Insert Time | Message |
01-Sep-2010 00:18:48 | Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 00:00 FOR . |
01-Sep-2010 00:19:21 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 00:00 FOR P/C LOADING. |
01-Sep-2010 00:54:41 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 00:00 FOR P/C LOADING. |
01-Sep-2010 01:33:19 | ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 01:00. |
01-Sep-2010 01:36:55 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 01:00 FOR P/C LOADING. |
01-Sep-2010 01:51:52 | Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 01:00 FOR P/C LOADING. |
01-Sep-2010 01:57:55 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 01:00 FOR ACE. |
01-Sep-2010 02:13:24 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 02:00. |
01-Sep-2010 06:19:48 | Consolidated Edison of NY has Declared Today a Min Oil Burn Day. |
01-Sep-2010 07:01:15 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 07:00 FOR . |
01-Sep-2010 07:08:58 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 07:00. |
01-Sep-2010 07:50:01 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 07:00 FOR GREENWOOD/STATEN ISLAND LOAD POCKET. |
01-Sep-2010 07:51:37 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 07:00 FOR P/C LOADING. |
01-Sep-2010 07:51:49 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 07:00 FOR P/C LOADING. |
01-Sep-2010 08:21:34 | Long Island Power Authority has Declared Today a Min Oil Burn Day |
01-Sep-2010 08:57:44 | Metering Authority - New York State Electric & Gas REQUESTS NEG WEST_LEA_LOCKPORT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 08:00 FOR 115KV. |
01-Sep-2010 08:58:11 | Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 08:00 FOR East End TVR. |
01-Sep-2010 09:09:13 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 09:00 FOR East End TVR. |
01-Sep-2010 09:15:45 | Metering Authority - Niagara Mohawk REMOVES DUNKIRK___1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 09:00. |
01-Sep-2010 09:15:45 | Metering Authority - Niagara Mohawk REMOVES DUNKIRK___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 09:00. |
01-Sep-2010 09:20:05 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 09:00 FOR GREENWOOD/STATEN ISLAND LOAD POCKET. |
01-Sep-2010 09:59:16 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 09:00 FOR East End TVR. |
01-Sep-2010 10:02:56 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 10:00 FOR P/C LOADING. |
01-Sep-2010 10:51:45 | Metering Authority - New York State Electric & Gas UPDATES NEG WEST_LEA_LOCKPORT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 10:00 FOR 115KV. |
01-Sep-2010 11:09:30 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/01/2010 11:00 FOR GREENWOOD/STATEN ISLAND LOAD POCKET. |
01-Sep-2010 11:38:52 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR TVR. |
01-Sep-2010 11:39:24 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR TVR. |
01-Sep-2010 11:39:25 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR TVR. |
01-Sep-2010 11:40:05 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR East End TVR. |
01-Sep-2010 11:40:44 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR TVR. |
01-Sep-2010 11:50:27 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR TVR. |
01-Sep-2010 11:54:53 | Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 11:00 FOR East End TVR / water injection problems derate. |
01-Sep-2010 12:19:07 | Metering Authority - Long Island Power Authority REQUESTS SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 12:00 FOR East End TVR. |
01-Sep-2010 12:34:06 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 12:00 FOR TVR. |
01-Sep-2010 12:39:19 | Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 12:00 FOR East End TVR. |
01-Sep-2010 12:39:53 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 12:00 FOR TVR. |
01-Sep-2010 13:38:53 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR. |
01-Sep-2010 13:38:54 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR. |
01-Sep-2010 13:38:55 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR. |
01-Sep-2010 13:38:57 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR. |
01-Sep-2010 13:38:58 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR. |
01-Sep-2010 13:39:44 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR. |
01-Sep-2010 13:39:44 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR. |
01-Sep-2010 13:39:45 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR. |
01-Sep-2010 13:40:21 | Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR. |
01-Sep-2010 13:41:07 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00. |
01-Sep-2010 13:41:07 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00. |
01-Sep-2010 13:41:38 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.. |
01-Sep-2010 13:42:09 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.. |
01-Sep-2010 13:42:37 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 14:00 FOR TVR.. |
01-Sep-2010 13:42:38 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 14:00 FOR TVR.. |
01-Sep-2010 13:44:52 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00. |
01-Sep-2010 13:44:53 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00. |
01-Sep-2010 13:45:56 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.. |
01-Sep-2010 13:46:19 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR.. |
01-Sep-2010 13:46:21 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR for 69KV security. |
01-Sep-2010 13:46:36 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 14:00 FOR TVR.. |
01-Sep-2010 13:46:36 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 14:00 FOR TVR.. |
01-Sep-2010 13:54:55 | Metering Authority - New York State Electric & Gas UPDATES NEG WEST_LEA_LOCKPORT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR 115KV. |
01-Sep-2010 13:59:48 | Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 13:00 FOR TVR. |
01-Sep-2010 14:54:47 | Metering Authority - Niagara Mohawk REMOVES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 14:00. |
01-Sep-2010 14:54:48 | Metering Authority - Niagara Mohawk REMOVES DUNKIRK___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 14:00. |
01-Sep-2010 15:29:55 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 15:00 FOR East End TVR. |
01-Sep-2010 15:45:21 | Metering Authority - Long Island Power Authority UPDATES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 15:00 FOR for 69KV security / lost engine derate. |
01-Sep-2010 16:26:08 | Metering Authority - Long Island Power Authority UPDATES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 16:00 FOR East End TVR. |
01-Sep-2010 17:03:12 | Metering Authority - Long Island Power Authority UPDATES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 17:00 FOR for 69KV security. |
01-Sep-2010 17:48:18 | Metering Authority - Long Island Power Authority REQUESTS GLENWOOD_IC_3_G1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 17:00 FOR local voltage support. |
01-Sep-2010 18:22:48 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00. |
01-Sep-2010 18:22:49 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00. |
01-Sep-2010 18:22:49 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00. |
01-Sep-2010 18:22:49 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00. |
01-Sep-2010 18:22:49 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00. |
01-Sep-2010 18:22:49 | Metering Authority - Long Island Power Authority REMOVES SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00. |
01-Sep-2010 18:22:49 | Metering Authority - Long Island Power Authority REMOVES SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00. |
01-Sep-2010 18:22:49 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00. |
01-Sep-2010 18:22:49 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00. |
01-Sep-2010 18:27:28 | Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00. |
01-Sep-2010 18:27:29 | Metering Authority - Long Island Power Authority REMOVES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00. |
01-Sep-2010 18:53:10 | Metering Authority - Long Island Power Authority REMOVES GLENWOOD_IC_3_G1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 18:00. |
01-Sep-2010 19:05:12 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 19:00. |
01-Sep-2010 19:05:12 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 19:00. |
01-Sep-2010 20:24:36 | Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 20:00. |
01-Sep-2010 20:39:52 | Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 20:00. |
01-Sep-2010 21:13:53 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00. |
01-Sep-2010 21:13:54 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00. |
01-Sep-2010 21:13:54 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00. |
01-Sep-2010 21:13:54 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00. |
01-Sep-2010 21:13:54 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00. |
01-Sep-2010 21:13:54 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00. |
01-Sep-2010 21:18:17 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00. |
01-Sep-2010 21:26:21 | Metering Authority - New York State Electric & Gas REQUESTS NEG WEST_LEA_LOCKPORT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/02/2010 00:00 FOR 115KV. |
01-Sep-2010 21:46:46 | Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 21:00. |
01-Sep-2010 22:29:57 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 09/01/2010 22:00. |
01-Sep-2010 23:08:17 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/02/2010 00:00 FOR GREENWOOD/STATEN ISLAND LOAD POCKET. |
Insert Time | Message |
01-Sep-2010 05:07:24 | 09/01/2010 05:07:24 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 09/02/2010 07 to 09/02/2010 21 |
01-Sep-2010 05:07:24 | 09/01/2010 05:07:24 Generator: SITHE___BATAVIA requested for Day Ahead Reliability in DAM market for 09/02/2010 00 to 09/02/2010 23 |
01-Sep-2010 05:07:24 | 09/01/2010 05:07:24 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 09/02/2010 00 to 09/02/2010 23 |
01-Sep-2010 10:43:40 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/02/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:45:41 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 09/02/2010 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:45:41 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 09/02/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:45:41 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 09/02/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:45:41 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 09/02/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:45:41 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 09/02/2010 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:56 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 00 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 05 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 08 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 09 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 10 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 11 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 12 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 13 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 14 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 15 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 16 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 17 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 18 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 19 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 20 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 21 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 06 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 07 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 01 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 04 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 03 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 02 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:58 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 22 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 10:57:58 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/02/2010 23 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:08:12 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 09 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:08:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 11 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:08:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 15 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:08:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 13 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:08:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 14 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:08:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 10 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:08:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 12 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:08:14 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 17 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:08:14 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 18 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:08:14 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 19 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:08:14 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 20 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:08:14 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 21 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:08:14 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 09/02/2010 16 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 09 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 10 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 11 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 12 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 13 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 08 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 07 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 06 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 05 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 04 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 03 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 02 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 01 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 00 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 14 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 16 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 15 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:47 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 17 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:47 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 18 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:47 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 19 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:47 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 20 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:47 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 21 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:47 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 23 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 13:40:47 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 09/02/2010 22 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 14:08:43 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 21 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 14:08:43 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 22 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 14:08:43 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 23 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 14:08:43 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 16 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 14:08:43 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 17 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 14:08:43 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 18 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 14:08:43 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 19 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 14:08:43 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/01/2010 20 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:18 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 04 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:18 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 05 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:18 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 03 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:18 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 02 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:18 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 01 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:18 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 00 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 19 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 18 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 17 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 16 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 15 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 14 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 13 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 12 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 11 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 10 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 09 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 07 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 06 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:19 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 08 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:20 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 21 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:20 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 20 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:20 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 23 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-Sep-2010 18:52:20 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 09/02/2010 22 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |