21-Jun-2010 04:13:00Metering Authority - Long Island Power Authority REQUESTS NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 04:00 FOR DELAYED STARTUP OF NP1..
21-Jun-2010 04:14:15Metering Authority - Long Island Power Authority REMOVES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 04:00.
21-Jun-2010 04:14:58Metering Authority - Long Island Power Authority REQUESTS NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 05:00 FOR DELAYED STARTUP OF NP1..
21-Jun-2010 06:49:30Consolidated Edison of NY has Declared Today a Min Oil Burn Day
21-Jun-2010 08:22:34Metering Authority - Long Island Power Authority UPDATES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 08:00 FOR LIPA system security.
21-Jun-2010 08:49:25Metering Authority - Long Island Power Authority UPDATES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 08:00 FOR LIPA system security.
21-Jun-2010 09:11:40Metering Authority - Long Island Power Authority UPDATES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 09:00 FOR LIPA system security.
21-Jun-2010 09:46:13Metering Authority - Long Island Power Authority UPDATES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 09:00 FOR LIPA system security.
21-Jun-2010 09:51:31Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 09:00 FOR East End TVR.
21-Jun-2010 09:55:27Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 09:00 FOR System security.
21-Jun-2010 09:55:57Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 09:00 FOR System security.
21-Jun-2010 09:57:23Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 09:00 FOR System security.
21-Jun-2010 10:10:23Long Island Power Authority has Declared Today a Min Oil Burn Day
21-Jun-2010 11:19:17Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 11:00.
21-Jun-2010 11:19:17Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 11:00.
21-Jun-2010 11:19:17Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 11:00.
21-Jun-2010 12:02:13Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 12:00 FOR East End TVR.
21-Jun-2010 13:26:04Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 13:00 FOR East End TVR.
21-Jun-2010 14:07:50Metering Authority - Long Island Power Authority REMOVES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 14:00.
21-Jun-2010 14:17:00Metering Authority - Long Island Power Authority UPDATES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 14:00 FOR LIPA system security..
21-Jun-2010 14:17:09Metering Authority - Long Island Power Authority REQUESTS NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 15:00 FOR LIPA system security..
21-Jun-2010 14:20:31Metering Authority - Long Island Power Authority UPDATES NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 14:00 FOR LIPA system security..
21-Jun-2010 14:28:12Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 14:00 FOR East End TVR.
21-Jun-2010 14:51:11Metering Authority - Niagara Mohawk REQUESTS SITHE___STERLING OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR Voltage support.
21-Jun-2010 16:20:37Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR.
21-Jun-2010 16:20:38Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR.
21-Jun-2010 16:20:38Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR.
21-Jun-2010 16:24:35Metering Authority - Long Island Power Authority UPDATES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR East End TVR.
21-Jun-2010 16:34:13Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR.
21-Jun-2010 16:34:14Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR.
21-Jun-2010 16:34:14Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR.
21-Jun-2010 16:36:09Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR.
21-Jun-2010 16:36:10Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 16:00 FOR TVR.
21-Jun-2010 17:22:14Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 17:00.
21-Jun-2010 17:26:37Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 17:00 FOR TVR.
21-Jun-2010 18:57:47Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 18:00.
21-Jun-2010 18:57:47Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 18:00.
21-Jun-2010 18:57:47Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 18:00.
21-Jun-2010 18:58:47Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00 FOR TVR.
21-Jun-2010 18:59:46Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00 FOR TVR.
21-Jun-2010 19:07:56Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00.
21-Jun-2010 19:07:57Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00.
21-Jun-2010 19:07:57Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00.
21-Jun-2010 19:07:57Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00.
21-Jun-2010 19:07:57Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 19:00.
21-Jun-2010 19:09:23ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 19:00 FOR CONTINGENCY LOADING GOETHALS TWR ON PAR R14 AND 138 ACTUAL LOADING.
21-Jun-2010 20:13:35Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 20:00.
21-Jun-2010 20:13:35Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 20:00.
21-Jun-2010 21:45:46Metering Authority - Long Island Power Authority REQUESTS NORTHPORT___2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/22/2010 00:00 FOR LIPA system security..
21-Jun-2010 21:54:38Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 21:00.
21-Jun-2010 21:54:39Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 21:00.
21-Jun-2010 21:54:39Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/21/2010 21:00.
21-Jun-2010 22:01:34ISO REQUESTS ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 22:00 FOR 138KV CTGY LOADING.
21-Jun-2010 22:08:08ISO UPDATES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 22:00 FOR 138KV CTGY LOADING.
21-Jun-2010 22:12:09ISO REQUESTS ASTORIA_EAST_ENERGY_CC1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 22:00 FOR ACTUAL LOADING 345 AND 138.
21-Jun-2010 22:13:30ISO UPDATES ASTORIA_EAST_ENERGY_CC2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 22:00 FOR ACTUAL LOADING ON 345 AND 138.
21-Jun-2010 22:55:31ISO REMOVES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 22:00.
21-Jun-2010 23:16:32ISO REMOVES ASTORIA_EAST_ENERGY_CC1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 23:00.
21-Jun-2010 23:16:32ISO REMOVES ASTORIA_EAST_ENERGY_CC2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 23:00.
21-Jun-2010 23:16:32ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 23:00.
21-Jun-2010 23:50:14ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/21/2010 23:00 FOR CONTROL VALVE PROBLEM.

Committed for Reliability

Back to top
Insert TimeMessage
21-Jun-2010 05:04:4306/21/2010 05:04:43 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23
21-Jun-2010 05:04:4306/21/2010 05:04:43 Generator: GOUDEY___8 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23
21-Jun-2010 05:04:4306/21/2010 05:04:43 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23
21-Jun-2010 05:04:4306/21/2010 05:04:43 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23
21-Jun-2010 05:04:4306/21/2010 05:04:43 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23
21-Jun-2010 05:04:4306/21/2010 05:04:43 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 06/22/2010 07 to 06/22/2010 21
21-Jun-2010 05:04:4306/21/2010 05:04:43 Generator: MILLIKEN___1 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23
21-Jun-2010 05:04:4306/21/2010 05:04:43 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 06/22/2010 00 to 06/22/2010 23
21-Jun-2010 11:00:18Generator: BARRETT___1 scheduled for local reliability in DAM market for 06/22/2010 23 Energy = 45 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 11:00:33Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/22/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 11:01:04Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/22/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 11:01:04Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/22/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 11:01:05Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/22/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 11:01:05Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/22/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:12Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 07 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 10 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 11 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 12 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 13 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 14 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 15 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 16 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 17 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 18 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 19 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 20 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 21 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 22 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 23 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 08 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 14:13:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/22/2010 09 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:14:0306/21/2010 15:14:03 ***Advisory*** Generator: ASTORIA___3 has been received for Day Ahead Reliability in DAM market for 06/23/2010 15:00:00 to 06/23/2010 23:00:00
21-Jun-2010 15:14:4706/21/2010 15:14:47 ***Advisory*** Generator: ASTORIA___3 has been received for Day Ahead Reliability in DAM market for 06/24/2010 00:00:00 to 06/24/2010 23:00:00
21-Jun-2010 15:15:3006/21/2010 15:15:30 ***Advisory*** Generator: ASTORIA___4 has been received for Day Ahead Reliability in DAM market for 06/24/2010 00:00:00 to 06/24/2010 23:00:00
21-Jun-2010 15:18:2706/21/2010 15:18:27 ***Advisory*** Generator: RAVENSWOOD___1 has been received for Day Ahead Reliability in DAM market for 06/24/2010 00:00:00 to 06/24/2010 23:00:00
21-Jun-2010 15:19:1606/21/2010 15:19:16 ***Advisory*** Generator: RAVENSWOOD___2 has been received for Day Ahead Reliability in DAM market for 06/24/2010 00:00:00 to 06/24/2010 23:00:00
21-Jun-2010 15:22:1906/21/2010 15:22:19 ***Advisory*** Generator: RAVENSWOOD___3 has been received for Day Ahead Reliability in DAM market for 06/24/2010 00:00:00 to 06/24/2010 23:00:00
21-Jun-2010 15:29:2706/21/2010 15:29:27 ***Advisory*** Generator: ASTORIA___5 has been received for Day Ahead Reliability in DAM market for 06/24/2010 00:00:00 to 06/24/2010 23:00:00
21-Jun-2010 15:59:45Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 06 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:45Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 11 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:45Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 10 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:45Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 09 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:45Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 08 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:45Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 07 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:45Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 05 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:45Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 04 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:45Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 03 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:45Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 02 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:45Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 01 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:45Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 00 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 18 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 23 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 22 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 21 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 20 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 19 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 15 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 17 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 16 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 12 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 13 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
21-Jun-2010 15:59:46Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/22/2010 14 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage

Market Pricing Notices

Back to top
Insert TimeMessage
21-Jun-2010 15:15:28Prices in the June 20, 2010 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the June 20, 2010 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the June 22, 2010 Day-Ahead Market encompassing Energy, Regulation, and Operating Reserves are correct.
21-Jun-2010 15:35:11Prices in the June 21, 2010 Real-Time Market for the period hours beginning 0 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the June 21, 2010 Hour-Ahead Market for the period hours beginning 0 through 11 are correct.