Insert Time | Message |
06-Jul-2010 02:01:12 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 02:00 FOR 115KV TOWER CONTINGENCY. |
06-Jul-2010 02:01:32 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 02:00 FOR 115KV TOWER CONTINGENCY. |
06-Jul-2010 05:56:46 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 05:00 FOR . |
06-Jul-2010 06:00:44 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 06:00. |
06-Jul-2010 06:14:08 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 07:00. |
06-Jul-2010 06:16:23 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 06:00 FOR 115KV TOWER CONTINGENCY. |
06-Jul-2010 06:16:37 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 06:00 FOR 115KV TOWER CONTINGENCY. |
06-Jul-2010 06:26:27 | Consolidated Edison of NY has Declared Today a Min Oil Burn Day |
06-Jul-2010 06:31:31 | ISO REQUESTS RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 06:00 FOR Transmission loading. |
06-Jul-2010 06:45:03 | Metering Authority - Niagara Mohawk REMOVES DUNKIRK___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 06:00. |
06-Jul-2010 06:45:03 | Metering Authority - Niagara Mohawk REMOVES DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 06:00. |
06-Jul-2010 06:51:56 | LONG ISLAND POWER AUTHORITY HAS DECLARED TODAY A MIN OIL BURN DAY. |
06-Jul-2010 06:58:46 | ISO REMOVES RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 06:00. |
06-Jul-2010 08:18:17 | 07/06/2010 08:18:00 NYISO large event reserve pick-up executed. |
06-Jul-2010 08:36:56 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 08:00 FOR EAST END TVR. |
06-Jul-2010 08:50:04 | Metering Authority - Long Island Power Authority REQUESTS WEST BABYLON___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 08:00 FOR BRKR SF6 RECHARGE. |
06-Jul-2010 09:06:32 | 07/06/2010 09:05:06 NYISO large event reserve pick-up executed. |
06-Jul-2010 09:07:49 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 09:00 FOR ACE. |
06-Jul-2010 09:16:03 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 09:00. |
06-Jul-2010 09:25:53 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 09:00 FOR TVR. |
06-Jul-2010 09:46:44 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 09:00 FOR EAST END TVR. |
06-Jul-2010 09:54:17 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 09:00 FOR TVR. |
06-Jul-2010 09:55:06 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 09:55:08 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 09:55:09 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 09:55:43 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 09:55:46 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 10:09:26 | Metering Authority - New York State Electric & Gas REQUESTS NEG WEST_LEA_LOCKPORT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR 115KV OVERLOAD. |
06-Jul-2010 10:22:41 | Metering Authority - Niagara Mohawk REQUESTS SITHE___STERLING OUT OF MERIT. TO VOLTAGE SUPPORT AT START TIME 07/06/2010 11:00 FOR VOLT SUPPORT. |
06-Jul-2010 10:35:19 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 10:36:56 | Metering Authority - New York State Electric & Gas UPDATES NEG WEST_LEA_LOCKPORT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR 115KV OVERLOAD. |
06-Jul-2010 10:41:07 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 10:41:08 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 10:48:27 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 10:48:28 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 10:48:30 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 10:48:32 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 10:48:35 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 10:49:13 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 10:49:14 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 10:50:25 | Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 10:51:05 | Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 10:00 FOR TVR. |
06-Jul-2010 11:01:00 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 11:00 FOR 69KV POST CONTINGENCY LOADING. |
06-Jul-2010 11:45:03 | Metering Authority - Long Island Power Authority UPDATES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 11:00 FOR TVR. |
06-Jul-2010 11:58:27 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 12:00 FOR TVR. |
06-Jul-2010 12:00:19 | Metering Authority - New York State Electric & Gas UPDATES NEG WEST_LEA_LOCKPORT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 12:00 FOR 115KV OVERLOAD. |
06-Jul-2010 12:04:36 | Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 12:00 FOR TVR. |
06-Jul-2010 13:43:43 | Metering Authority - Orange and Rockland Utilities REQUESTS MONGAUP___HYD OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 13:00 FOR 115KV POST CONTINGENCY. |
06-Jul-2010 13:44:37 | ISO REQUESTS GLENWOOD___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 13:00 FOR 138KV POST CONTINGENCY LOADING. |
06-Jul-2010 14:01:08 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 14:00 FOR TVR. |
06-Jul-2010 14:17:06 | Metering Authority - Orange and Rockland Utilities REQUESTS SHOEMAKER___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 14:00 FOR 115KV POST CONTINGENCY LOADING. |
06-Jul-2010 14:55:15 | Metering Authority - Long Island Power Authority UPDATES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 14:00 FOR TVR. |
06-Jul-2010 15:02:41 | ISO UPDATES GLENWOOD___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 15:00 FOR 138KV POST CONTINGENCY LOADING. |
06-Jul-2010 15:03:24 | ISO UPDATES GLENWOOD___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 15:00 FOR 138KV POST CONTINGENCY LOADING. |
06-Jul-2010 15:04:26 | ISO REMOVES GLENWOOD___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 15:00. |
06-Jul-2010 15:46:25 | Metering Authority - Long Island Power Authority UPDATES SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 15:00 FOR TVR. |
06-Jul-2010 16:09:39 | ISO REQUESTS GLENWOOD___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 16:00 FOR 138,345KV OVERLOADS. |
06-Jul-2010 16:10:11 | ISO REQUESTS GLENWOOD___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 16:00 FOR 138,345 OVERLOADS. |
06-Jul-2010 16:15:09 | ISO REQUESTS PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 16:00 FOR 345KV OVERLOADS. |
06-Jul-2010 16:25:41 | ISO UPDATES NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 16:00 FOR BACK PRESSURE. |
06-Jul-2010 16:40:53 | Metering Authority - Long Island Power Authority UPDATES SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 16:00 FOR TVR. |
06-Jul-2010 16:45:08 | ISO UPDATES NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 16:00 FOR BACK PRESSURE. |
06-Jul-2010 16:48:15 | Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 16:00 FOR 230KV TOWER CONTINGENCY. |
06-Jul-2010 16:48:52 | Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 16:00 FOR 230KV TOWER CONTINGENCY. |
06-Jul-2010 16:52:53 | Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 16:00 FOR TVR. |
06-Jul-2010 16:56:30 | Metering Authority - Long Island Power Authority UPDATES SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 16:00 FOR TVR. |
06-Jul-2010 17:07:49 | Metering Authority - Long Island Power Authority UPDATES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 17:00 FOR TVR. |
06-Jul-2010 17:14:31 | Metering Authority - Long Island Power Authority UPDATES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 17:00 FOR TVR. |
06-Jul-2010 17:37:43 | ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 17:00 FOR 138KV POST CONTINGENCY LOADING. |
06-Jul-2010 17:38:02 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 17:00 FOR 138KV POST CONTINGENCY LOADING. |
06-Jul-2010 17:38:31 | ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 17:00 FOR 138KV POST CONTINGENCY LOADING. |
06-Jul-2010 17:39:34 | ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 17:00. |
06-Jul-2010 17:40:10 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 17:00 FOR 138KV POST CONTINGENCY LOADING. |
06-Jul-2010 17:53:07 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 17:00 FOR 138KV POST CONTINGENCY LOADING. |
06-Jul-2010 17:55:13 | ISO REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 17:00 FOR 138KV POST CONTINGENCY LOADING. |
06-Jul-2010 18:10:22 | ISO UPDATES FAR ROCKAWAY___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 18:00 FOR 138KV POST CONTINGENCY LOADING. |
06-Jul-2010 19:14:56 | Metering Authority - Orange and Rockland Utilities UPDATES MONGAUP___HYD OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 19:00 FOR 115KV POST CONTINGENCY. |
06-Jul-2010 19:17:13 | Metering Authority - Orange and Rockland Utilities REMOVES SHOEMAKER___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 20:00. |
06-Jul-2010 19:29:09 | Metering Authority - Long Island Power Authority REMOVES WEST BABYLON___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 19:00. |
06-Jul-2010 19:31:53 | Metering Authority - Orange and Rockland Utilities UPDATES MONGAUP___HYD OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 19:00 FOR 115KV POST CONTINGENCY. |
06-Jul-2010 19:58:36 | Metering Authority - Orange and Rockland Utilities UPDATES MONGAUP___HYD OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 19:00 FOR 115KV POST CONTINGENCY. |
06-Jul-2010 20:50:26 | Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 20:00. |
06-Jul-2010 21:21:32 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 21:00 FOR East End TVR. |
06-Jul-2010 21:57:19 | Metering Authority - Orange and Rockland Utilities REMOVES MONGAUP___HYD OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 21:00. |
06-Jul-2010 22:07:46 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/07/2010 00:00 FOR 138KV ACTUAL LOADING. |
06-Jul-2010 22:11:23 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:11:25 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:11:28 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:11:29 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:11:30 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:11:31 | Metering Authority - Long Island Power Authority REMOVES SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:11:33 | Metering Authority - Long Island Power Authority REMOVES SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:17:35 | ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:17:36 | ISO REMOVES GLENWOOD___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:17:36 | ISO REMOVES FAR ROCKAWAY___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:17:37 | ISO REMOVES GLENWOOD___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:21:19 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/07/2010 00:00 FOR EAST END TVR. |
06-Jul-2010 22:21:20 | ISO REQUESTS NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/07/2010 00:00 FOR BACK PRESSURE. |
06-Jul-2010 22:21:22 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/07/2010 00:00 FOR TVR. |
06-Jul-2010 22:21:23 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/07/2010 00:00 FOR TVR. |
06-Jul-2010 22:28:57 | Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/07/2010 00:00 FOR 230KV TOWER CONTINGENCY. |
06-Jul-2010 22:28:57 | Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/07/2010 00:00 FOR 230KV TOWER CONTINGENCY. |
06-Jul-2010 22:30:15 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/07/2010 00:00 FOR EAST END TVR. |
06-Jul-2010 22:47:43 | Metering Authority - New York State Electric & Gas REMOVES NEG WEST_LEA_LOCKPORT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:48:53 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/07/2010 00:00 FOR 69KV POST CONTINGENCY LOADING. |
06-Jul-2010 22:56:31 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:56:31 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:56:32 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:56:32 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 22:56:32 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 22:00. |
06-Jul-2010 23:23:11 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 23:00. |
06-Jul-2010 23:27:04 | Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 23:00. |
06-Jul-2010 23:30:49 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 23:00. |
06-Jul-2010 23:30:49 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 23:00. |
06-Jul-2010 23:30:49 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/06/2010 23:00. |
06-Jul-2010 23:42:41 | ISO REQUESTS NORTHPORT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 23:00 FOR . |
06-Jul-2010 23:43:15 | ISO REQUESTS NORTHPORT___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/06/2010 23:00 FOR . |
Insert Time | Message |
06-Jul-2010 05:09:58 | 07/06/2010 05:09:58 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 07/07/2010 00 to 07/07/2010 23 |
06-Jul-2010 05:09:58 | 07/06/2010 05:09:58 Generator: MILLIKEN___1 requested for Day Ahead Reliability in DAM market for 07/07/2010 00 to 07/07/2010 23 |
06-Jul-2010 05:09:58 | 07/06/2010 05:09:58 Generator: SITHE___BATAVIA requested for Day Ahead Reliability in DAM market for 07/07/2010 00 to 07/07/2010 06 |
06-Jul-2010 05:09:58 | 07/06/2010 05:09:58 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 07/07/2010 00 to 07/07/2010 23 |
06-Jul-2010 10:23:54 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/06/2010 16 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 10:23:54 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/06/2010 17 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 10:23:54 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/06/2010 14 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 10:23:54 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/06/2010 18 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 10:23:54 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/06/2010 12 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 10:23:54 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/06/2010 13 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 10:23:54 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/06/2010 15 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 10:23:55 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/06/2010 21 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 10:23:55 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/06/2010 22 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 10:23:55 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/06/2010 23 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 10:23:55 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/06/2010 19 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 10:23:55 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/06/2010 20 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 10:42:55 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 07/07/2010 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 10:43:09 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/07/2010 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 11:24:44 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/07/2010 22 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 11:24:44 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/07/2010 21 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 11:24:44 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 07/07/2010 23 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:37 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 07 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:37 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 08 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:37 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 09 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:37 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 10 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:37 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 11 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:37 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 12 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:38 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 13 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:38 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 14 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:38 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 15 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:38 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 16 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:38 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 17 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:39 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 18 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:39 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 19 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:39 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 20 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:05:39 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 07/07/2010 21 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:37 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 00 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:38 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 01 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:38 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 06 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:38 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 05 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:38 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 04 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:38 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 03 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:38 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 02 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:39 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 11 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:39 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 10 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:39 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 09 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:39 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 08 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:39 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 07 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:39 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 12 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:40 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 15 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:40 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 16 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:40 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 17 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:40 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 18 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:40 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 19 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:40 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 20 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:40 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 13 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:40 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 14 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:06:41 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 07/07/2010 21 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:44:40 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/07/2010 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:44:40 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/07/2010 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:44:40 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/07/2010 07 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
06-Jul-2010 12:44:54 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/07/2010 21 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |