P-2510-Mar-2010

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices
Market Pricing Notices

Dispatcher Notices

Back to top
Insert TimeMessage
10-Mar-2010 05:00:17ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 03/10/2010 05:00 FOR ACE / CPS.
10-Mar-2010 10:22:3703/10/2010 10:21:53 NYISO large event reserve pick-up executed.
10-Mar-2010 18:13:37ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 03/10/2010 18:00 FOR 345KV CONTINGENCIES.
10-Mar-2010 18:19:39H Q initiated curtailment cut 200 MWs. 03/10/2010 18:19 EST
10-Mar-2010 18:28:27H Q initiated curtailment cut 200 MWs. 03/10/2010 18:28 EST
10-Mar-2010 20:07:18ISO REMOVES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 03/10/2010 20:00.
10-Mar-2010 20:27:54ISO REMOVES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 03/10/2010 21:00.
10-Mar-2010 21:06:26ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 03/10/2010 21:00 FOR .
10-Mar-2010 21:12:31ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 03/10/2010 21:00.

Committed for Reliability

Back to top
Insert TimeMessage
10-Mar-2010 05:04:5303/10/2010 05:04:53 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 03/11/2010 00 to 03/11/2010 23
10-Mar-2010 05:04:5303/10/2010 05:04:53 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 03/11/2010 00 to 03/11/2010 23
10-Mar-2010 05:04:5303/10/2010 05:04:53 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 03/11/2010 07 to 03/11/2010 22
10-Mar-2010 10:49:30Generator: BARRETT___2 scheduled for local reliability in DAM market for 03/11/2010 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 10:59:57Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 03/10/2010 20 Energy = 76 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 10:59:57Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 03/10/2010 18 Energy = 76 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 10:59:57Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 03/10/2010 21 Energy = 76 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 10:59:57Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 03/10/2010 17 Energy = 76 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:55Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 00 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:55Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 01 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:55Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 02 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:55Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 05 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:55Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 04 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:55Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 03 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:55Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 06 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:55Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 07 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:55Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 08 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:55Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 09 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:55Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 10 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:56Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 17 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:56Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 16 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:56Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 15 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:56Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 14 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:56Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 13 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:56Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 12 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:56Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 21 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:56Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 22 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:56Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 11 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:56Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 18 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:56Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 19 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:56Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 20 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 12:04:57Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 03/11/2010 23 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:30Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:30Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:30Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:30Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:30Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:30Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:30Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:30Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:30Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:30Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:30Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:31Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:31Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:31Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:31Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:31Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:31Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:31Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:31Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:31Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:31Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:31Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:31Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 13:19:31Generator: MILLIKEN___2 scheduled for local reliability in DAM market for 03/11/2010 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Mar-2010 15:35:06Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 03/11/2010 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage

Market Pricing Notices

Back to top
Insert TimeMessage
10-Mar-2010 14:30:15Prices in the March 09, 2010 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the March 09, 2010 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the March 11, 2010 Day-Ahead Market encompassing Energy, Regulation, and Operating Reserves are correct.
10-Mar-2010 14:48:34Prices in the March 10, 2010 Real-Time Market for the period hours beginning 0 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the March 10, 2010 Hour-Ahead Market for the period hours beginning 0 through 11 are correct.