Insert Time | Message |
21-Jun-2010 04:13:00 | Metering Authority - Long Island Power Authority REQUESTS NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 04:00 FOR DELAYED STARTUP OF NP1.. |
21-Jun-2010 04:14:15 | Metering Authority - Long Island Power Authority REMOVES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 04:00. |
21-Jun-2010 04:14:58 | Metering Authority - Long Island Power Authority REQUESTS NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 05:00 FOR DELAYED STARTUP OF NP1.. |
21-Jun-2010 06:49:30 | Consolidated Edison of NY has Declared Today a Min Oil Burn Day |
21-Jun-2010 08:22:34 | Metering Authority - Long Island Power Authority UPDATES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 08:00 FOR LIPA system security. |
21-Jun-2010 08:49:25 | Metering Authority - Long Island Power Authority UPDATES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 08:00 FOR LIPA system security. |
21-Jun-2010 09:11:40 | Metering Authority - Long Island Power Authority UPDATES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 09:00 FOR LIPA system security. |
21-Jun-2010 09:46:13 | Metering Authority - Long Island Power Authority UPDATES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 09:00 FOR LIPA system security. |
21-Jun-2010 09:51:31 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 09:00 FOR East End TVR. |
21-Jun-2010 09:55:27 | Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 09:00 FOR System security. |
21-Jun-2010 09:55:57 | Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 09:00 FOR System security. |
21-Jun-2010 09:57:23 | Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 09:00 FOR System security. |
21-Jun-2010 10:10:23 | Long Island Power Authority has Declared Today a Min Oil Burn Day |
21-Jun-2010 11:19:17 | Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 11:00. |
21-Jun-2010 11:19:17 | Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 11:00. |
21-Jun-2010 11:19:17 | Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 11:00. |
21-Jun-2010 12:02:13 | Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 12:00 FOR East End TVR. |
21-Jun-2010 13:26:04 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 13:00 FOR East End TVR. |
21-Jun-2010 14:07:50 | Metering Authority - Long Island Power Authority REMOVES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 14:00. |
21-Jun-2010 14:17:00 | Metering Authority - Long Island Power Authority UPDATES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 14:00 FOR LIPA system security.. |
21-Jun-2010 14:17:09 | Metering Authority - Long Island Power Authority REQUESTS NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 15:00 FOR LIPA system security.. |
21-Jun-2010 14:20:31 | Metering Authority - Long Island Power Authority UPDATES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 14:00 FOR LIPA system security.. |
21-Jun-2010 14:28:12 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 14:00 FOR East End TVR. |
21-Jun-2010 14:51:11 | Metering Authority - Niagara Mohawk REQUESTS SITHE___STERLING OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR Voltage support. |
21-Jun-2010 16:20:37 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR. |
21-Jun-2010 16:20:38 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR. |
21-Jun-2010 16:20:38 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR. |
21-Jun-2010 16:24:35 | Metering Authority - Long Island Power Authority UPDATES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR East End TVR. |
21-Jun-2010 16:34:13 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR. |
21-Jun-2010 16:34:14 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR. |
21-Jun-2010 16:34:14 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR. |
21-Jun-2010 16:36:09 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR. |
21-Jun-2010 16:36:10 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR. |
21-Jun-2010 17:22:14 | Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 17:00. |
21-Jun-2010 17:26:37 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 17:00 FOR TVR. |
21-Jun-2010 18:57:47 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 18:00. |
21-Jun-2010 18:57:47 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 18:00. |
21-Jun-2010 18:57:47 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 18:00. |
21-Jun-2010 18:58:47 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00 FOR TVR. |
21-Jun-2010 18:59:46 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00 FOR TVR. |
21-Jun-2010 19:07:56 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00. |
21-Jun-2010 19:07:57 | Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00. |
21-Jun-2010 19:07:57 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00. |
21-Jun-2010 19:07:57 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00. |
21-Jun-2010 19:07:57 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00. |
21-Jun-2010 19:09:23 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 19:00 FOR CONTINGENCY LOADING GOETHALS TWR ON PAR R14 AND 138 ACTUAL LOADING. |
21-Jun-2010 20:13:35 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 20:00. |
21-Jun-2010 20:13:35 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 20:00. |
21-Jun-2010 21:45:46 | Metering Authority - Long Island Power Authority REQUESTS NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/22/2010 00:00 FOR LIPA system security.. |
21-Jun-2010 21:54:38 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 21:00. |
21-Jun-2010 21:54:39 | Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 21:00. |
21-Jun-2010 21:54:39 | Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 21:00. |
21-Jun-2010 22:01:34 | ISO REQUESTS ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 22:00 FOR 138KV CTGY LOADING. |
21-Jun-2010 22:08:08 | ISO UPDATES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 22:00 FOR 138KV CTGY LOADING. |
21-Jun-2010 22:12:09 | ISO REQUESTS ASTORIA_EAST_ENERGY_CC1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 22:00 FOR ACTUAL LOADING 345 AND 138. |
21-Jun-2010 22:13:30 | ISO UPDATES ASTORIA_EAST_ENERGY_CC2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 22:00 FOR ACTUAL LOADING ON 345 AND 138. |
21-Jun-2010 22:55:31 | ISO REMOVES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 22:00. |
21-Jun-2010 23:16:32 | ISO REMOVES ASTORIA_EAST_ENERGY_CC1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 23:00. |
21-Jun-2010 23:16:32 | ISO REMOVES ASTORIA_EAST_ENERGY_CC2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 23:00. |
21-Jun-2010 23:16:32 | ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 23:00. |
21-Jun-2010 23:50:14 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 23:00 FOR CONTROL VALVE PROBLEM. |
Insert Time | Message |
21-Jun-2010 05:04:43 | 06/21/2010 05:04:43 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23 |
21-Jun-2010 05:04:43 | 06/21/2010 05:04:43 Generator: GOUDEY___8 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23 |
21-Jun-2010 05:04:43 | 06/21/2010 05:04:43 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23 |
21-Jun-2010 05:04:43 | 06/21/2010 05:04:43 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23 |
21-Jun-2010 05:04:43 | 06/21/2010 05:04:43 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23 |
21-Jun-2010 05:04:43 | 06/21/2010 05:04:43 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 06/22/2010 07 to 06/22/2010 21 |
21-Jun-2010 05:04:43 | 06/21/2010 05:04:43 Generator: MILLIKEN___1 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23 |
21-Jun-2010 05:04:43 | 06/21/2010 05:04:43 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23 |
21-Jun-2010 11:00:18 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 06/22/2010 23 Energy = 45 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 11:00:33 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/22/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 11:01:04 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/22/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 11:01:04 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/22/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 11:01:05 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/22/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 11:01:05 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/22/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:12 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 07 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 10 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 11 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 12 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 13 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 14 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 15 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 16 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 17 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 18 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 19 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 20 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 21 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 22 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 23 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 08 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 14:13:13 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 09 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:14:03 | 06/21/2010 15:14:03 ***Advisory*** Generator: ASTORIA___3 has been received for Day Ahead Reliability in DAM market for 06/23/2010 15:00:00 to 06/23/2010 23:00:00 |
21-Jun-2010 15:14:47 | 06/21/2010 15:14:47 ***Advisory*** Generator: ASTORIA___3 has been received for Day Ahead Reliability in DAM market for 06/24/2010 00:00:00 to 06/24/2010 23:00:00 |
21-Jun-2010 15:15:30 | 06/21/2010 15:15:30 ***Advisory*** Generator: ASTORIA___4 has been received for Day Ahead Reliability in DAM market for 06/24/2010 00:00:00 to 06/24/2010 23:00:00 |
21-Jun-2010 15:18:27 | 06/21/2010 15:18:27 ***Advisory*** Generator: RAVENSWOOD___1 has been received for Day Ahead Reliability in DAM market for 06/24/2010 00:00:00 to 06/24/2010 23:00:00 |
21-Jun-2010 15:19:16 | 06/21/2010 15:19:16 ***Advisory*** Generator: RAVENSWOOD___2 has been received for Day Ahead Reliability in DAM market for 06/24/2010 00:00:00 to 06/24/2010 23:00:00 |
21-Jun-2010 15:22:19 | 06/21/2010 15:22:19 ***Advisory*** Generator: RAVENSWOOD___3 has been received for Day Ahead Reliability in DAM market for 06/24/2010 00:00:00 to 06/24/2010 23:00:00 |
21-Jun-2010 15:29:27 | 06/21/2010 15:29:27 ***Advisory*** Generator: ASTORIA___5 has been received for Day Ahead Reliability in DAM market for 06/24/2010 00:00:00 to 06/24/2010 23:00:00 |
21-Jun-2010 15:59:45 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 06 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:45 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 11 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:45 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 10 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:45 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 09 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:45 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 08 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:45 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 07 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:45 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 05 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:45 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 04 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:45 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 03 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:45 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 02 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:45 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 01 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:45 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 00 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 18 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 23 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 22 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 21 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 20 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 19 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 15 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 17 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 16 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 12 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 13 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
21-Jun-2010 15:59:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 14 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |