Insert Time | Message |
21-Jul-2010 00:14:59 | ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 00:00. |
21-Jul-2010 02:05:18 | ISO REQUESTS UPPER HUDSON___HYD OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 02:00 FOR OOM to override PURPA generated bid. |
21-Jul-2010 07:22:39 | NYISO Locational based curtailment cut 274 MWs. 07/21/2010 07:22 EDT |
21-Jul-2010 07:47:47 | LONG ISLAND POWER AUTHORITY HAS DECLARED TODAY A MIN OIL BURN DAY |
21-Jul-2010 08:01:12 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 08:00 FOR CPS. |
21-Jul-2010 08:07:15 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 08:00. |
21-Jul-2010 08:45:37 | Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 08:00 FOR 69KV SECURITY. |
21-Jul-2010 08:47:04 | Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 08:00 FOR 69KV SECURITY. |
21-Jul-2010 09:42:43 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 09:00 FOR LOAD POCKET SECURITY. |
21-Jul-2010 10:01:26 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 10:00 FOR LOAD POCKET SECURITY. |
21-Jul-2010 10:40:14 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 10:00 FOR TVR. |
21-Jul-2010 10:52:41 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 10:00 FOR TVR. |
21-Jul-2010 10:52:42 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 10:00 FOR TVR. |
21-Jul-2010 11:01:54 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 11:00 FOR TVR. |
21-Jul-2010 11:01:55 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 11:00 FOR TVR. |
21-Jul-2010 11:23:05 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 11:00 FOR TVR. |
21-Jul-2010 11:53:56 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 11:00 FOR TVR. |
21-Jul-2010 12:30:44 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 12:00 FOR TVR. |
21-Jul-2010 12:37:02 | Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 12:00 FOR TVR. |
21-Jul-2010 12:58:00 | ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 12:00 FOR TSA. |
21-Jul-2010 12:58:22 | NYISO Locational based curtailment cut 143 MWs. 07/21/2010 12:58 EDT |
21-Jul-2010 13:05:30 | THUNDERSTORM ALERT DECLARED |
21-Jul-2010 13:05:31 | NYISO Locational based curtailment cut 440 MWs. 07/21/2010 13:05 EDT |
21-Jul-2010 13:21:07 | NYISO Locational based curtailment cut 440 MWs. 07/21/2010 13:21 EDT |
21-Jul-2010 13:22:01 | ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 13:00 FOR TSA. |
21-Jul-2010 14:08:50 | Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 14:00. |
21-Jul-2010 14:08:50 | Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 14:00. |
21-Jul-2010 14:51:42 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 14:00 FOR TVR. |
21-Jul-2010 14:53:18 | ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 14:00. |
21-Jul-2010 15:00:19 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 15:00. |
21-Jul-2010 15:00:19 | ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 15:00. |
21-Jul-2010 15:06:58 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR. |
21-Jul-2010 15:07:28 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR. |
21-Jul-2010 15:28:45 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR. |
21-Jul-2010 15:36:22 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR. |
21-Jul-2010 15:36:22 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR. |
21-Jul-2010 15:36:23 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR. |
21-Jul-2010 15:37:04 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR Half unit OOM FOR TVR. |
21-Jul-2010 15:43:48 | Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR. |
21-Jul-2010 15:44:16 | Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR. |
21-Jul-2010 15:45:19 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 15:00 FOR TVR. |
21-Jul-2010 15:53:21 | ISO REQUESTS GOUDEY___8 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 15:00 FOR P/C LOADING. |
21-Jul-2010 17:45:25 | ISO REMOVES GOUDEY___8 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/21/2010 17:00. |
21-Jul-2010 18:06:26 | Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 18:00 FOR TVR. |
21-Jul-2010 18:32:30 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 18:00 FOR 69KV SECURITY. |
21-Jul-2010 19:34:04 | Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 19:00. |
21-Jul-2010 20:06:16 | Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 20:00 FOR 69kv contingency. |
21-Jul-2010 20:21:31 | Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 20:00. |
21-Jul-2010 20:56:07 | Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 20:00 FOR 69kv contingency. |
21-Jul-2010 21:22:27 | NYISO Locational based curtailment cut 25 MWs. 07/21/2010 21:22 EDT |
21-Jul-2010 21:42:14 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:15 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR 69KV SECURITY. |
21-Jul-2010 21:42:16 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR Half unit OOM FOR TVR. |
21-Jul-2010 21:42:17 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:17 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:18 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:19 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:21 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:22 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:24 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:25 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:25 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:27 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:27 | Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR 69kv contingency. |
21-Jul-2010 21:42:28 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:28 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:29 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:42:30 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR TVR. |
21-Jul-2010 21:46:06 | Thunderstorm alert terminated |
21-Jul-2010 21:47:10 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00. |
21-Jul-2010 21:47:10 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00. |
21-Jul-2010 21:47:41 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00. |
21-Jul-2010 21:47:41 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00. |
21-Jul-2010 21:47:41 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00. |
21-Jul-2010 21:51:46 | Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00 FOR taking off line for 69 kv contingencies. |
21-Jul-2010 21:52:14 | Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00 FOR 69kv contingencies. |
21-Jul-2010 21:53:09 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 22:00 FOR 69kv contingencies. |
21-Jul-2010 21:53:09 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 22:00 FOR taking off line for 69 kv contingencies. |
21-Jul-2010 21:53:58 | Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00. |
21-Jul-2010 21:55:18 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 21:00 FOR 69 kv contingencies. |
21-Jul-2010 22:16:27 | Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 22:00. |
21-Jul-2010 22:17:27 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/21/2010 22:00 FOR 69 kv contingency. |
21-Jul-2010 22:17:29 | 07/21/2010 22:15:30 NYISO large event reserve pick-up executed. |
21-Jul-2010 22:18:02 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/22/2010 00:00 FOR 69 kv contingency. |
21-Jul-2010 23:04:04 | NPX initiated curtailment cut 50 MWs. 07/21/2010 23:04 EDT |
Insert Time | Message |
21-Jul-2010 05:06:46 | 07/21/2010 05:06:46 Generator: RAVENSWOOD___2 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23 |
21-Jul-2010 05:06:46 | 07/21/2010 05:06:46 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23 |
21-Jul-2010 05:06:46 | 07/21/2010 05:06:46 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23 |
21-Jul-2010 05:06:46 | 07/21/2010 05:06:46 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 07/22/2010 07 to 07/22/2010 21 |
21-Jul-2010 05:06:46 | 07/21/2010 05:06:46 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23 |
21-Jul-2010 05:06:46 | 07/21/2010 05:06:46 Generator: ARTHUR_KILL_3 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23 |
21-Jul-2010 05:06:46 | 07/21/2010 05:06:46 Generator: SITHE___BATAVIA requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23 |
21-Jul-2010 05:06:46 | 07/21/2010 05:06:46 Generator: ASTORIA___2 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23 |
21-Jul-2010 05:06:46 | 07/21/2010 05:06:46 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23 |
21-Jul-2010 05:06:46 | 07/21/2010 05:06:46 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23 |
21-Jul-2010 05:06:46 | 07/21/2010 05:06:46 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23 |
21-Jul-2010 05:06:46 | 07/21/2010 05:06:46 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23 |
21-Jul-2010 05:06:46 | 07/21/2010 05:06:46 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 07/22/2010 00 to 07/22/2010 23 |
21-Jul-2010 07:53:41 | 07/21/2010 07:53:41 ***Advisory*** Generator: ASTORIA___2 has been deleted for Day Ahead Reliability in DAM market for 07/23/2010 00:00:00 to 07/23/2010 23:00:00 |
21-Jul-2010 11:31:31 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 00 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:32 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 05 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:32 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 08 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:32 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 07 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:32 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 11 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:32 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 10 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:32 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 09 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:32 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 04 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:32 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 03 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:32 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 02 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:32 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 01 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:32 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 06 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:33 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:33 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:33 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 19 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:33 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 18 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:33 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 17 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:33 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 16 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:33 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 15 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:33 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 14 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:33 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 12 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:33 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 13 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:34 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:31:34 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/22/2010 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:33 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:33 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:33 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:33 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:33 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:33 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:33 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:33 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:33 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:33 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:33 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:34 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:34 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:34 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:34 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:34 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:34 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:35 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:35 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:35 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:35 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:35 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:35 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:35 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/22/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:59 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/22/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:32:59 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/22/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:33:11 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/22/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 11:33:11 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/22/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 15:14:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 11 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 15:14:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 21 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 15:14:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 20 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 15:14:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 19 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 15:14:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 18 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 15:14:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 17 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 15:14:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 16 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 15:14:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 15 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 15:14:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 14 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 15:14:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 13 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jul-2010 15:14:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/22/2010 12 Energy = 70 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |