Insert Time | Message |
15-Nov-2009 04:37:09 | ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/15/2009 04:00 FOR VOLTAGE CONTROL. |
15-Nov-2009 05:30:18 | ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/15/2009 05:00. |
15-Nov-2009 05:35:54 | ISO UPDATES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/15/2009 05:00 FOR NO NEEDED. |
15-Nov-2009 05:49:21 | ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/15/2009 06:00 FOR VOLTAGE CONTROL. |
15-Nov-2009 06:04:34 | ISO REMOVES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/15/2009 06:00. |
15-Nov-2009 10:41:21 | ISO REQUESTS HUNTLEY___67 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/15/2009 10:00 FOR P/C FLOWS.. |
15-Nov-2009 14:10:42 | ISO REMOVES HUNTLEY___67 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/15/2009 14:00. |
15-Nov-2009 15:43:40 | Metering Authority - Consolidated Edison of NY REQUESTS ARTHUR_KILL_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/15/2009 15:00 FOR SWITCHING.. |
15-Nov-2009 16:05:33 | Metering Authority - Consolidated Edison of NY REMOVES ARTHUR_KILL_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/15/2009 16:00. |
15-Nov-2009 20:09:24 | NYISO Locational based curtailment cut 100 MWs. 11/15/2009 20:09 EST |
15-Nov-2009 20:11:33 | Metering Authority - Consolidated Edison of NY REQUESTS ARTHUR_KILL_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/15/2009 20:00 FOR LOSS OF PROTECTION. |
15-Nov-2009 20:45:14 | Metering Authority - Consolidated Edison of NY REQUESTS ARTHUR_KILL_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/16/2009 00:00 FOR LOSS OF PROTECTION. |
15-Nov-2009 21:54:48 | ISO REQUESTS ELLENBURG_WT_PWR OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/15/2009 21:00 FOR P/C FLOWS. |
15-Nov-2009 21:55:32 | ISO REMOVES ELLENBURG_WT_PWR OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/15/2009 21:00. |
15-Nov-2009 21:55:56 | ISO REQUESTS ELLENBURG_WT_PWR OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/15/2009 22:00 FOR P/C FLOWS. Record deleted in current hour.. |
15-Nov-2009 21:56:54 | ISO UPDATES ELLENBURG_WT_PWR OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/15/2009 21:00 FOR P/C FLOWS.. |
15-Nov-2009 22:17:50 | ISO UPDATES ELLENBURG_WT_PWR OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/15/2009 22:00 FOR P/C FLOWS.. |
15-Nov-2009 23:18:07 | ISO REMOVES ELLENBURG_WT_PWR OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/15/2009 23:00. |
Insert Time | Message |
15-Nov-2009 05:06:16 | 11/15/2009 05:06:16 Generator: NORTHPORT___4 requested for Day Ahead Reliability in DAM market for 11/16/2009 00 to 11/16/2009 23 |
15-Nov-2009 05:06:16 | 11/15/2009 05:06:16 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 11/16/2009 07 to 11/16/2009 21 |
15-Nov-2009 05:06:16 | 11/15/2009 05:06:16 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 11/16/2009 06 to 11/16/2009 23 |
15-Nov-2009 05:06:16 | 11/15/2009 05:06:16 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 11/16/2009 00 to 11/16/2009 23 |
15-Nov-2009 05:06:16 | 11/15/2009 05:06:16 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 11/16/2009 00 to 11/16/2009 23 |
15-Nov-2009 05:06:16 | 11/15/2009 05:06:16 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 11/16/2009 00 to 11/16/2009 23 |
15-Nov-2009 05:06:16 | 11/15/2009 05:06:16 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 11/16/2009 00 to 11/16/2009 23 |
15-Nov-2009 12:03:00 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 08 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:00 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 09 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:00 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 07 Energy = 55 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 19 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 10 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 11 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 12 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 13 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 14 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 15 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 23 Energy = 55 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 22 Energy = 55 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 21 Energy = 55 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 20 Energy = 55 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 18 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 17 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:03:01 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/16/2009 16 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:50 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 14 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:50 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 12 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:50 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 13 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:50 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 08 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:50 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 09 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:50 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 10 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:50 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 11 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:51 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 22 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:51 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 23 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:51 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 21 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:51 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 20 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:51 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 19 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:51 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 18 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:51 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 17 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:51 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 16 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 12:09:51 | Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 11/16/2009 15 Energy = 130 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 13:32:26 | Generator: POLETTI____ scheduled for local reliability in DAM market for 11/15/2009 16 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 13:32:26 | Generator: POLETTI____ scheduled for local reliability in DAM market for 11/15/2009 17 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:10 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 07 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:10 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 06 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:10 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 08 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:10 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 09 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:10 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 10 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:10 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 05 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:10 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 12 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:10 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 11 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:11 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 13 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:11 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 14 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:11 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 15 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:11 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 22 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:11 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 17 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:11 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 16 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:11 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 23 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:11 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 21 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:11 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 20 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:11 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 19 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 14:40:11 | Generator: NEG NORTH_FLCN_SEA scheduled for local reliability in DAM market for 11/16/2009 18 Energy = 74 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 15:59:50 | Generator: POLETTI____ scheduled for local reliability in DAM market for 11/15/2009 20 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 15:59:50 | Generator: POLETTI____ scheduled for local reliability in DAM market for 11/15/2009 19 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Nov-2009 15:59:50 | Generator: POLETTI____ scheduled for local reliability in DAM market for 11/15/2009 18 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |