Insert Time | Message |
19-Jul-2010 01:39:26 | Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 01:00. |
19-Jul-2010 07:19:26 | ISO REQUESTS RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 07:00 FOR 345KV OVERLOAD. |
19-Jul-2010 07:20:26 | ISO UPDATES RAVENSWOOD___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 07:00 FOR 345KV OVERLOAD. |
19-Jul-2010 07:31:01 | ISO REMOVES RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 07:00. |
19-Jul-2010 07:31:01 | ISO REMOVES RAVENSWOOD___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 07:00. |
19-Jul-2010 07:52:00 | LONG ISLAND POWER AUTHORITY HAS DECLARED TODAY A MIN OIL BURN DAY |
19-Jul-2010 07:53:59 | CONSOLIDATED EDISON OF NY HAS DECLARED TODAY A MIN OIL BURN DAY |
19-Jul-2010 08:10:08 | Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 08:00 FOR 69kv security. |
19-Jul-2010 08:12:31 | NYISO Locational based curtailment cut 200 MWs. 07/19/2010 08:12 EDT |
19-Jul-2010 08:19:59 | O H initiated curtailment cut 200 MWs. 07/19/2010 08:19 EDT |
19-Jul-2010 08:25:53 | Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 08:00 FOR 69kv security. |
19-Jul-2010 08:46:21 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 08:00 FOR ACE. |
19-Jul-2010 09:16:00 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 09:00. |
19-Jul-2010 09:30:21 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 09:00 FOR EAST END TVR. |
19-Jul-2010 09:41:20 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 10:00 FOR ACE. Record deleted in current hour.. |
19-Jul-2010 09:52:12 | THUNDERSTORM HAS BEEN DECLARED FOR NYCA |
19-Jul-2010 09:52:56 | THUNDERSTORM ALERT HAS BEEN TERMINATED |
19-Jul-2010 09:56:17 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 09:00. |
19-Jul-2010 10:24:13 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 10:00 FOR EAST END TVR. |
19-Jul-2010 10:47:00 | Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 10:00 FOR 69KV SECURITY. |
19-Jul-2010 11:36:24 | Metering Authority - New York State Electric & Gas UPDATES GOUDEY___8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 11:00 FOR P/C LOADING. |
19-Jul-2010 14:09:17 | ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 14:00 FOR P/C LOADING. |
19-Jul-2010 14:10:54 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 14:00 FOR TVR. |
19-Jul-2010 14:10:54 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 14:00 FOR TVR. |
19-Jul-2010 14:11:15 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 14:00 FOR TVR. |
19-Jul-2010 14:11:15 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 14:00 FOR TVR. |
19-Jul-2010 14:11:16 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 14:00 FOR TVR. |
19-Jul-2010 14:22:45 | Metering Authority - Orange and Rockland Utilities REQUESTS SHOEMAKER___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 14:00 FOR 115KV P/C LOADING. |
19-Jul-2010 14:37:25 | Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 14:00. |
19-Jul-2010 14:40:39 | ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 14:00 FOR P/C LOADING. |
19-Jul-2010 14:41:08 | ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 14:00 FOR P/C LOADING. |
19-Jul-2010 14:43:19 | ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 14:00. |
19-Jul-2010 14:43:19 | ISO REMOVES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 14:00. |
19-Jul-2010 14:43:59 | ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 15:00 FOR P/C LOADING. |
19-Jul-2010 14:44:39 | ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 15:00 FOR P/C LOADING. |
19-Jul-2010 14:48:05 | NYISO Locational based curtailment cut 300 MWs. 07/19/2010 14:48 EDT |
19-Jul-2010 14:49:31 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 14:00 FOR TVR. |
19-Jul-2010 14:57:52 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 14:00 FOR ACE. |
19-Jul-2010 15:01:11 | THUNDERSTORM ALERT DECLARED |
19-Jul-2010 15:07:59 | NYISO Locational based curtailment cut 200 MWs. 07/19/2010 15:07 EDT |
19-Jul-2010 15:10:21 | NYISO Locational based curtailment cut 200 MWs. 07/19/2010 15:10 EDT |
19-Jul-2010 15:12:42 | NYISO Locational based curtailment cut 300 MWs. 07/19/2010 15:12 EDT |
19-Jul-2010 15:27:16 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 15:00. |
19-Jul-2010 15:42:42 | NYISO Locational based curtailment cut 150 MWs. 07/19/2010 15:42 EDT |
19-Jul-2010 15:43:23 | ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 17:00. |
19-Jul-2010 15:43:25 | ISO REMOVES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 17:00. |
19-Jul-2010 15:43:25 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 17:00. |
19-Jul-2010 15:44:42 | NYISO Locational based curtailment cut 150 MWs. 07/19/2010 15:44 EDT |
19-Jul-2010 16:11:50 | NYISO Locational based curtailment cut 150 MWs. 07/19/2010 16:11 EDT |
19-Jul-2010 16:25:32 | Metering Authority - Orange and Rockland Utilities REMOVES SHOEMAKER___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 16:00. |
19-Jul-2010 16:34:38 | H Q initiated curtailment cut 290 MWs. 07/19/2010 16:34 EDT |
19-Jul-2010 17:05:26 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 17:00 FOR ACE. |
19-Jul-2010 17:12:19 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 17:00. |
19-Jul-2010 17:42:34 | Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 17:00. |
19-Jul-2010 17:57:35 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 17:00 FOR TVR. |
19-Jul-2010 17:57:36 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 17:00 FOR TVR. |
19-Jul-2010 17:57:37 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 17:00 FOR TVR. |
19-Jul-2010 17:57:37 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 17:00 FOR TVR. |
19-Jul-2010 17:58:26 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 17:00 FOR TVR. |
19-Jul-2010 19:06:36 | Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 19:00. |
19-Jul-2010 20:08:22 | Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 20:00 FOR 69KV CONTINGENCY. |
19-Jul-2010 20:36:09 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 20:00. |
19-Jul-2010 20:36:09 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 20:00. |
19-Jul-2010 20:36:09 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 20:00. |
19-Jul-2010 20:36:09 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 20:00. |
19-Jul-2010 20:36:09 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 20:00. |
19-Jul-2010 20:36:09 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 20:00. |
19-Jul-2010 21:02:18 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 21:00. |
19-Jul-2010 21:02:18 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 21:00. |
19-Jul-2010 21:02:19 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 21:00. |
19-Jul-2010 21:02:20 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 21:00. |
19-Jul-2010 21:02:21 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 21:00. |
19-Jul-2010 21:10:22 | THUNDERSTORM ALERT TERMINATED AT 21:03 HRS. |
19-Jul-2010 21:21:35 | Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 21:00 FOR 69KV CONTINGENCY. |
19-Jul-2010 21:31:14 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 21:00 FOR CONTINGENCIES. |
19-Jul-2010 21:54:16 | Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 21:00. |
19-Jul-2010 21:55:42 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 21:00 FOR 69KV CONTINGENCIES. |
19-Jul-2010 22:02:54 | Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2010 22:00. |
19-Jul-2010 22:28:19 | ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 22:00. |
19-Jul-2010 22:33:55 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 22:00 FOR CONTINGENCIES. |
19-Jul-2010 22:34:18 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 23:00 FOR CONTINGENCIES. |
19-Jul-2010 22:34:42 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/20/2010 00:00 FOR CONTINGENCIES. |
19-Jul-2010 22:36:48 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/20/2010 00:00 FOR 69KV CONTINGENCIES. |
19-Jul-2010 23:05:29 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 23:00 FOR . |
19-Jul-2010 23:06:26 | 07/19/2010 23:04:06 NYISO large event reserve pick-up executed. |
19-Jul-2010 23:10:58 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 23:00. |
19-Jul-2010 23:32:53 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2010 23:00. |
Insert Time | Message |
19-Jul-2010 05:03:58 | 07/19/2010 05:03:58 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 07/20/2010 07 to 07/20/2010 21 |
19-Jul-2010 05:03:58 | 07/19/2010 05:03:58 Generator: PORT_JEFF_4 requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 23 |
19-Jul-2010 05:03:58 | 07/19/2010 05:03:58 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 23 |
19-Jul-2010 05:03:58 | 07/19/2010 05:03:58 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 23 |
19-Jul-2010 05:03:58 | 07/19/2010 05:03:58 Generator: MILLIKEN___1 requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 23 |
19-Jul-2010 05:03:58 | 07/19/2010 05:03:58 Generator: RAVENSWOOD___2 requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 23 |
19-Jul-2010 05:03:59 | 07/19/2010 05:03:59 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 23 |
19-Jul-2010 05:03:59 | 07/19/2010 05:03:59 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 23 |
19-Jul-2010 05:03:59 | 07/19/2010 05:03:59 Generator: PORT_JEFF_3 requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 23 |
19-Jul-2010 05:03:59 | 07/19/2010 05:03:59 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 23 |
19-Jul-2010 05:03:59 | 07/19/2010 05:03:59 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 23 |
19-Jul-2010 05:03:59 | 07/19/2010 05:03:59 Generator: ARTHUR_KILL_3 requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 23 |
19-Jul-2010 05:03:59 | 07/19/2010 05:03:59 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 23 |
19-Jul-2010 05:03:59 | 07/19/2010 05:03:59 Generator: SITHE___BATAVIA requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 06 |
19-Jul-2010 05:03:59 | 07/19/2010 05:03:59 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 07/20/2010 00 to 07/20/2010 23 |
19-Jul-2010 10:59:35 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 09 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:35 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 08 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:35 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 07 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:35 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 06 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:35 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 05 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:35 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 04 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:35 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 03 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:35 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 00 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:35 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 01 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:35 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 02 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:36 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 14 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:36 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 15 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:36 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 13 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:36 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 12 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:36 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 11 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:36 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 10 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:37 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 16 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:37 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 17 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:37 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 18 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:37 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 19 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:37 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:37 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:37 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:37 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/20/2010 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:51 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/20/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 10:59:52 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/20/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 11:00:01 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/20/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 11:00:01 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/20/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 06 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 07 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 08 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 09 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 10 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 11 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 12 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 13 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 14 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 15 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 16 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 17 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 18 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 19 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:40 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 20 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:41 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 22 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:25:41 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/20/2010 21 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:14 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 09 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:14 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 10 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:14 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 11 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:14 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 07 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:14 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 08 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:15 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 12 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:15 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 13 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:15 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 14 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:15 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 15 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:15 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 16 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:15 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 17 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:16 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 18 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:16 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 19 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:16 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 23 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:16 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 21 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:16 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 22 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 13:55:16 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/20/2010 20 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:33 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 02 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:33 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 01 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:33 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 00 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 07 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 08 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 09 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 10 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 11 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 13 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 14 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 15 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 16 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 17 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 18 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 19 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 20 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 21 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 22 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 23 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 06 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 05 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 04 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 03 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 19:38:34 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/20/2010 12 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
19-Jul-2010 20:31:42 | 07/19/2010 20:31:42 ***Advisory*** Generator: ASTORIA___2 has been received for Day Ahead Reliability in DAM market for 07/21/2010 00:00:00 to 07/21/2010 23:00:00 |
19-Jul-2010 20:32:19 | 07/19/2010 20:32:19 ***Advisory*** Generator: ARTHUR_KILL_3 has been received for Day Ahead Reliability in DAM market for 07/21/2010 00:00:00 to 07/22/2010 23:00:00 |
19-Jul-2010 20:33:12 | 07/19/2010 20:33:12 ***Advisory*** Generator: RAVENSWOOD___1 has been received for Day Ahead Reliability in DAM market for 07/21/2010 00:00:00 to 07/22/2010 23:00:00 |
19-Jul-2010 20:33:53 | 07/19/2010 20:33:53 ***Advisory*** Generator: ASTORIA___3 has been received for Day Ahead Reliability in DAM market for 07/21/2010 00:00:00 to 07/22/2010 23:00:00 |