Insert Time | Message |
29-Jun-2010 00:55:19 | ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/29/2010 00:00. |
29-Jun-2010 07:13:32 | Consolidated Edison of NY has Declared Today a Min Oil Burn Day |
29-Jun-2010 07:28:32 | Long Island Power Authority has Declared Today a Min Oil Burn Day |
29-Jun-2010 07:57:16 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 07:00 FOR East End TVR. |
29-Jun-2010 09:40:36 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 09:00 FOR East End TVR. |
29-Jun-2010 09:41:23 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 09:00 FOR East End TVR. |
29-Jun-2010 09:42:03 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 09:00 FOR East End TVR. |
29-Jun-2010 09:44:00 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 09:00 FOR East End TVR. |
29-Jun-2010 10:21:34 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 10:00 FOR East End TVR. |
29-Jun-2010 11:14:01 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 11:00 FOR for 69KV security. |
29-Jun-2010 12:22:40 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 12:00 FOR TVR. |
29-Jun-2010 12:23:33 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 12:00 FOR TVR. |
29-Jun-2010 12:24:16 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 12:00 FOR TVR. |
29-Jun-2010 12:24:17 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 12:00 FOR TVR. |
29-Jun-2010 12:24:17 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 12:00 FOR TVR. |
29-Jun-2010 12:24:42 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 12:00 FOR TVR. |
29-Jun-2010 14:28:56 | Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 14:00 FOR TVR. |
29-Jun-2010 14:29:16 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 14:00 FOR TVR. |
29-Jun-2010 14:51:54 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 15:00 FOR TVR. |
29-Jun-2010 15:35:30 | Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 15:00 FOR 69KV security. |
29-Jun-2010 15:48:17 | Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 15:00 FOR for scheduled line outage. |
29-Jun-2010 15:48:30 | Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS2 OUT OF MERIT. TO VOLTAGE SUPPORT AT START TIME 06/29/2010 15:00 FOR for schedlued line outage. |
29-Jun-2010 15:48:52 | Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 15:00 FOR for scheduled line outage. |
29-Jun-2010 15:49:12 | Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 15:00 FOR for schedlued line outage. |
29-Jun-2010 17:03:54 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 17:00. |
29-Jun-2010 17:03:54 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 17:00. |
29-Jun-2010 17:03:54 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 17:00. |
29-Jun-2010 17:03:54 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 17:00. |
29-Jun-2010 17:03:55 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 17:00. |
29-Jun-2010 17:03:55 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 17:00. |
29-Jun-2010 17:04:55 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 17:00. |
29-Jun-2010 17:04:55 | Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 17:00. |
29-Jun-2010 17:33:52 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/29/2010 17:00 FOR GREENWOOD/STATEN ISLAND LOAD POCKET. |
29-Jun-2010 17:56:42 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/29/2010 17:00 FOR GREENWOOD/STATEN ISLAND LOAD POCKET. |
29-Jun-2010 18:33:33 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/29/2010 18:00 FOR GREENWOOD/STATEN ISLAND LOAD POCKET. |
29-Jun-2010 18:35:29 | Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 18:00. |
29-Jun-2010 18:35:29 | Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 18:00. |
29-Jun-2010 18:35:29 | Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 18:00. |
29-Jun-2010 18:42:20 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 19:00 FOR TVR. |
29-Jun-2010 18:43:21 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 19:00 FOR TVR. |
29-Jun-2010 18:43:39 | Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 19:00 FOR TVR. |
29-Jun-2010 18:59:23 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/29/2010 18:00 FOR CPS / ACE. |
29-Jun-2010 19:10:34 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/29/2010 19:00. |
29-Jun-2010 19:52:29 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 19:00. |
29-Jun-2010 20:15:34 | Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 20:00. |
29-Jun-2010 21:32:01 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 21:00. |
29-Jun-2010 21:32:01 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 21:00. |
29-Jun-2010 21:32:01 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 21:00. |
29-Jun-2010 22:20:38 | Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 22:00. |
29-Jun-2010 22:34:33 | Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/29/2010 22:00. |
29-Jun-2010 22:56:00 | ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/29/2010 22:00. |
Insert Time | Message |
29-Jun-2010 05:07:31 | 06/29/2010 05:07:31 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 06/30/2010 00 to 06/30/2010 23 |
29-Jun-2010 05:07:31 | 06/29/2010 05:07:31 Generator: RAVENSWOOD___2 requested for Day Ahead Reliability in DAM market for 06/30/2010 00 to 06/30/2010 23 |
29-Jun-2010 05:07:31 | 06/29/2010 05:07:31 Generator: MILLIKEN___1 requested for Day Ahead Reliability in DAM market for 06/30/2010 10 to 06/30/2010 23 |
29-Jun-2010 05:07:31 | 06/29/2010 05:07:31 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 06/30/2010 00 to 06/30/2010 23 |
29-Jun-2010 05:07:31 | 06/29/2010 05:07:31 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 06/30/2010 07 to 06/30/2010 21 |
29-Jun-2010 05:07:31 | 06/29/2010 05:07:31 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 06/30/2010 00 to 06/30/2010 23 |
29-Jun-2010 05:07:31 | 06/29/2010 05:07:31 Generator: RAVENSWOOD___4 requested for Day Ahead Reliability in DAM market for 06/30/2010 00 to 06/30/2010 23 |
29-Jun-2010 05:07:31 | 06/29/2010 05:07:31 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 06/30/2010 00 to 06/30/2010 23 |
29-Jun-2010 05:07:31 | 06/29/2010 05:07:31 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 06/30/2010 00 to 06/30/2010 23 |
29-Jun-2010 05:07:31 | 06/29/2010 05:07:31 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 06/30/2010 00 to 06/30/2010 23 |
29-Jun-2010 11:24:37 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/30/2010 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 11:24:37 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/30/2010 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 11:24:51 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/30/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 11:24:51 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/30/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:17 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 01 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:17 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 04 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:17 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 03 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:17 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 02 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:17 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 00 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 14 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 11 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 12 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 13 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 10 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 09 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 08 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 07 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 06 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 05 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 15 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 16 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 17 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 23 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 22 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 21 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 20 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 19 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jun-2010 14:26:18 | Generator: GOUDEY___8 scheduled for local reliability in DAM market for 06/30/2010 18 Energy = 38 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |