Insert Time | Message |
28-Jun-2010 00:13:21 | Metering Authority - Consolidated Edison of NY REQUESTS RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 00:00 FOR STARTUP. |
28-Jun-2010 00:36:31 | ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 00:00. |
28-Jun-2010 00:52:12 | Metering Authority - Long Island Power Authority REMOVES KEDC_GLWD_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 00:00. |
28-Jun-2010 04:33:47 | Consolidated Edison of NY HAD DECLARED TODAY A MIN OIL BURN DAY |
28-Jun-2010 07:33:45 | LONG ISLAND POWER AUTHORITY HAS DECLARED TODAY A MIN OIL BURN DAY |
28-Jun-2010 08:01:21 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 08:00 FOR EAST END LOAD. |
28-Jun-2010 08:20:08 | Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 08:00 FOR P/C LOADING. |
28-Jun-2010 08:20:49 | Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 08:00 FOR P/C LOADING. |
28-Jun-2010 08:21:30 | Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 08:00 FOR P/C LOADING. |
28-Jun-2010 08:33:32 | Metering Authority - Long Island Power Authority REQUESTS GLENWOOD___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 08:00 FOR 69KV SECURITY. |
28-Jun-2010 08:48:02 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 08:00 FOR tvr. |
28-Jun-2010 08:48:38 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 08:00 FOR tvr. |
28-Jun-2010 08:49:09 | Metering Authority - Long Island Power Authority UPDATES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 08:00 FOR tvr. |
28-Jun-2010 08:49:40 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 08:00 FOR tvr. |
28-Jun-2010 09:43:06 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 09:00 FOR EAST END LOAD. |
28-Jun-2010 09:55:26 | Metering Authority - Long Island Power Authority REMOVES GLENWOOD___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 09:00. |
28-Jun-2010 10:15:46 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 10:00 FOR TVR. |
28-Jun-2010 10:15:46 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 10:00 FOR TVR. |
28-Jun-2010 10:15:47 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 10:00 FOR TVR. |
28-Jun-2010 10:15:47 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 10:00 FOR TVR. |
28-Jun-2010 10:20:02 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 10:00 FOR TVR. |
28-Jun-2010 10:20:54 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 10:00 FOR TVR. |
28-Jun-2010 10:27:11 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 10:00 FOR 69KV SECURITY. |
28-Jun-2010 10:37:03 | Metering Authority - New York State Electric & Gas REQUESTS NEG CENTRAL___STATE_STREET OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 10:00 FOR 115KV SECURITY. |
28-Jun-2010 11:02:20 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 11:00 FOR east end tvr. |
28-Jun-2010 11:02:49 | Metering Authority - Long Island Power Authority UPDATES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 11:00 FOR east end tvr. |
28-Jun-2010 11:08:10 | Metering Authority - Long Island Power Authority UPDATES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 11:00 FOR 69KV SECURITY. |
28-Jun-2010 11:17:09 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 11:00 FOR TVR. |
28-Jun-2010 11:41:57 | NYISO Locational based curtailment cut 60 MWs. 06/28/2010 11:41 EDT |
28-Jun-2010 12:07:49 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 12:00 FOR TVR. |
28-Jun-2010 12:07:50 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 12:00 FOR TVR. |
28-Jun-2010 12:07:52 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 12:00 FOR TVR. |
28-Jun-2010 12:07:54 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 12:00 FOR TVR. |
28-Jun-2010 12:08:53 | Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 12:00 FOR TVR. |
28-Jun-2010 12:45:37 | Metering Authority - Long Island Power Authority REQUESTS GLENWOOD_IC_2_G1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 12:00 FOR LOCAL RELIABILTY RULES.. |
28-Jun-2010 12:46:33 | Metering Authority - Long Island Power Authority REQUESTS GLENWOOD_IC_3_G1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 12:00 FOR LOCAL RELIABILITY RULES. |
28-Jun-2010 13:19:31 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 13:00 FOR TVR. |
28-Jun-2010 13:20:09 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 13:00 FOR TVR. |
28-Jun-2010 13:20:36 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 13:00 FOR TVR. |
28-Jun-2010 13:21:00 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 13:00 FOR TVR. |
28-Jun-2010 13:21:52 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 13:00 FOR TVR. |
28-Jun-2010 13:22:17 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 13:00 FOR TVR. |
28-Jun-2010 13:24:23 | Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 13:00 FOR 69KV SECURITY. |
28-Jun-2010 13:32:41 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 13:00 FOR east end tvr. |
28-Jun-2010 13:42:02 | Metering Authority - Long Island Power Authority UPDATES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 13:00 FOR east end tvr. |
28-Jun-2010 14:02:09 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 14:00 FOR TVR. |
28-Jun-2010 14:28:24 | 06/28/2010 14:28:06 NYISO large event reserve pick-up executed. |
28-Jun-2010 14:29:18 | ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 14:00 FOR NYISO UNIT LOSS. |
28-Jun-2010 14:37:25 | ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 14:00 FOR NYISO UNIT LOSS. |
28-Jun-2010 14:37:51 | ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 14:00 FOR NYISO UNIT LOSS. |
28-Jun-2010 14:43:41 | ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 14:00 FOR TSA. |
28-Jun-2010 14:44:43 | H Q initiated curtailment cut 400 MWs. 06/28/2010 14:44 EDT |
28-Jun-2010 14:46:24 | Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 14:00 FOR 69KV SECURITY. |
28-Jun-2010 14:53:42 | ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 14:00 FOR TSA. |
28-Jun-2010 14:58:42 | ISO REQUESTS NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 14:00 FOR TSA. |
28-Jun-2010 14:59:35 | ISO REQUESTS NORTHPORT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 14:00 FOR TSA. |
28-Jun-2010 15:09:14 | ISO REQUESTS ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 15:00 FOR TSA OVERLOADS. |
28-Jun-2010 15:10:22 | ISO UPDATES NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 15:00 FOR TSA. |
28-Jun-2010 15:11:06 | ISO UPDATES NORTHPORT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 15:00 FOR TSA. |
28-Jun-2010 15:16:32 | ISO UPDATES NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 15:00 FOR TSA. |
28-Jun-2010 15:16:44 | Thunder Storm Alert Declared at 14:40 |
28-Jun-2010 15:17:22 | ISO UPDATES NORTHPORT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 15:00 FOR TSA. |
28-Jun-2010 15:19:02 | ISO UPDATES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 15:00 FOR TSA OVERLOADS. |
28-Jun-2010 15:29:54 | ISO UPDATES NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 15:00 FOR TSA. |
28-Jun-2010 15:30:38 | ISO UPDATES NORTHPORT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 15:00 FOR TSA. |
28-Jun-2010 15:34:42 | Metering Authority - Long Island Power Authority REQUESTS SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 15:00 FOR TVR. |
28-Jun-2010 15:35:45 | ISO UPDATES NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 15:00 FOR TSA. |
28-Jun-2010 15:36:36 | ISO UPDATES NORTHPORT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 15:00 FOR TSA. |
28-Jun-2010 15:51:55 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 15:00 FOR TVR. |
28-Jun-2010 15:58:11 | ISO REMOVES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 15:00. |
28-Jun-2010 15:58:11 | ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 15:00. |
28-Jun-2010 16:00:12 | ISO REMOVES NORTHPORT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 16:00:12 | ISO REMOVES NORTHPORT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 16:00:51 | Metering Authority - Long Island Power Authority UPDATES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 16:00 FOR EAST END LOAD. |
28-Jun-2010 16:02:12 | Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 16:00 FOR EAST END LOAD. |
28-Jun-2010 16:03:47 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 16:00 FOR CPS. |
28-Jun-2010 16:04:31 | Metering Authority - Long Island Power Authority UPDATES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 16:00 FOR TVR. |
28-Jun-2010 16:12:12 | ISO REMOVES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 16:00. |
28-Jun-2010 16:13:34 | ISO UPDATES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 16:00 FOR TSA. |
28-Jun-2010 16:18:14 | Metering Authority - Long Island Power Authority UPDATES SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 16:00 FOR TVR. |
28-Jun-2010 16:38:57 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 16:00. |
28-Jun-2010 17:03:13 | Metering Authority - Long Island Power Authority REMOVES GLENWOOD_IC_2_G1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 17:03:13 | Metering Authority - Long Island Power Authority REMOVES GLENWOOD_IC_3_G1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 17:05:40 | Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 17:05:40 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 17:05:40 | Metering Authority - Long Island Power Authority REMOVES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 17:13:37 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 17:13:37 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 17:13:37 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 17:13:38 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 17:13:38 | Metering Authority - Long Island Power Authority REMOVES SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 17:13:38 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 17:42:47 | NYISO Thunder Storm Alert Terminated 17:32 |
28-Jun-2010 17:58:59 | Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 17:58:59 | Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 17:58:59 | Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 17:00. |
28-Jun-2010 19:13:08 | H Q initiated curtailment cut 6 MWs. 06/28/2010 19:13 EDT |
28-Jun-2010 19:27:07 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 19:00. |
28-Jun-2010 19:29:22 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 19:00. |
28-Jun-2010 19:52:24 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 19:00. |
28-Jun-2010 19:52:24 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 19:00. |
28-Jun-2010 20:32:57 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 20:00. |
28-Jun-2010 20:39:54 | Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 20:00. |
28-Jun-2010 21:25:00 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 21:00. |
28-Jun-2010 22:03:57 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 22:00. |
28-Jun-2010 22:03:58 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 22:00. |
28-Jun-2010 22:15:18 | Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 22:00. |
28-Jun-2010 22:17:26 | Metering Authority - New York State Electric & Gas REMOVES NEG CENTRAL___STATE_STREET OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 22:00. |
28-Jun-2010 22:24:45 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 22:00. |
28-Jun-2010 22:24:45 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 22:00. |
28-Jun-2010 22:24:46 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 22:00. |
28-Jun-2010 22:36:10 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/28/2010 22:00 FOR 36312 p/c flow. |
28-Jun-2010 22:50:34 | Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 22:00. |
28-Jun-2010 22:54:58 | Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/28/2010 22:00. |
28-Jun-2010 23:02:47 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/29/2010 00:00 FOR 36312 p/c flow. |
Insert Time | Message |
28-Jun-2010 05:06:31 | 06/28/2010 05:06:31 Generator: RAVENSWOOD___2 requested for Day Ahead Reliability in DAM market for 06/29/2010 00 to 06/29/2010 23 |
28-Jun-2010 05:06:31 | 06/28/2010 05:06:31 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 06/29/2010 00 to 06/29/2010 23 |
28-Jun-2010 05:06:31 | 06/28/2010 05:06:31 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 06/29/2010 07 to 06/29/2010 21 |
28-Jun-2010 05:06:31 | 06/28/2010 05:06:31 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 06/29/2010 00 to 06/29/2010 23 |
28-Jun-2010 05:06:31 | 06/28/2010 05:06:31 Generator: ARTHUR_KILL_3 requested for Day Ahead Reliability in DAM market for 06/29/2010 00 to 06/29/2010 23 |
28-Jun-2010 05:06:31 | 06/28/2010 05:06:31 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 06/29/2010 00 to 06/29/2010 23 |
28-Jun-2010 05:06:31 | 06/28/2010 05:06:31 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 06/29/2010 00 to 06/29/2010 23 |
28-Jun-2010 05:06:31 | 06/28/2010 05:06:31 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 06/29/2010 00 to 06/29/2010 23 |
28-Jun-2010 05:06:31 | 06/28/2010 05:06:31 Generator: GOUDEY___8 requested for Day Ahead Reliability in DAM market for 06/29/2010 00 to 06/29/2010 23 |
28-Jun-2010 05:06:31 | 06/28/2010 05:06:31 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 06/29/2010 00 to 06/29/2010 23 |
28-Jun-2010 05:06:31 | 06/28/2010 05:06:31 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 06/29/2010 00 to 06/29/2010 23 |
28-Jun-2010 05:06:31 | 06/28/2010 05:06:31 Generator: BINGHAMTON___COGEN requested for Day Ahead Reliability in DAM market for 06/29/2010 12 to 06/29/2010 17 |
28-Jun-2010 05:06:31 | 06/28/2010 05:06:31 Generator: RAVENSWOOD___4 requested for Day Ahead Reliability in DAM market for 06/29/2010 00 to 06/29/2010 23 |
28-Jun-2010 10:33:33 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/29/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
28-Jun-2010 10:33:34 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/29/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
28-Jun-2010 10:33:34 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/29/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
28-Jun-2010 10:33:52 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/29/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
28-Jun-2010 10:33:52 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/29/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
28-Jun-2010 10:33:52 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/29/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
28-Jun-2010 10:33:52 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/29/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
28-Jun-2010 10:34:05 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/29/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
28-Jun-2010 10:34:05 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/29/2010 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
28-Jun-2010 10:34:05 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/29/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
28-Jun-2010 10:34:06 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/29/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
28-Jun-2010 10:34:06 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/29/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
28-Jun-2010 10:34:25 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 06/29/2010 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
28-Jun-2010 12:40:28 | 06/28/2010 12:40:28 ***Advisory*** Generator: ASTORIA___3 has been received for Day Ahead Reliability in DAM market for 06/30/2010 00:00:00 to 07/02/2010 23:00:00 |
28-Jun-2010 12:41:05 | 06/28/2010 12:41:05 ***Advisory*** Generator: ASTORIA___4 has been received for Day Ahead Reliability in DAM market for 07/01/2010 00:00:00 to 07/02/2010 23:00:00 |
28-Jun-2010 13:37:37 | 06/28/2010 13:37:37 ***Advisory*** Generator: ASTORIA___5 has been deleted for Day Ahead Reliability in DAM market for 06/30/2010 00:00:00 to 06/30/2010 00:00:00 |
28-Jun-2010 13:37:42 | 06/28/2010 13:37:42 ***Advisory*** Generator: ASTORIA___5 has been deleted for Day Ahead Reliability in DAM market for 06/30/2010 01:00:00 to 06/30/2010 23:00:00 |