Insert Time | Message |
09-Nov-2009 16:01:40 | ISO REQUESTS PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING. |
09-Nov-2009 16:11:47 | ISO UPDATES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING. |
09-Nov-2009 16:26:22 | ISO UPDATES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING. |
09-Nov-2009 16:33:40 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING. |
09-Nov-2009 16:44:20 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING. |
09-Nov-2009 16:52:57 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING. |
09-Nov-2009 16:56:15 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA___5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING. |
09-Nov-2009 16:58:02 | ISO UPDATES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING. |
09-Nov-2009 17:01:37 | ISO REQUESTS ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 17:00 FOR P/C LOADING. |
09-Nov-2009 17:12:45 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 17:00 FOR P/C LOADING. |
09-Nov-2009 17:20:54 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 17:00 FOR P/C LOADING. |
09-Nov-2009 18:00:31 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00. |
09-Nov-2009 18:00:31 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00. |
09-Nov-2009 18:00:31 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00. |
09-Nov-2009 18:00:31 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00. |
09-Nov-2009 18:02:59 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00 FOR P/C LOADING. |
09-Nov-2009 18:02:59 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00 FOR P/C LOADING. |
09-Nov-2009 18:02:59 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00 FOR P/C LOADING. |
09-Nov-2009 18:02:59 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00 FOR P/C LOADING. |
09-Nov-2009 18:31:13 | ISO REMOVES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 18:00. |
09-Nov-2009 18:36:21 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 18:00. |
09-Nov-2009 18:36:21 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 18:00. |
09-Nov-2009 20:47:52 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 20:00. |
09-Nov-2009 20:47:53 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 20:00. |
09-Nov-2009 21:10:42 | ISO REMOVES ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 21:00. |
09-Nov-2009 21:10:43 | ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 21:00. |
09-Nov-2009 23:20:54 | ISO REMOVES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 23:00. |
Insert Time | Message |
09-Nov-2009 05:06:11 | 11/09/2009 05:06:11 Generator: NORTHPORT___4 requested for Day Ahead Reliability in DAM market for 11/10/2009 00 to 11/10/2009 23 |
09-Nov-2009 05:06:11 | 11/09/2009 05:06:11 Generator: POLETTI____ requested for Day Ahead Reliability in DAM market for 11/10/2009 00 to 11/10/2009 23 |
09-Nov-2009 05:06:11 | 11/09/2009 05:06:11 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 11/10/2009 00 to 11/10/2009 23 |
09-Nov-2009 05:06:11 | 11/09/2009 05:06:11 Generator: CAITHNESS_CC_1 requested for Day Ahead Reliability in DAM market for 11/10/2009 05 to 11/10/2009 23 |
09-Nov-2009 05:06:11 | 11/09/2009 05:06:11 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 11/10/2009 00 to 11/10/2009 23 |
09-Nov-2009 05:06:11 | 11/09/2009 05:06:11 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 11/10/2009 07 to 11/10/2009 21 |
09-Nov-2009 10:59:18 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 10:59:18 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 10:59:18 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 10:59:18 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 10:59:18 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 10:59:18 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 10:59:18 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 10:59:18 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 11:00:15 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 11/10/2009 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 11:00:15 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 11/10/2009 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 11:01:51 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/09/2009 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 11:01:52 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/09/2009 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 11:01:52 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/09/2009 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 11:01:52 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/09/2009 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:16 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 08 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:16 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 07 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:16 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 06 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:16 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 09 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:17 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 14 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:17 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 15 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:17 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 16 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:17 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 17 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:17 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 18 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:17 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 19 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:17 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 20 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:17 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 21 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:17 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 12 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:17 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 11 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:17 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 10 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 13:54:17 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 13 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:09 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:10 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:11 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:11 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:11 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:11 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:11 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:11 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 14:10:11 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:16 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:17 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:17 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:17 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:17 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:17 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Nov-2009 16:18:17 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |