Insert Time | Message |
05-Jul-2010 01:32:42 | O H initiated curtailment cut 100 MWs. 07/05/2010 01:32 EDT |
05-Jul-2010 06:22:14 | CONSOLIDATED EDISON OF NY HAS DECLARED TODAY A MINIMUM OIL BURN DAY |
05-Jul-2010 07:53:16 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 07:00 FOR EAST END LOAD. |
05-Jul-2010 09:37:34 | Metering Authority - Long Island Power Authority REQUESTS SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 09:00 FOR East end TVR. |
05-Jul-2010 09:47:37 | Metering Authority - Long Island Power Authority UPDATES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 09:00 FOR East end TVR. |
05-Jul-2010 09:48:45 | LONG ISLAND POWER AUTHORITY HAS DECLARED TODAY A MIN OIL BURN DAY. |
05-Jul-2010 10:05:56 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 10:00 FOR 138KV POST-CONTINGENCY LOADING. |
05-Jul-2010 10:10:43 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 10:00 FOR 138KV ACTUAL LOADING. |
05-Jul-2010 10:17:08 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 10:00 FOR TVR. |
05-Jul-2010 10:40:30 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 10:00 FOR 138KV ACTUAL LOADING. |
05-Jul-2010 10:44:47 | ISO REQUESTS RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 10:00 FOR 138KV ACTUAL FLOWS OVER NORMAL. |
05-Jul-2010 10:45:21 | ISO REQUESTS RAVENSWOOD___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 10:00 FOR 138KV FLOWS OVER NORMAL. |
05-Jul-2010 10:53:28 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 10:00 FOR TVR. |
05-Jul-2010 11:09:21 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 11:00 FOR TVR. |
05-Jul-2010 11:09:22 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 11:00 FOR TVR. |
05-Jul-2010 11:55:45 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 11:00 FOR TVR. |
05-Jul-2010 11:55:45 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 11:00 FOR TVR. |
05-Jul-2010 11:55:45 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 11:00 FOR TVR. |
05-Jul-2010 11:55:46 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 11:00 FOR TVR. |
05-Jul-2010 11:55:46 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 11:00 FOR TVR. |
05-Jul-2010 11:56:46 | Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 11:00 FOR EAST END TVR. |
05-Jul-2010 12:08:48 | ISO REMOVES RAVENSWOOD___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 12:00. |
05-Jul-2010 12:08:48 | ISO REMOVES RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 12:00. |
05-Jul-2010 12:10:11 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 12:00 FOR FAILED START. |
05-Jul-2010 12:12:36 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 12:00 FOR TVR. |
05-Jul-2010 12:12:37 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 12:00 FOR TVR. |
05-Jul-2010 12:35:07 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 12:00 FOR TVR. |
05-Jul-2010 12:35:46 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 12:00 FOR TVR. |
05-Jul-2010 12:48:15 | Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 12:00 FOR 115KV TOWER CONTINGENCY. |
05-Jul-2010 12:49:06 | Metering Authority - Central Hudson Gas and Electr REQUESTS DANSKAMMER___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 12:00 FOR 115KV TOWER CONTINGENCY. |
05-Jul-2010 12:52:19 | Metering Authority - Central Hudson Gas and Electr REMOVES DANSKAMMER___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 12:00. |
05-Jul-2010 12:52:49 | Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 12:00 FOR 115KV TOWER CONTINGENCY. |
05-Jul-2010 12:56:24 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 12:00 FOR TVR. |
05-Jul-2010 12:56:44 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 12:00 FOR TVR. |
05-Jul-2010 13:01:24 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 13:00 FOR 115KV TOWER CONTINGENCY. |
05-Jul-2010 13:01:39 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 13:00 FOR 115KV TOWER CONTINGENCY. |
05-Jul-2010 13:22:23 | Metering Authority - Long Island Power Authority UPDATES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 13:00 FOR Ambient Temperature/TVR. |
05-Jul-2010 13:22:45 | Metering Authority - Long Island Power Authority UPDATES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 13:00 FOR Ambient Temperature/TVR. |
05-Jul-2010 13:30:41 | ISO REQUESTS RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 13:00 FOR 138KV OVERLOADS. |
05-Jul-2010 14:18:42 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 14:00 FOR TVR. |
05-Jul-2010 14:18:43 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 14:00 FOR TVR. |
05-Jul-2010 14:18:45 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 14:00 FOR TVR. |
05-Jul-2010 14:19:32 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 14:00 FOR TVR. |
05-Jul-2010 14:19:57 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 14:00 FOR TVR. |
05-Jul-2010 14:20:22 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 14:00 FOR TVR. |
05-Jul-2010 15:03:07 | Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 15:00 FOR EAST END TVR. |
05-Jul-2010 15:10:58 | Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 15:00 FOR EAST END TVR. |
05-Jul-2010 16:15:00 | Metering Authority - Long Island Power Authority UPDATES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 16:00 FOR East end TVR. |
05-Jul-2010 16:17:00 | Metering Authority - Long Island Power Authority UPDATES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 16:00 FOR TVR. |
05-Jul-2010 16:17:19 | Metering Authority - Long Island Power Authority UPDATES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 16:00 FOR Ambient Temperature/TVR. |
05-Jul-2010 16:17:37 | Metering Authority - Long Island Power Authority UPDATES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 16:00 FOR TVR. |
05-Jul-2010 16:28:48 | Metering Authority - Long Island Power Authority UPDATES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 16:00 FOR East end TVR(1/2 UNIT). |
05-Jul-2010 16:35:30 | Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 16:00 FOR EAST END TVR. |
05-Jul-2010 16:52:59 | Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 16:00 FOR TVR. |
05-Jul-2010 17:00:14 | Metering Authority - Long Island Power Authority UPDATES SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 17:00 FOR TVR. |
05-Jul-2010 17:05:01 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 17:00 FOR 138KV ACTUAL LOADING. |
05-Jul-2010 18:20:03 | Metering Authority - Long Island Power Authority UPDATES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 18:00 FOR EAST END TVR. |
05-Jul-2010 19:04:15 | ISO REQUESTS NEG NORTH_FLCN_SEA OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 19:00 FOR Post contingency loading. |
05-Jul-2010 19:09:26 | Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 19:00. |
05-Jul-2010 19:16:47 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 19:00. |
05-Jul-2010 19:16:47 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 19:00. |
05-Jul-2010 19:16:47 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 19:00. |
05-Jul-2010 19:17:27 | Metering Authority - Long Island Power Authority REMOVES SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 19:00. |
05-Jul-2010 19:25:00 | Metering Authority - Long Island Power Authority REMOVES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 19:00. |
05-Jul-2010 19:45:59 | ISO REMOVES RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 19:00. |
05-Jul-2010 19:47:38 | Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 19:00. |
05-Jul-2010 19:59:58 | ISO REMOVES NEG NORTH_FLCN_SEA OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 22:00. |
05-Jul-2010 20:03:17 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 20:00. |
05-Jul-2010 20:03:17 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 20:00. |
05-Jul-2010 20:12:10 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 20:00. |
05-Jul-2010 20:12:10 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 20:00. |
05-Jul-2010 20:12:11 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 20:00. |
05-Jul-2010 20:20:49 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 20:00. |
05-Jul-2010 21:26:05 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 21:00. |
05-Jul-2010 21:26:05 | Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 21:00. |
05-Jul-2010 21:29:07 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 21:00. |
05-Jul-2010 21:42:35 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 00:00 FOR 138KV ACTUAL LOADING. |
05-Jul-2010 21:45:43 | Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 00:00 FOR 115KV TOWER CONTINGENCY. |
05-Jul-2010 21:45:43 | Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 00:00 FOR 115KV TOWER CONTINGENCY. |
05-Jul-2010 21:49:39 | ISO REQUESTS NEG NORTH_FLCN_SEA OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 22:00 FOR Post contingency loading. |
05-Jul-2010 21:52:24 | ISO REMOVES NEG NORTH_FLCN_SEA OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 22:00. |
05-Jul-2010 22:07:20 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 22:00. |
05-Jul-2010 22:07:21 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 22:00. |
05-Jul-2010 22:16:12 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 22:00. |
05-Jul-2010 22:16:13 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 22:00. |
05-Jul-2010 22:25:43 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 22:00. |
05-Jul-2010 23:04:09 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 23:00 FOR . |
05-Jul-2010 23:14:21 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/05/2010 23:00. |
Insert Time | Message |
05-Jul-2010 05:09:05 | 07/05/2010 05:09:05 Generator: RAVENSWOOD___2 requested for Day Ahead Reliability in DAM market for 07/06/2010 00 to 07/06/2010 23 |
05-Jul-2010 05:09:05 | 07/05/2010 05:09:05 Generator: MILLIKEN___1 requested for Day Ahead Reliability in DAM market for 07/06/2010 00 to 07/06/2010 23 |
05-Jul-2010 05:09:05 | 07/05/2010 05:09:05 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 07/06/2010 00 to 07/06/2010 23 |
05-Jul-2010 05:09:05 | 07/05/2010 05:09:05 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 07/06/2010 00 to 07/06/2010 23 |
05-Jul-2010 05:09:05 | 07/05/2010 05:09:05 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 07/06/2010 00 to 07/06/2010 23 |
05-Jul-2010 05:09:05 | 07/05/2010 05:09:05 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 07/06/2010 00 to 07/06/2010 23 |
05-Jul-2010 05:09:05 | 07/05/2010 05:09:05 Generator: ASTORIA___2 requested for Day Ahead Reliability in DAM market for 07/06/2010 06 to 07/06/2010 23 |
05-Jul-2010 05:09:05 | 07/05/2010 05:09:05 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 07/06/2010 00 to 07/06/2010 23 |
05-Jul-2010 05:09:05 | 07/05/2010 05:09:05 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 07/06/2010 00 to 07/06/2010 23 |
05-Jul-2010 05:09:05 | 07/05/2010 05:09:05 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 07/06/2010 00 to 07/06/2010 23 |
05-Jul-2010 05:09:05 | 07/05/2010 05:09:05 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 07/06/2010 00 to 07/06/2010 23 |
05-Jul-2010 12:07:10 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/06/2010 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 12:07:10 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/06/2010 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 12:07:10 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/06/2010 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 12:07:42 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/06/2010 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 12:07:42 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/06/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 12:07:42 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/06/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:06 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 07 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:07 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 12 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:07 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 13 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:07 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 14 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:07 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 15 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:07 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 16 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:07 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:07 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:07 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 11 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:07 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:08 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 21 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:08 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 17 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:08 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 18 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:08 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 20 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 16:56:08 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/06/2010 19 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:08 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 10 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:08 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 15 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:08 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 14 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:08 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 13 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:08 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 12 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:08 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 11 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:08 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 09 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:08 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 08 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:08 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 07 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:09 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 18 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:09 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 17 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:09 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 16 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:09 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 20 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:09 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 19 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:09 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 22 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:09 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 23 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:44:09 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/06/2010 21 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:58:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/05/2010 22 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 19:58:14 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/05/2010 23 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Jul-2010 23:02:01 | 07/05/2010 23:02:01 ***Advisory*** Generator: RAVENSWOOD___1 has been deleted for Day Ahead Reliability in DAM market for 07/08/2010 01:00:00 to 07/08/2010 23:00:00 |