P-2525-Jul-2010

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices
Market Pricing Notices

Dispatcher Notices

Back to top
Insert TimeMessage
25-Jul-2010 00:41:09Metering Authority - Long Island Power Authority REQUESTS NORTHPORT___1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 00:00 FOR UNSCHEDULED TRANSMISSION WORK.
25-Jul-2010 00:41:58Metering Authority - Long Island Power Authority REQUESTS NORTHPORT___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 00:00 FOR UNSCHEDULED TRANSMISSION WORK.
25-Jul-2010 00:42:38Metering Authority - Long Island Power Authority REQUESTS NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 00:00 FOR UNSCHEDULED TRANSMISSION WORK.
25-Jul-2010 00:43:22Metering Authority - Long Island Power Authority REQUESTS NORTHPORT___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 00:00 FOR UNSCHEDULED TRANSMISSION WORK.
25-Jul-2010 01:12:41Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 01:00.
25-Jul-2010 01:14:02Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 01:00.
25-Jul-2010 01:32:19Metering Authority - Long Island Power Authority UPDATES NORTHPORT___1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 01:00 FOR UNSCHEDULED TRANSMISSION WORK.
25-Jul-2010 02:11:27Metering Authority - Long Island Power Authority UPDATES NORTHPORT___1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 02:00 FOR UNSCHEDULED TRANSMISSION WORK.
25-Jul-2010 03:28:27NYISO Locational based curtailment cut 50 MWs. 07/25/2010 03:28 EDT
25-Jul-2010 04:23:54Metering Authority - Long Island Power Authority UPDATES NORTHPORT___1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 04:00 FOR UNSCHEDULED TRANSMISSION WORK.
25-Jul-2010 04:42:07ISO REQUESTS RAVENSWOOD___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 05:00 FOR ACTUAL AND P/C LOADING.
25-Jul-2010 05:07:41ISO REMOVES RAVENSWOOD___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 05:00.
25-Jul-2010 07:21:29Metering Authority - Long Island Power Authority REMOVES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 07:00.
25-Jul-2010 07:21:29Metering Authority - Long Island Power Authority REMOVES NORTHPORT___1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 07:00.
25-Jul-2010 07:21:30Metering Authority - Long Island Power Authority REMOVES NORTHPORT___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 07:00.
25-Jul-2010 07:21:30Metering Authority - Long Island Power Authority REMOVES NORTHPORT___3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 07:00.
25-Jul-2010 07:42:53Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 07:00 FOR TVR.
25-Jul-2010 08:14:58Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 08:00 FOR TVR.
25-Jul-2010 08:37:43Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 08:00.
25-Jul-2010 08:38:21Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 08:00 FOR TVR.
25-Jul-2010 08:52:48Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 08:00 FOR TVR.
25-Jul-2010 09:21:13Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 09:00 FOR East end TVR.
25-Jul-2010 09:28:02Consolidated Edison of NY HAS DECLARED TODAY A MIN OIL BURN DAY
25-Jul-2010 09:39:09Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 09:00 FOR 69KV CONTINGENCIES.
25-Jul-2010 09:50:35Metering Authority - Long Island Power Authority REQUESTS SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 09:00 FOR TVR.
25-Jul-2010 10:29:24Long Island Power Authority HAS DECLARED TODAY A MIN OIL BURN DAY
25-Jul-2010 10:54:21Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 10:00 FOR 69KV CONTINGENCIES.
25-Jul-2010 10:59:05Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 10:00 FOR TVR.
25-Jul-2010 10:59:56Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 10:00 FOR TVR.
25-Jul-2010 11:02:49Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 11:00 FOR TVR.
25-Jul-2010 11:03:29Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 11:00 FOR TVR.
25-Jul-2010 11:09:04Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 11:00 FOR TVR.
25-Jul-2010 11:45:37Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 11:00 FOR TVR.
25-Jul-2010 12:38:05Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 12:00 FOR TVR.
25-Jul-2010 12:38:06Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 12:00 FOR TVR.
25-Jul-2010 12:38:06Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 12:00 FOR TVR.
25-Jul-2010 12:38:06Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 12:00 FOR TVR.
25-Jul-2010 12:39:06Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 12:00 FOR TVR.
25-Jul-2010 13:50:40Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 13:00 FOR TVR.
25-Jul-2010 15:07:58NYISO Locational based curtailment cut 418 MWs. 07/25/2010 15:07 EDT
25-Jul-2010 15:09:49NYISO Locational based curtailment cut 400 MWs. 07/25/2010 15:09 EDT
25-Jul-2010 15:12:39NYISO Locational based curtailment cut 418 MWs. 07/25/2010 15:12 EDT
25-Jul-2010 15:15:36NYISO Locational based curtailment cut 400 MWs. 07/25/2010 15:15 EDT
25-Jul-2010 15:22:44NPX initiated curtailment cut 25 MWs. 07/25/2010 15:22 EDT
25-Jul-2010 16:03:13THUNDERSTORM ALERT DECLARED AT 14:55 HRS THUNDERSTORM ALERT TERMINATED AT 15:53 HRS
25-Jul-2010 16:33:17Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 16:00.
25-Jul-2010 16:49:02Metering Authority - Long Island Power Authority UPDATES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 16:00 FOR TVR.
25-Jul-2010 16:49:24Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 17:00 FOR TVR.
25-Jul-2010 16:56:24Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 16:00.
25-Jul-2010 16:56:24Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 16:00.
25-Jul-2010 16:56:24Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 16:00.
25-Jul-2010 16:56:25Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 16:00.
25-Jul-2010 16:56:25Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 16:00.
25-Jul-2010 16:56:25Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 16:00.
25-Jul-2010 16:57:06ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 16:00 FOR ISO RELIABILITY.
25-Jul-2010 16:59:19ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 16:00.
25-Jul-2010 17:39:02Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 17:00.
25-Jul-2010 17:39:02Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 17:00.
25-Jul-2010 18:10:51Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 18:00.
25-Jul-2010 18:10:51Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 18:00.
25-Jul-2010 18:10:52Metering Authority - Long Island Power Authority REMOVES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 18:00.
25-Jul-2010 18:10:52Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 18:00.
25-Jul-2010 18:53:58Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 18:00 FOR 69KV POST CONTINGENCY.
25-Jul-2010 19:03:43ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 19:00 FOR ACE.
25-Jul-2010 19:11:38Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 19:00.
25-Jul-2010 19:11:39Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 19:00.
25-Jul-2010 19:12:54ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 19:00.
25-Jul-2010 19:42:39Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 19:00 FOR 69KV POST CONTINGENCY.
25-Jul-2010 19:54:28ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 19:00 FOR 138KV POST CONTINGENCY LOADING.
25-Jul-2010 20:27:14ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 20:00 FOR 138KV POST CONTINGENCY LOADING.
25-Jul-2010 20:51:44ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 20:00 FOR 138KV POST CONTINGENCY LOADING.
25-Jul-2010 20:52:12ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 20:00 FOR 138KV POST CONTINGENCY LOADING.
25-Jul-2010 20:57:42ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 20:00 FOR 138KV POST CONTINGENCY LOADING.
25-Jul-2010 20:57:54ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 20:00 FOR 138KV POST CONTINGENCY LOADING.
25-Jul-2010 20:58:37Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 20:00.
25-Jul-2010 21:21:34ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/26/2010 00:00 FOR Actual loading.
25-Jul-2010 21:26:18ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/26/2010 00:00 FOR 138KV POST CONTINGENCY LOADING.
25-Jul-2010 21:26:19ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/26/2010 00:00 FOR 138KV POST CONTINGENCY LOADING.
25-Jul-2010 22:02:11ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 22:00 FOR .
25-Jul-2010 22:05:19ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/25/2010 22:00.
25-Jul-2010 22:22:42Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 22:00.
25-Jul-2010 22:29:33Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 22:00.
25-Jul-2010 22:47:58Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 22:00 FOR 69KV POST CONTINGENCY.
25-Jul-2010 23:28:33Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/25/2010 23:00.

Committed for Reliability

Back to top
Insert TimeMessage
25-Jul-2010 05:04:3207/25/2010 05:04:32 Generator: RAVENSWOOD___2 requested for Day Ahead Reliability in DAM market for 07/26/2010 06 to 07/26/2010 23
25-Jul-2010 05:04:3207/25/2010 05:04:32 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 07/26/2010 00 to 07/26/2010 23
25-Jul-2010 05:04:3207/25/2010 05:04:32 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 07/26/2010 00 to 07/26/2010 23
25-Jul-2010 05:04:3207/25/2010 05:04:32 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 07/26/2010 07 to 07/26/2010 21
25-Jul-2010 05:04:3207/25/2010 05:04:32 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 07/26/2010 00 to 07/26/2010 23
25-Jul-2010 05:04:3207/25/2010 05:04:32 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 07/26/2010 00 to 07/26/2010 23
25-Jul-2010 05:04:3207/25/2010 05:04:32 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 07/26/2010 00 to 07/26/2010 23
25-Jul-2010 05:04:3307/25/2010 05:04:33 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 07/26/2010 00 to 07/26/2010 23
25-Jul-2010 05:04:3307/25/2010 05:04:33 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 07/26/2010 06 to 07/26/2010 23
25-Jul-2010 05:04:3307/25/2010 05:04:33 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 07/26/2010 00 to 07/26/2010 23
25-Jul-2010 11:49:19Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/26/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:49:19Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/26/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:49:19Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/26/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:49:19Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/26/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:49:52Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/26/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:49:52Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/26/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:49:52Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/26/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:49:52Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/26/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:05Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:05Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:05Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:05Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:05Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:05Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:06Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:06Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:06Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:06Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:06Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:06Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:06Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:06Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:06Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:06Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:06Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:06Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:06Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:07Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:07Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:07Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:07Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:51:07Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/26/2010 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 00 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 01 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 02 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 03 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 04 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 05 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 06 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 07 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 15 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 14 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 08 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 12 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 13 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 09 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 10 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 11 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:36Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 19 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:36Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 18 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:36Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 17 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:36Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 16 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:36Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:36Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:36Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 11:52:36Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 07/26/2010 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 12:15:3107/25/2010 12:15:31 ***Advisory*** Generator: ASTORIA___4 has been received for Day Ahead Reliability in DAM market for 07/27/2010 00:00:00 to 07/29/2010 23:00:00
25-Jul-2010 13:43:38Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/26/2010 09 Energy = 71 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 13:43:38Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/26/2010 10 Energy = 71 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 13:43:38Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/26/2010 11 Energy = 71 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 13:43:38Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/26/2010 12 Energy = 71 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 13:43:38Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/26/2010 13 Energy = 71 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 13:43:38Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/26/2010 14 Energy = 71 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 13:43:38Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/26/2010 15 Energy = 71 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 13:43:38Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/26/2010 16 Energy = 71 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 13:43:39Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/26/2010 19 Energy = 71 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 13:43:39Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/26/2010 20 Energy = 71 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 13:43:39Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/26/2010 21 Energy = 71 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 13:43:39Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/26/2010 18 Energy = 71 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
25-Jul-2010 13:43:39Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/26/2010 17 Energy = 71 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage

Market Pricing Notices

Back to top
Insert TimeMessage
25-Jul-2010 14:42:35Prices in the July 24, 2010 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the July 24, 2010 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the July 26, 2010 Day-Ahead Market encompassing Energy, Regulation, and Operating Reserves are correct.
25-Jul-2010 14:51:17Prices in the July 25, 2010 Real-Time Market for the period hours beginning 0 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the July 25, 2010 Hour-Ahead Market for the period hours beginning 0 through 11 are correct.