Insert Time | Message |
04-Jul-2010 08:03:57 | LONG ISLAND POWER AUTHORITY HAS DECLARED TODAY A MIN OIL BURN DAY |
04-Jul-2010 09:13:30 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 09:00 FOR EAST END TVR. |
04-Jul-2010 10:23:22 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 10:00 FOR 69KV SECURITY. |
04-Jul-2010 12:00:46 | Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 12:00 FOR 69KV SECURITY. |
04-Jul-2010 12:27:21 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 12:00 FOR TVR. |
04-Jul-2010 12:28:09 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 12:00 FOR TVR. |
04-Jul-2010 12:28:56 | Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 12:00 FOR 69KV SECURITY. |
04-Jul-2010 12:32:12 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 12:00 FOR TVR. |
04-Jul-2010 12:53:25 | CONSOLIDATED EDISON OF NY HAS DECLARED TODAY A MIN OIL BURN DAY |
04-Jul-2010 12:55:28 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 12:00 FOR 69KV SECURITY. |
04-Jul-2010 13:02:27 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 13:00 FOR TVR. |
04-Jul-2010 13:02:29 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 13:00 FOR TVR. |
04-Jul-2010 13:02:30 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 13:00 FOR TVR. |
04-Jul-2010 13:02:32 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 13:00 FOR TVR. |
04-Jul-2010 13:02:34 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 13:00 FOR TVR. |
04-Jul-2010 13:08:50 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 13:00 FOR TVR. |
04-Jul-2010 15:24:22 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 15:00 FOR EAST END TVR. |
04-Jul-2010 15:33:22 | Metering Authority - Long Island Power Authority REQUESTS SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 15:00 FOR EAST END TVR. |
04-Jul-2010 16:09:25 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 16:00 FOR TVR. |
04-Jul-2010 16:10:22 | Metering Authority - Long Island Power Authority UPDATES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 16:00 FOR TVR. |
04-Jul-2010 16:35:30 | NYISO Locational based curtailment cut 50 MWs. Loss of control of PAR due to fire 07/04/2010 16:35 EDT |
04-Jul-2010 21:45:36 | Metering Authority - Long Island Power Authority REMOVES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 21:00. |
04-Jul-2010 22:33:21 | Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 22:00. |
04-Jul-2010 22:34:05 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 00:00 FOR TVR. |
04-Jul-2010 22:34:06 | Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 00:00 FOR 69KV SECURITY. |
04-Jul-2010 22:34:07 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 00:00 FOR TVR. |
04-Jul-2010 22:34:07 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 00:00 FOR 69KV SECURITY. |
04-Jul-2010 22:34:08 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 00:00 FOR EAST END TVR. |
04-Jul-2010 22:34:09 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 00:00 FOR TVR. |
04-Jul-2010 22:34:09 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 00:00 FOR TVR. |
04-Jul-2010 22:34:10 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 00:00 FOR TVR. |
04-Jul-2010 23:39:43 | Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/04/2010 23:00. |
04-Jul-2010 23:41:15 | Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/05/2010 00:00. |
Insert Time | Message |
04-Jul-2010 05:06:53 | 07/04/2010 05:06:53 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 07/05/2010 00 to 07/05/2010 23 |
04-Jul-2010 05:06:53 | 07/04/2010 05:06:53 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 07/05/2010 00 to 07/05/2010 23 |
04-Jul-2010 05:06:53 | 07/04/2010 05:06:53 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 07/05/2010 00 to 07/05/2010 23 |
04-Jul-2010 05:06:53 | 07/04/2010 05:06:53 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 07/05/2010 06 to 07/05/2010 23 |
04-Jul-2010 05:06:53 | 07/04/2010 05:06:53 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 07/05/2010 00 to 07/05/2010 23 |
04-Jul-2010 05:06:53 | 07/04/2010 05:06:53 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 07/05/2010 00 to 07/05/2010 23 |
04-Jul-2010 05:06:53 | 07/04/2010 05:06:53 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 07/05/2010 00 to 07/05/2010 23 |
04-Jul-2010 05:06:53 | 07/04/2010 05:06:53 Generator: MILLIKEN___1 requested for Day Ahead Reliability in DAM market for 07/05/2010 00 to 07/05/2010 23 |
04-Jul-2010 05:06:53 | 07/04/2010 05:06:53 Generator: RAVENSWOOD___2 requested for Day Ahead Reliability in DAM market for 07/05/2010 00 to 07/05/2010 23 |
04-Jul-2010 05:06:53 | 07/04/2010 05:06:53 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 07/05/2010 00 to 07/05/2010 23 |
04-Jul-2010 07:50:08 | 07/04/2010 07:50:08 ***Advisory*** Generator: ARTHUR_KILL_2 has been modified for Day Ahead Reliability in DAM market for 07/06/2010 00:00:00 to 07/06/2010 23:00:00 |
04-Jul-2010 07:50:48 | 07/04/2010 07:50:48 ***Advisory*** Generator: RAVENSWOOD___1 has been modified for Day Ahead Reliability in DAM market for 07/06/2010 00:00:00 to 07/06/2010 23:00:00 |
04-Jul-2010 07:51:26 | 07/04/2010 07:51:26 ***Advisory*** Generator: RAVENSWOOD___3 has been modified for Day Ahead Reliability in DAM market for 07/06/2010 00:00:00 to 07/06/2010 23:00:00 |
04-Jul-2010 10:33:44 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/05/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 10:33:58 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/05/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 14:37:49 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/05/2010 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 14:37:49 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/05/2010 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 14:37:49 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/05/2010 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 14:37:49 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/05/2010 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 14:37:50 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/05/2010 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 14:37:50 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/05/2010 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 14:37:50 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/05/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 14:37:50 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/05/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 14:37:50 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/05/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 14:37:50 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 07/05/2010 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 15:00:47 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/05/2010 17 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 15:00:47 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/05/2010 16 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 15:00:47 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/05/2010 15 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 15:00:47 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/05/2010 18 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 15 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 19 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 18 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 17 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 16 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 14 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 13 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 12 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 08 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 09 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 10 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Jul-2010 21:40:36 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/05/2010 11 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |