Insert Time | Message |
18-Jul-2010 02:38:10 | Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 02:00. |
18-Jul-2010 03:14:51 | Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 03:00. |
18-Jul-2010 07:57:21 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 07:00 FOR 69kv security. |
18-Jul-2010 08:04:24 | CONSOLIDATED EDISON OF NY HAS DECLARED TODAY A MIN OIL BURN DAY |
18-Jul-2010 08:05:07 | LONG ISLAND POWER AUTHORITY HAS DECLARED TODAY A MIN OIL BURN DAY |
18-Jul-2010 08:31:57 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 08:00 FOR EAST END LOAD. |
18-Jul-2010 08:57:12 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 08:00 FOR 69KV SECURITY. |
18-Jul-2010 09:02:36 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 09:00 FOR EAST END LOAD. |
18-Jul-2010 09:16:38 | Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 09:00 FOR 69KV SECURITY. |
18-Jul-2010 09:39:02 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/18/2010 09:00 FOR LOAD POCKET SECURITY. |
18-Jul-2010 09:49:02 | Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 09:00 FOR 69KV SECURITY. |
18-Jul-2010 09:54:02 | Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 09:00 FOR EAST END LOAD. |
18-Jul-2010 09:59:14 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 09:00 FOR 69KV SECURITY. |
18-Jul-2010 10:12:59 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. TO VOLTAGE SUPPORT AT START TIME 07/18/2010 10:00 FOR EAST END LOAD. |
18-Jul-2010 10:16:28 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/18/2010 10:00 FOR LOAD POCKET SECURITY. |
18-Jul-2010 11:14:54 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 11:00 FOR TVR. |
18-Jul-2010 11:18:02 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/18/2010 11:00 FOR LOAD POCKET SECURITY. |
18-Jul-2010 11:33:21 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 11:00 FOR TVR. |
18-Jul-2010 11:33:21 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 11:00 FOR TVR. |
18-Jul-2010 11:33:40 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/18/2010 11:00 FOR LOAD POCKET SECURITY. |
18-Jul-2010 11:40:01 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/18/2010 11:00 FOR LOAD POCKET SECURITY. |
18-Jul-2010 11:41:04 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 11:00 FOR TVR. |
18-Jul-2010 11:41:05 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 11:00 FOR TVR. |
18-Jul-2010 11:41:05 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 11:00 FOR TVR. |
18-Jul-2010 11:55:56 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/18/2010 11:00 FOR LOAD POCKET SECURITY. |
18-Jul-2010 12:06:38 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 12:00 FOR TVR. |
18-Jul-2010 12:30:18 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 12:00 FOR TVR. |
18-Jul-2010 13:28:13 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/18/2010 13:00 FOR LOAD POCKET SECURITY. |
18-Jul-2010 14:17:22 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 14:00 FOR TVR. |
18-Jul-2010 14:17:57 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 14:00 FOR TVR. |
18-Jul-2010 14:17:58 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 14:00 FOR TVR. |
18-Jul-2010 17:41:55 | Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 17:00. |
18-Jul-2010 18:32:58 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 18:00. |
18-Jul-2010 19:04:51 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 19:00. |
18-Jul-2010 19:29:23 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 19:00. |
18-Jul-2010 19:29:23 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 19:00. |
18-Jul-2010 19:29:23 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 19:00. |
18-Jul-2010 19:29:23 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 19:00. |
18-Jul-2010 19:29:23 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 19:00. |
18-Jul-2010 19:29:23 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 19:00. |
18-Jul-2010 19:29:23 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 19:00. |
18-Jul-2010 19:29:23 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 19:00. |
18-Jul-2010 19:29:24 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 19:00. |
18-Jul-2010 19:29:24 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 19:00. |
18-Jul-2010 19:29:24 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 19:00. |
18-Jul-2010 19:29:24 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 19:00. |
18-Jul-2010 20:17:00 | Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. TO VOLTAGE SUPPORT AT START TIME 07/18/2010 20:00. |
18-Jul-2010 21:23:41 | Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/18/2010 21:00. |
18-Jul-2010 21:27:41 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 00:00 FOR LOAD POCKET SECURITY. |
18-Jul-2010 21:40:28 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 00:00 FOR 69kv security. |
18-Jul-2010 21:40:29 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 00:00 FOR EAST END LOAD. |
Insert Time | Message |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 07/19/2010 00 to 07/19/2010 23 |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: ASTORIA___2 requested for Day Ahead Reliability in DAM market for 07/19/2010 06 to 07/19/2010 23 |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 07/19/2010 00 to 07/19/2010 23 |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: ARTHUR_KILL_3 requested for Day Ahead Reliability in DAM market for 07/19/2010 00 to 07/19/2010 23 |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: NORTHPORT___2 requested for Day Ahead Reliability in DAM market for 07/19/2010 00 to 07/19/2010 23 |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 07/19/2010 00 to 07/19/2010 23 |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 07/19/2010 07 to 07/19/2010 21 |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 07/19/2010 00 to 07/19/2010 23 |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 07/19/2010 00 to 07/19/2010 23 |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: MILLIKEN___1 requested for Day Ahead Reliability in DAM market for 07/19/2010 00 to 07/19/2010 23 |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: RAVENSWOOD___2 requested for Day Ahead Reliability in DAM market for 07/19/2010 00 to 07/19/2010 23 |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 07/19/2010 00 to 07/19/2010 23 |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 07/19/2010 00 to 07/19/2010 23 |
18-Jul-2010 05:03:54 | 07/18/2010 05:03:54 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 07/19/2010 00 to 07/19/2010 23 |
18-Jul-2010 12:08:54 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/19/2010 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 12:08:54 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/19/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 12:08:54 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/19/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 12:08:54 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/19/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 12:09:20 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/19/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 14:11:11 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/19/2010 21 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 14:11:11 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/19/2010 22 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:07:10 | 07/18/2010 16:07:10 ***Advisory*** Generator: ASTORIA___3 has been received for Day Ahead Reliability in DAM market for 07/20/2010 00:00:00 to 07/20/2010 23:00:00 |
18-Jul-2010 16:07:52 | 07/18/2010 16:07:52 ***Advisory*** Generator: RAVENSWOOD___1 has been received for Day Ahead Reliability in DAM market for 07/20/2010 00:00:00 to 07/20/2010 23:00:00 |
18-Jul-2010 16:08:38 | 07/18/2010 16:08:38 ***Advisory*** Generator: ARTHUR_KILL_3 has been received for Day Ahead Reliability in DAM market for 07/20/2010 00:00:00 to 07/20/2010 23:00:00 |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 17 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 13 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 12 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 11 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 10 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 09 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 08 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 07 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 23 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 22 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 21 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 20 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 19 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 18 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 16 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 15 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
18-Jul-2010 16:18:48 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/19/2010 14 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |