P-2509-Nov-2009

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices
Market Pricing Notices

Dispatcher Notices

Back to top
Insert TimeMessage
09-Nov-2009 16:01:40ISO REQUESTS PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING.
09-Nov-2009 16:11:47ISO UPDATES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING.
09-Nov-2009 16:26:22ISO UPDATES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING.
09-Nov-2009 16:33:40Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING.
09-Nov-2009 16:44:20Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING.
09-Nov-2009 16:52:57Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING.
09-Nov-2009 16:56:15Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA___5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING.
09-Nov-2009 16:58:02ISO UPDATES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 16:00 FOR P/C LOADING.
09-Nov-2009 17:01:37ISO REQUESTS ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 17:00 FOR P/C LOADING.
09-Nov-2009 17:12:45ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 17:00 FOR P/C LOADING.
09-Nov-2009 17:20:54Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 17:00 FOR P/C LOADING.
09-Nov-2009 18:00:31Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00.
09-Nov-2009 18:00:31Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00.
09-Nov-2009 18:00:31Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00.
09-Nov-2009 18:00:31Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00.
09-Nov-2009 18:02:59Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00 FOR P/C LOADING.
09-Nov-2009 18:02:59Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00 FOR P/C LOADING.
09-Nov-2009 18:02:59Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00 FOR P/C LOADING.
09-Nov-2009 18:02:59Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 19:00 FOR P/C LOADING.
09-Nov-2009 18:31:13ISO REMOVES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 18:00.
09-Nov-2009 18:36:21Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 18:00.
09-Nov-2009 18:36:21Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 18:00.
09-Nov-2009 20:47:52Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 20:00.
09-Nov-2009 20:47:53Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 11/09/2009 20:00.
09-Nov-2009 21:10:42ISO REMOVES ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 21:00.
09-Nov-2009 21:10:43ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 21:00.
09-Nov-2009 23:20:54ISO REMOVES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/09/2009 23:00.

Committed for Reliability

Back to top
Insert TimeMessage
09-Nov-2009 05:06:1111/09/2009 05:06:11 Generator: NORTHPORT___4 requested for Day Ahead Reliability in DAM market for 11/10/2009 00 to 11/10/2009 23
09-Nov-2009 05:06:1111/09/2009 05:06:11 Generator: POLETTI____ requested for Day Ahead Reliability in DAM market for 11/10/2009 00 to 11/10/2009 23
09-Nov-2009 05:06:1111/09/2009 05:06:11 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 11/10/2009 00 to 11/10/2009 23
09-Nov-2009 05:06:1111/09/2009 05:06:11 Generator: CAITHNESS_CC_1 requested for Day Ahead Reliability in DAM market for 11/10/2009 05 to 11/10/2009 23
09-Nov-2009 05:06:1111/09/2009 05:06:11 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 11/10/2009 00 to 11/10/2009 23
09-Nov-2009 05:06:1111/09/2009 05:06:11 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 11/10/2009 07 to 11/10/2009 21
09-Nov-2009 10:59:18Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 10:59:18Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 10:59:18Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 10:59:18Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 10:59:18Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 10:59:18Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 10:59:18Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 10:59:18Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/10/2009 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 11:00:15Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 11/10/2009 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 11:00:15Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 11/10/2009 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 11:01:51Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/09/2009 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 11:01:52Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/09/2009 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 11:01:52Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/09/2009 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 11:01:52Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/09/2009 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:16Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 08 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:16Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 07 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:16Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 06 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:16Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 09 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:17Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 14 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:17Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 15 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:17Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 16 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:17Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 17 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:17Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 18 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:17Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 19 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:17Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 20 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:17Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 21 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:17Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 12 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:17Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 11 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:17Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 10 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 13:54:17Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 11/10/2009 13 Energy = 73 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:09Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:11Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:11Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:11Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:11Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:11Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:11Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 14:10:11Generator: ASTORIA___4 scheduled for local reliability in DAM market for 11/10/2009 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:16Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:17Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:17Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:17Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:17Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:17Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Nov-2009 16:18:17Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 11/10/2009 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage

Market Pricing Notices

Back to top
Insert TimeMessage
09-Nov-2009 14:51:00Prices in the November 08, 2009 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the November 08, 2009 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the November 10, 2009 Day-Ahead Market encompassing Energy, Regulation, and Operating Reserves are correct.
09-Nov-2009 15:32:10Prices in the November 09, 2009 Real-Time Market for the period hours beginning 0 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the November 09, 2009 Hour-Ahead Market for the period hours beginning 0 through 11 are correct.