P-2524-Jun-2010

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices
Market Pricing Notices

Dispatcher Notices

Back to top
Insert TimeMessage
24-Jun-2010 01:11:00NPX initiated curtailment cut 50 MWs. 06/24/2010 01:11 EDT
24-Jun-2010 04:07:42NPX initiated curtailment cut 50 MWs. 06/24/2010 04:07 EDT
24-Jun-2010 06:03:24CONSOLIDATED EDISON OF NY HAS DECLARED TODAY A MIN OIL BURN DAY
24-Jun-2010 06:15:30LONG ISLAND POWER AUTHORITY HAS DECLARED TODAY A MIN OIL BURN DAY
24-Jun-2010 08:19:14Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 08:00 FOR EAST END LOADS..
24-Jun-2010 09:03:05Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 09:00 FOR P/C FLOWS..
24-Jun-2010 09:47:12Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 09:00 FOR EAST END LOADS..
24-Jun-2010 10:04:17Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 10:00 FOR P/C FLOWS..
24-Jun-2010 10:06:54Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 10:00 FOR TVR.
24-Jun-2010 11:04:58Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 11:00 FOR TVR..
24-Jun-2010 11:32:54Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 11:00 FOR P/C FLOWS..
24-Jun-2010 11:35:07Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 11:00 FOR TVR.
24-Jun-2010 11:35:43Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 11:00 FOR TVR..
24-Jun-2010 11:37:24Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 11:00 FOR TVR.
24-Jun-2010 11:37:59Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 11:00 FOR TVR..
24-Jun-2010 12:00:00Thunder Storm Alert Declared at 13:00:00
24-Jun-2010 12:12:54Thunder Storm Alert Declared at 12:00:00
24-Jun-2010 12:33:46ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/24/2010 12:00 FOR CPS / ACE..
24-Jun-2010 12:36:1906/24/2010 12:34:48 NYISO large event reserve pick-up executed.
24-Jun-2010 12:41:21ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/24/2010 12:00.
24-Jun-2010 13:24:17ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/24/2010 13:00 FOR ACE / CPS..
24-Jun-2010 13:27:28ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/24/2010 13:00.
24-Jun-2010 14:00:44ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/24/2010 14:00 FOR ACE / CPS.
24-Jun-2010 14:07:18Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 14:00 FOR TVR.
24-Jun-2010 14:19:57ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/24/2010 14:00.
24-Jun-2010 14:21:31NPX initiated curtailment cut 300 MWs. 06/24/2010 14:21 EDT
24-Jun-2010 14:23:27Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 14:00 FOR EAST END LOADS..
24-Jun-2010 14:24:18Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 14:00 FOR EAST END LOADS.
24-Jun-2010 14:40:45Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 14:00 FOR TVR.
24-Jun-2010 14:41:44Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 14:00 FOR TVR.
24-Jun-2010 14:42:35Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 14:00 FOR TVR.
24-Jun-2010 14:43:39Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 14:00 FOR TVR.
24-Jun-2010 14:44:34Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 14:00 FOR TVR.
24-Jun-2010 14:53:08ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/24/2010 14:00 FOR ACE / CPS..
24-Jun-2010 14:54:45ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/24/2010 15:00 FOR ACE / CPS..
24-Jun-2010 15:13:32ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/24/2010 15:00.
24-Jun-2010 15:37:00Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 15:00.
24-Jun-2010 15:37:00Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 15:00.
24-Jun-2010 15:37:00Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 15:00.
24-Jun-2010 15:40:35Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 15:00 FOR TVR.
24-Jun-2010 15:58:27Metering Authority - Long Island Power Authority REMOVES SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 15:00.
24-Jun-2010 16:51:07Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 16:00 FOR P/C FLOWS..
24-Jun-2010 16:51:44Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 16:00 FOR P/C FLOWS..
24-Jun-2010 17:01:51Metering Authority - Long Island Power Authority UPDATES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 17:00 FOR EAST END LOADS.
24-Jun-2010 17:04:53Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 17:00.
24-Jun-2010 17:36:56Thunder Storn Alert terminated @ 17:30:00.
24-Jun-2010 18:14:19Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 18:00 FOR TVR.
24-Jun-2010 18:21:07ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/24/2010 18:00 FOR ACE / CPS..
24-Jun-2010 18:21:43ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/24/2010 18:00.
24-Jun-2010 19:04:51Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 19:00 FOR TVR.
24-Jun-2010 19:44:21Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 19:00.
24-Jun-2010 19:44:21Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 19:00.
24-Jun-2010 19:47:28Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 19:00.
24-Jun-2010 19:47:28Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 19:00.
24-Jun-2010 19:47:28Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 19:00.
24-Jun-2010 19:47:29Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 19:00.
24-Jun-2010 19:51:31Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 19:00.
24-Jun-2010 19:51:31Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 19:00.
24-Jun-2010 21:25:40Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA___5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 21:00 FOR Actual loading.
24-Jun-2010 21:33:10Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA___5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/25/2010 00:00 FOR Actual loading.
24-Jun-2010 22:07:53Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 22:00.
24-Jun-2010 22:07:54Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 22:00.
24-Jun-2010 22:07:55Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 22:00.
24-Jun-2010 22:19:42Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 22:00.
24-Jun-2010 22:48:30Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 22:00.
24-Jun-2010 22:55:47Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/24/2010 22:00 FOR P/C FLOWS..
24-Jun-2010 23:42:51Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 06/25/2010 00:00 FOR P/C FLOWS..

Committed for Reliability

Back to top
Insert TimeMessage
24-Jun-2010 05:08:3906/24/2010 05:08:39 Generator: MILLIKEN___1 requested for Day Ahead Reliability in DAM market for 06/25/2010 00 to 06/25/2010 23
24-Jun-2010 05:08:3906/24/2010 05:08:39 Generator: ARTHUR_KILL_3 requested for Day Ahead Reliability in DAM market for 06/25/2010 00 to 06/25/2010 23
24-Jun-2010 05:08:3906/24/2010 05:08:39 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 06/25/2010 00 to 06/25/2010 23
24-Jun-2010 05:08:3906/24/2010 05:08:39 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 06/25/2010 07 to 06/25/2010 21
24-Jun-2010 05:08:3906/24/2010 05:08:39 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 06/25/2010 00 to 06/25/2010 23
24-Jun-2010 05:08:3906/24/2010 05:08:39 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 06/25/2010 00 to 06/25/2010 23
24-Jun-2010 05:08:4006/24/2010 05:08:40 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 06/25/2010 00 to 06/25/2010 23
24-Jun-2010 05:08:4006/24/2010 05:08:40 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 06/25/2010 00 to 06/25/2010 23
24-Jun-2010 05:08:4006/24/2010 05:08:40 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 06/25/2010 04 to 06/25/2010 23
24-Jun-2010 05:08:4006/24/2010 05:08:40 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 06/25/2010 00 to 06/25/2010 23
24-Jun-2010 05:08:4006/24/2010 05:08:40 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 06/25/2010 00 to 06/25/2010 23
24-Jun-2010 05:08:4006/24/2010 05:08:40 Generator: RAVENSWOOD___4 requested for Day Ahead Reliability in DAM market for 06/25/2010 00 to 06/25/2010 23
24-Jun-2010 08:49:05Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2010 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 08:49:05Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2010 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 08:49:05Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2010 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 08:49:05Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2010 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 08:49:05Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2010 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 08:49:05Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2010 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 08:49:05Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2010 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 08:49:05Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2010 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 08:49:05Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2010 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 08:49:05Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2010 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 08:49:05Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2010 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 08:49:05Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2010 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 08:49:05Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2010 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:41Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:41Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:41Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:41Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:41Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:41Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:42Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:42Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:42Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:42Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:42Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:42Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:42Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:43Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:43Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:43Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:43Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:43Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:43Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:44Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:44Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:44Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:44Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 10:57:44Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/25/2010 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 11:39:36Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/25/2010 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 11:39:58Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 06/25/2010 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 11:39:58Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 06/25/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 11:40:12Generator: BARRETT___2 scheduled for local reliability in DAM market for 06/25/2010 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 11:40:31Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/25/2010 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 11:40:31Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/25/2010 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 11:40:31Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/25/2010 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 11:40:31Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/25/2010 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 11:40:31Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/25/2010 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
24-Jun-2010 20:14:1706/24/2010 20:14:17 ***Advisory*** Generator: RAVENSWOOD___4 has been received for Day Ahead Reliability in DAM market for 06/26/2010 00:00:00 to 06/29/2010 23:00:00

Market Monitor Notices

Back to top
Insert TimeMessage

Market Pricing Notices

Back to top
Insert TimeMessage
24-Jun-2010 15:12:04Prices in the June 23, 2010 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the June 23, 2010 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the June 25, 2010 Day-Ahead Market encompassing Energy, Regulation, and Operating Reserves are correct.
24-Jun-2010 17:05:13Prices in the June 24, 2010 Real-Time Market for the period hours beginning 0 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the June 24, 2010 Hour-Ahead Market for the period hours beginning 0 through 11 are correct.