07Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00.
01-Sep-2010 13:41:38Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR..
01-Sep-2010 13:42:09Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR..
01-Sep-2010 13:42:37Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 14:00 FOR TVR..
01-Sep-2010 13:42:38Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 14:00 FOR TVR..
01-Sep-2010 13:44:52Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00.
01-Sep-2010 13:44:53Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00.
01-Sep-2010 13:45:56Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR..
01-Sep-2010 13:46:19Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR..
01-Sep-2010 13:46:21Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR for 69KV security.
01-Sep-2010 13:46:36Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 14:00 FOR TVR..
01-Sep-2010 13:46:36Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 14:00 FOR TVR..
01-Sep-2010 13:54:55Metering Authority - New York State Electric & Gas UPDATES NEG WEST_LEA_LOCKPORT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR 115KV.
01-Sep-2010 13:59:48Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.
01-Sep-2010 14:54:47Metering Authority - Niagara Mohawk REMOVES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 14:00.
01-Sep-2010 14:54:48Metering Authority - Niagara Mohawk REMOVES DUNKIRK___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 14:00.
01-Sep-2010 15:29:55Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 15:00 FOR East End TVR.
01-Sep-2010 15:45:21Metering Authority - Long Island Power Authority UPDATES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 15:00 FOR for 69KV security / lost engine derate.
01-Sep-2010 16:26:08Metering Authority - Long Island Power Authority UPDATES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 16:00 FOR East End TVR.
01-Sep-2010 17:03:12Metering Authority - Long Island Power Authority UPDATES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 17:00 FOR for 69KV security.
01-Sep-2010 17:48:18Metering Authority - Long Island Power Authority REQUESTS GLENWOOD_IC_3_G1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 17:00 FOR local voltage support.
01-Sep-2010 18:22:48Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00.
01-Sep-2010 18:22:49Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00.
01-Sep-2010 18:22:49Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00.
01-Sep-2010 18:22:49Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00.
01-Sep-2010 18:22:49Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00.
01-Sep-2010 18:22:49Metering Authority - Long Island Power Authority REMOVES SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00.
01-Sep-2010 18:22:49Metering Authority - Long Island Power Authority REMOVES SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00.
01-Sep-2010 18:22:49Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00.
01-Sep-2010 18:22:49Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00.
01-Sep-2010 18:27:28Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00.
01-Sep-2010 18:27:29Metering Authority - Long Island Power Authority REMOVES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00.
01-Sep-2010 18:53:10Metering Authority - Long Island Power Authority REMOVES GLENWOOD_IC_3_G1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00.
01-Sep-2010 19:05:12Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 19:00.
01-Sep-2010 19:05:12Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 19:00.
01-Sep-2010 20:24:36Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 20:00.
01-Sep-2010 20:39:52Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 20:00.
01-Sep-2010 21:13:53Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00.
01-Sep-2010 21:13:54Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00.
01-Sep-2010 21:13:54Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00.
01-Sep-2010 21:13:54Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00.
01-Sep-2010 21:13:54Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00.
01-Sep-2010 21:13:54Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00.
01-Sep-2010 21:18:17Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00.
01-Sep-2010 21:26:21Metering Authority - New York State Electric & Gas REQUESTS NEG WEST_LEA_LOCKPORT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/02/2010 00:00 FOR 115KV.
01-Sep-2010 21:46:46Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00.
01-Sep-2010 22:29:57Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 22:00.
01-Sep-2010 23:08:17ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/02/2010 00:00 FOR GREENWOOD/STATEN ISLAND LOAD POCKET.

Committed for Reliability

Back to top
Insert TimeMessage
01-Sep-2010 05:07:2409/01/2010 05:07:24 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 09/02/2010 07 to 09/02/2010 21
01-Sep-2010 05:07:2409/01/2010 05:07:24 Generator: SITHE___BATAVIA requested for Day Ahead Reliability in DAM market for 09/02/2010 00 to 09/02/2010 23
01-Sep-2010 05:07:2409/01/2010 05:07:24 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 09/02/2010 00 to 09/02/2010 23
01-Sep-2010 10:43:40Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/02/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:45:41Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 09/02/2010 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:45:41Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 09/02/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:45:41Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 09/02/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:45:41Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 09/02/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:45:41Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 09/02/2010 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:56Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 00 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 05 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 08 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 09 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 10 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 11 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 12 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 13 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 14 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 15 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 16 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 17 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 18 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 19 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 20 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 21 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 06 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 07 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 01 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 04 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 03 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 02 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:58Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 22 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 10:57:58Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 23 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:08:12Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 09 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:08:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 11 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:08:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 15 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:08:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 13 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:08:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 14 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:08:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 10 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:08:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 12 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:08:14Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 17 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:08:14Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 18 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:08:14Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 19 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:08:14Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 20 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:08:14Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 21 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:08:14Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 16 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 09 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 10 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 11 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 12 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 13 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 08 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 07 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 06 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 05 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 04 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 03 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 02 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 01 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 00 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 14 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 16 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 15 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:47Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 17 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:47Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 18 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:47Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 19 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:47Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 20 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:47Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 21 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:47Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 23 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 13:40:47Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 22 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 14:08:43Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 21 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 14:08:43Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 22 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 14:08:43Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 23 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 14:08:43Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 16 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 14:08:43Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 17 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 14:08:43Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 18 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 14:08:43Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 19 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 14:08:43Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 20 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:18Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 04 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:18Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 05 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:18Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 03 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:18Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 02 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:18Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 01 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:18Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 00 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 19 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 18 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 17 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 16 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 15 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 14 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 13 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 12 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 11 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 10 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 09 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 07 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 06 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:19Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 08 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:20Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 21 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:20Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 20 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:20Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 23 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
01-Sep-2010 18:52:20Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 22 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage

Market Pricing Notices

Back to top
Insert TimeMessage
01-Sep-2010 15:55:46Prices in the August 31, 2010 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. NYISO is reserving HB 15 in the August 31, 2010 Hour-Ahead Market for the period hours beginning 12 through 23. Prices in the September 02, 2010 Day-Ahead Market encompassing Energy, Regulation, and Operating Reserves are correct.
01-Sep-2010 16:02:01Prices in the September 01, 2010 Real-Time Market for the period hours beginning 0 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the September 01, 2010 Hour-Ahead Market for the period hours beginning 0 through 11 are correct.
01-Sep-2010 16:43:12NYISO is also reserving HB 16, 17 in the August 31, 2010 Hour-Ahead Market for the period hours beginning 12 through 23.