Insert Time | Message |
27-Jul-2009 01:42:56 | Thunderstorm Alert Terminated AT 01:42 07/27/09 |
27-Jul-2009 07:31:01 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 08:00 FOR EAST END LOAD. |
27-Jul-2009 08:21:52 | ISO REQUESTS HUNTLEY___67 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 08:00 FOR POST CONTINGENCY LOADING. |
27-Jul-2009 08:36:06 | ISO REQUESTS MILLIKEN___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 08:00 FOR POST CONTINGENCY LOADING. |
27-Jul-2009 08:40:46 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 08:00 FOR POST CONTINGENCY LOADING. |
27-Jul-2009 08:47:49 | ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 08:00 FOR POST CONTINGENCY LOADING. |
27-Jul-2009 08:48:18 | ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 08:00 FOR POST CONTINGENCY LOADING. |
27-Jul-2009 08:48:26 | ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 08:00 FOR POST CONTINGENCY LOADING. |
27-Jul-2009 08:52:53 | ISO UPDATES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 08:00 FOR 138KV POST CONTINGENCY LOADING. |
27-Jul-2009 08:54:24 | ISO REQUESTS PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 09:00 FOR 138KV POST CONTINGENCY LOADING. |
27-Jul-2009 08:55:01 | ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 08:00 FOR POST CONTINGENCY LOADING. |
27-Jul-2009 09:02:08 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 09:00. |
27-Jul-2009 09:13:55 | ISO UPDATES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 09:00 FOR 138KV POST CONTINGENCY LOADING. |
27-Jul-2009 09:24:50 | ISO UPDATES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 09:00 FOR 138KV POST CONTINGENCY LOADING. |
27-Jul-2009 09:35:49 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 09:00 FOR EAST END LOAD. |
27-Jul-2009 09:37:51 | ISO UPDATES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 09:00 FOR 138KV POST CONTINGENCY LOADING. |
27-Jul-2009 09:39:03 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 09:00 FOR TVR. |
27-Jul-2009 09:39:36 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 09:00. |
27-Jul-2009 09:39:58 | Metering Authority - Long Island Power Authority UPDATES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 10:00 FOR TVR.. |
27-Jul-2009 09:40:15 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 11:00 FOR TVR.. |
27-Jul-2009 09:40:51 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 10:00 FOR TVR. |
27-Jul-2009 09:41:18 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 10:00 FOR TVR. |
27-Jul-2009 09:42:31 | ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 09:00 FOR POST CONTINGENCY LOADING. Record deleted in current hour.. |
27-Jul-2009 09:42:48 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 10:00 FOR POST CONTINGENCY LOADING. Record deleted in current hour.. |
27-Jul-2009 10:05:30 | ISO REMOVES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 10:00. |
27-Jul-2009 10:11:33 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 10:00. |
27-Jul-2009 10:54:58 | ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 10:00 FOR POST CONTINGENCY LOADING.. |
27-Jul-2009 10:55:10 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 11:00 FOR POST CONTINGENCY LOADING.. |
27-Jul-2009 11:04:21 | ISO UPDATES HUNTLEY___67 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 11:00 FOR POST CONTINGENCY LOADING. |
27-Jul-2009 11:06:53 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 11:00 FOR East End load. |
27-Jul-2009 11:09:20 | ISO REMOVES HUNTLEY___67 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 11:00. |
27-Jul-2009 11:09:33 | ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 11:00 FOR POST CONTINGENCY LOADING.. |
27-Jul-2009 11:12:15 | NPX initiated curtailment cut 100 MWs. 07/27/2009 11:12 EDT |
27-Jul-2009 11:26:29 | 07/27/2009 11:25:16 NYISO large event reserve pick-up executed. |
27-Jul-2009 11:28:46 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 11:00. |
27-Jul-2009 11:36:07 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 12:00 FOR TVR. |
27-Jul-2009 11:36:09 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 12:00 FOR TVR. |
27-Jul-2009 11:36:11 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 12:00 FOR TVR. |
27-Jul-2009 11:37:48 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 12:00 FOR TVR. |
27-Jul-2009 11:56:16 | ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 11:00 FOR POST CONTINGENCY LOADING... |
27-Jul-2009 12:00:18 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 12:00 FOR POST CONTINGENCY LOADING... |
27-Jul-2009 12:00:39 | ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 12:00 FOR POST CONTINGENCY LOADING... |
27-Jul-2009 12:35:09 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 12:00. |
27-Jul-2009 12:45:01 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 12:00 FOR EAST END LOAD. |
27-Jul-2009 12:58:43 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 12:00 FOR TVR. |
27-Jul-2009 12:59:47 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 12:00 FOR TVR. |
27-Jul-2009 13:13:49 | ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 13:00 FOR VOLTAGE. |
27-Jul-2009 13:24:53 | NPX initiated curtailment cut 146 MWs. 07/27/2009 13:24 EDT |
27-Jul-2009 13:36:07 | NYISO Locational based curtailment cut 200 MWs. 07/27/2009 13:36 EDT |
27-Jul-2009 13:49:41 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 13:00 FOR TVR. |
27-Jul-2009 13:50:31 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 13:00 FOR TVR. |
27-Jul-2009 14:00:04 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 14:00 FOR WESTERN CONTINGENCIES. |
27-Jul-2009 14:03:05 | THUNDERSTORM ALERT DECLARED AT 14:02 07/27/09 |
27-Jul-2009 14:05:24 | Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 14:00 FOR OOM FOR TVR, DERATED TO 34 FOR LOW GAS PRESSURE. |
27-Jul-2009 14:06:02 | Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 14:00 FOR OOM FOR TVR. DERATED TO 33 FOR LOW GAS PRESSURE.. |
27-Jul-2009 14:09:33 | ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 14:00 FOR POST CONTINGENCY LOADING. |
27-Jul-2009 14:15:32 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 14:00. |
27-Jul-2009 14:16:27 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 14:00 FOR TVR. |
27-Jul-2009 14:22:04 | NYISO Locational based curtailment cut 120 MWs. 07/27/2009 14:22 EDT |
27-Jul-2009 14:24:48 | ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 14:00 FOR WESTERN CONTINGENCIES. |
27-Jul-2009 14:25:43 | NYISO Locational based curtailment cut 100 MWs. 07/27/2009 14:25 EDT |
27-Jul-2009 14:29:16 | NYISO Locational based curtailment cut 200 MWs. 07/27/2009 14:29 EDT |
27-Jul-2009 14:34:44 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 14:00. |
27-Jul-2009 14:38:20 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 14:00. |
27-Jul-2009 15:09:24 | ISO UPDATES RAVENSWOOD___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 15:00 FOR POST CONTINGENCY LOADING. |
27-Jul-2009 15:17:17 | ISO UPDATES RAVENSWOOD___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 15:00 FOR POST CONTINGENCY LOADING. |
27-Jul-2009 15:17:48 | Metering Authority - Long Island Power Authority UPDATES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 15:00 FOR EAST END LOAD. |
27-Jul-2009 15:40:01 | ISO REMOVES RAVENSWOOD___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 15:00. |
27-Jul-2009 16:00:48 | ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 16:00 FOR POST CONTINGENCY LOADING. Record deleted in evaluating hour.. |
27-Jul-2009 16:21:05 | NYISO Locational based curtailment cut 201 MWs. 07/27/2009 16:21 EDT |
27-Jul-2009 17:00:15 | NYISO Locational based curtailment cut 200 MWs. 07/27/2009 17:00 EDT |
27-Jul-2009 17:18:24 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 17:00. |
27-Jul-2009 17:22:04 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 18:00 FOR TVR. |
27-Jul-2009 18:05:13 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 18:00. |
27-Jul-2009 18:26:49 | Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 18:00. |
27-Jul-2009 18:30:47 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 18:00. |
27-Jul-2009 18:30:47 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 18:00. |
27-Jul-2009 18:55:21 | Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 18:00 FOR OOM FOR TVR. |
27-Jul-2009 19:00:13 | REQUESTS AT 18:50 07/27/09 Con Ed Thunderstorm Alert (TSA) has been terminated |
27-Jul-2009 19:08:24 | THUNDER STORM ALERT TERMINATED AT 18:50 07/27/09 |
27-Jul-2009 19:20:53 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 19:00. |
27-Jul-2009 19:20:53 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 19:00. |
27-Jul-2009 19:30:43 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 19:00. |
27-Jul-2009 19:46:47 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 19:00. |
27-Jul-2009 19:46:48 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 19:00. |
27-Jul-2009 19:58:03 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 19:00. |
27-Jul-2009 20:15:44 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 20:00. |
27-Jul-2009 21:13:33 | Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 21:00 FOR local security. |
27-Jul-2009 21:14:06 | Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 21:00 FOR local security. |
27-Jul-2009 21:25:29 | ISO UPDATES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 21:00 FOR local security. |
27-Jul-2009 21:25:55 | ISO UPDATES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 21:00 FOR local security. |
27-Jul-2009 22:22:18 | Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 22:00. |
27-Jul-2009 22:22:18 | Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 22:00. |
27-Jul-2009 22:31:49 | ISO REMOVES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 22:00. |
27-Jul-2009 22:58:46 | Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/27/2009 22:00. |
27-Jul-2009 23:16:38 | ISO REMOVES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/27/2009 23:00. |
Insert Time | Message |
27-Jul-2009 04:04:00 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:00 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:00 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:00 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:00 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:00 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:00 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:01 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:01 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:01 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:01 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:01 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:01 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:01 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:01 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:01 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:01 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 04:04:01 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/27/2009 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 05:03:44 | 07/27/2009 05:03:44 Generator: POLETTI____ requested for Day Ahead Reliability in DAM market for 07/28/2009 00 to 07/28/2009 23 |
27-Jul-2009 05:03:44 | 07/27/2009 05:03:44 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 07/28/2009 00 to 07/28/2009 23 |
27-Jul-2009 05:03:44 | 07/27/2009 05:03:44 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 07/28/2009 00 to 07/28/2009 23 |
27-Jul-2009 05:03:44 | 07/27/2009 05:03:44 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 07/28/2009 00 to 07/28/2009 23 |
27-Jul-2009 05:03:44 | 07/27/2009 05:03:44 Generator: PORT_JEFF_3 requested for Day Ahead Reliability in DAM market for 07/28/2009 00 to 07/28/2009 23 |
27-Jul-2009 05:03:44 | 07/27/2009 05:03:44 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 07/28/2009 00 to 07/28/2009 23 |
27-Jul-2009 05:03:44 | 07/27/2009 05:03:44 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 07/28/2009 00 to 07/28/2009 23 |
27-Jul-2009 05:03:44 | 07/27/2009 05:03:44 Generator: PORT_JEFF_4 requested for Day Ahead Reliability in DAM market for 07/28/2009 00 to 07/28/2009 23 |
27-Jul-2009 05:03:44 | 07/27/2009 05:03:44 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 07/28/2009 00 to 07/28/2009 23 |
27-Jul-2009 05:03:44 | 07/27/2009 05:03:44 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 07/28/2009 00 to 07/28/2009 23 |
27-Jul-2009 10:36:17 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/28/2009 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 10:36:27 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/28/2009 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:42 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 05 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:42 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 08 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:42 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 09 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:42 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 06 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:42 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 07 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:43 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 10 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:43 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 18 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:43 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 19 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:43 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 17 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:43 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 12 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:43 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 14 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:43 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 15 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:43 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 16 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:43 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 13 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:43 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 11 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:44 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 20 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:44 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 23 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:44 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 21 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 14:35:44 | Generator: GREENIDGE___4 scheduled for local reliability in DAM market for 07/28/2009 22 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:30 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:30 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 13 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:30 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:30 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 11 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:30 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:30 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 12 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:31 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 14 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:31 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 18 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:31 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 20 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:31 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 21 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:31 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 19 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:31 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 17 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:31 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 15 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 16:25:31 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 07/28/2009 16 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:07 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 07 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:08 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 08 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:08 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 09 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:08 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 10 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:08 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 12 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:08 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 11 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 13 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 18 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 22 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 21 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 20 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 19 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 17 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 14 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 16 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
27-Jul-2009 18:11:09 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/28/2009 15 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |