21-Jul-2010 00:14:59ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 00:00.
21-Jul-2010 02:05:18ISO REQUESTS UPPER HUDSON___HYD OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 02:00 FOR OOM to override PURPA generated bid.
21-Jul-2010 07:22:39NYISO Locational based curtailment cut 274 MWs. 07/21/2010 07:22 EDT
21-Jul-2010 07:47:47LONG ISLAND POWER AUTHORITY HAS DECLARED TODAY A MIN OIL BURN DAY
21-Jul-2010 08:01:12ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 08:00 FOR CPS.
21-Jul-2010 08:07:15ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 08:00.
21-Jul-2010 08:45:37Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 08:00 FOR 69KV SECURITY.
21-Jul-2010 08:47:04Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 08:00 FOR 69KV SECURITY.
21-Jul-2010 09:42:43ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 09:00 FOR LOAD POCKET SECURITY.
21-Jul-2010 10:01:26ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 10:00 FOR LOAD POCKET SECURITY.
21-Jul-2010 10:40:14Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 10:00 FOR TVR.
21-Jul-2010 10:52:41Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 10:00 FOR TVR.
21-Jul-2010 10:52:42Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 10:00 FOR TVR.
21-Jul-2010 11:01:54Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 11:00 FOR TVR.
21-Jul-2010 11:01:55Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 11:00 FOR TVR.
21-Jul-2010 11:23:05Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 11:00 FOR TVR.
21-Jul-2010 11:53:56Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 11:00 FOR TVR.
21-Jul-2010 12:30:44Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 12:00 FOR TVR.
21-Jul-2010 12:37:02Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 12:00 FOR TVR.
21-Jul-2010 12:58:00ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 12:00 FOR TSA.
21-Jul-2010 12:58:22NYISO Locational based curtailment cut 143 MWs. 07/21/2010 12:58 EDT
21-Jul-2010 13:05:30THUNDERSTORM ALERT DECLARED
21-Jul-2010 13:05:31NYISO Locational based curtailment cut 440 MWs. 07/21/2010 13:05 EDT
21-Jul-2010 13:21:07NYISO Locational based curtailment cut 440 MWs. 07/21/2010 13:21 EDT
21-Jul-2010 13:22:01ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 13:00 FOR TSA.
21-Jul-2010 14:08:50Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 14:00.
21-Jul-2010 14:08:50Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 14:00.
21-Jul-2010 14:51:42Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 14:00 FOR TVR.
21-Jul-2010 14:53:18ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 14:00.
21-Jul-2010 15:00:19ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 15:00.
21-Jul-2010 15:00:19ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 15:00.
21-Jul-2010 15:06:58Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR.
21-Jul-2010 15:07:28Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR.
21-Jul-2010 15:28:45Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR.
21-Jul-2010 15:36:22Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR.
21-Jul-2010 15:36:22Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR.
21-Jul-2010 15:36:23Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR.
21-Jul-2010 15:37:04Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR Half unit OOM FOR TVR.
21-Jul-2010 15:43:48Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR.
21-Jul-2010 15:44:16Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR.
21-Jul-2010 15:45:19Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR.
21-Jul-2010 15:53:21ISO REQUESTS GOUDEY___8 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 15:00 FOR P/C LOADING.
21-Jul-2010 17:45:25ISO REMOVES GOUDEY___8 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 17:00.
21-Jul-2010 18:06:26Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 18:00 FOR TVR.
21-Jul-2010 18:32:30Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 18:00 FOR 69KV SECURITY.
21-Jul-2010 19:34:04Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 19:00.
21-Jul-2010 20:06:16Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 20:00 FOR 69kv contingency.
21-Jul-2010 20:21:31Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 20:00.
21-Jul-2010 20:56:07Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 20:00 FOR 69kv contingency.
21-Jul-2010 21:22:27NYISO Locational based curtailment cut 25 MWs. 07/21/2010 21:22 EDT
21-Jul-2010 21:42:14Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:15Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR 69KV SECURITY.
21-Jul-2010 21:42:16Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR Half unit OOM FOR TVR.
21-Jul-2010 21:42:17Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:17Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:18Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:19Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:21Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:22Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:24Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:25Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:25Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:27Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:27Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR 69kv contingency.
21-Jul-2010 21:42:28Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:28Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:29Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:42:30Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR.
21-Jul-2010 21:46:06Thunderstorm alert terminated
21-Jul-2010 21:47:10Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00.
21-Jul-2010 21:47:10Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00.
21-Jul-2010 21:47:41Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00.
21-Jul-2010 21:47:41Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00.
21-Jul-2010 21:47:41Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00.
21-Jul-2010 21:51:46Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00 FOR taking off line for 69 kv contingencies.
21-Jul-2010 21:52:14Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00 FOR 69kv contingencies.
21-Jul-2010 21:53:09Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 22:00 FOR 69kv contingencies.
21-Jul-2010 21:53:09Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 22:00 FOR taking off line for 69 kv contingencies.
21-Jul-2010 21:53:58Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00.
21-Jul-2010 21:55:18Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00 FOR 69 kv contingencies.
21-Jul-2010 22:16:27Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 22:00.
21-Jul-2010 22:17:27Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 22:00 FOR 69 kv contingency.
21-Jul-2010 22:17:2907/21/2010 22:15:30 NYISO large event reserve pick-up executed.
21-Jul-2010 22:18:02Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR 69 kv contingency.
21-Jul-2010 23:04:04NPX initiated curtailment cut 50 MWs. 07/21/2010 23:04 EDT

Committed for Reliability

Back to top
Insert TimeMessage
21-Jul-2010 05:06:4607/21/2010 05:06:46 Generator: RAVENSWOOD___2 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23
21-Jul-2010 05:06:4607/21/2010 05:06:46 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23
21-Jul-2010 05:06:4607/21/2010 05:06:46 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23
21-Jul-2010 05:06:4607/21/2010 05:06:46 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 07/22/2010 07 to 07/22/2010 21
21-Jul-2010 05:06:4607/21/2010 05:06:46 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23
21-Jul-2010 05:06:4607/21/2010 05:06:46 Generator: ARTHUR_KILL_3 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23
21-Jul-2010 05:06:4607/21/2010 05:06:46 Generator: SITHE___BATAVIA requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23
21-Jul-2010 05:06:4607/21/2010 05:06:46 Generator: ASTORIA___2 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23
21-Jul-2010 05:06:4607/21/2010 05:06:46 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23
21-Jul-2010 05:06:4607/21/2010 05:06:46 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23
21-Jul-2010 05:06:4607/21/2010 05:06:46 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23
21-Jul-2010 05:06:4607/21/2010 05:06:46 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23
21-Jul-2010 05:06:4607/21/2010 05:06:46 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23
21-Jul-2010 07:53:4107/21/2010 07:53:41 ***Advisory*** Generator: ASTORIA___2 has been deleted for Day Ahead Reliability in DAM market for 07/23/2010 00:00:00 to 07/23/2010 23:00:00
21-Jul-2010 11:31:31Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 00 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:32Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 05 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:32Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 08 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:32Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 07 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:32Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 11 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:32Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 10 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:32Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 09 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:32Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 04 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:32Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 03 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:32Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 02 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:32Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 01 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:32Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 06 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:33Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:33Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:33Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 19 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:33Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 18 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:33Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 17 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:33Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 16 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:33Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 15 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:33Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 14 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:33Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 12 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:33Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 13 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:34Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:31:34Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:33Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:33Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:33Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:33Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:33Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:33Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:33Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:33Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:33Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:33Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:33Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:34Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:34Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:34Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:34Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:34Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:34Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:35Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:35Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:35Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:35Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:35Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:35Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:35Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/22/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:32:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/22/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:33:11Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/22/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 11:33:11Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/22/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 15:14:09Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 11 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 15:14:09Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 21 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 15:14:09Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 20 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 15:14:09Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 19 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 15:14:09Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 18 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 15:14:09Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 17 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 15:14:09Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 16 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 15:14:09Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 15 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 15:14:09Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 14 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 15:14:09Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 13 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jul-2010 15:14:09Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 12 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage

Market Pricing Notices

Back to top
Insert TimeMessage
21-Jul-2010 13:44:57Prices in the July 20, 2010 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the July 20, 2010 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the July 22, 2010 Day-Ahead Market encompassing Energy, Regulation, and Operating Reserves are correct.
21-Jul-2010 14:37:54Prices in the July 21, 2010 Real-Time Market for the period hours beginning 0 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the July 21, 2010 Hour-Ahead Market for the period hours beginning 0 through 11 are correct.