P-2529-Jul-2009

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
29-Jul-2009 00:18:03ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 00:00 FOR local security.
29-Jul-2009 00:24:37ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 00:00.
29-Jul-2009 00:27:10Metering Authority - Consolidated Edison of NY UPDATES ASTORIA___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 00:00 FOR local security..
29-Jul-2009 00:27:32Metering Authority - Consolidated Edison of NY REMOVES ASTORIA___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 01:00.
29-Jul-2009 02:15:20ISO REMOVES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 02:00.
29-Jul-2009 05:16:19ISO REMOVES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 05:00.
29-Jul-2009 07:24:27Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 08:00 FOR east end load.
29-Jul-2009 07:42:41NYISO Locational based curtailment cut 50 MWs. 07/29/2009 07:42 EDT
29-Jul-2009 08:49:27ISO REQUESTS HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 08:00 FOR 230kv contingency.
29-Jul-2009 09:04:59Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 09:00 FOR TVR.
29-Jul-2009 09:16:52ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 09:00 FOR 230kv contingencies.
29-Jul-2009 09:23:27ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 09:00 FOR 230kv contingencies.
29-Jul-2009 09:38:16ISO REQUESTS PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 09:00 FOR 138 kv contingencies.
29-Jul-2009 09:38:57ISO REQUESTS PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 09:00 FOR 138kv contiingencies.
29-Jul-2009 09:43:07ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 09:00 FOR 230kv contingencies.
29-Jul-2009 09:49:43Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 09:00 FOR east end load.
29-Jul-2009 10:10:08ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 10:00.
29-Jul-2009 10:12:37ISO UPDATES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 10:00 FOR 138 kv contingencies.
29-Jul-2009 10:13:00ISO UPDATES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 10:00 FOR 138kv contiingencies.
29-Jul-2009 10:29:37ISO UPDATES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 10:00 FOR 138 kv contingencies.
29-Jul-2009 10:29:57ISO UPDATES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 10:00 FOR 138kv contiingencies.
29-Jul-2009 10:36:06Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR.
29-Jul-2009 10:36:32Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR.
29-Jul-2009 10:37:00Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR.
29-Jul-2009 10:38:05Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR.
29-Jul-2009 10:40:19Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR.
29-Jul-2009 10:43:30Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR.
29-Jul-2009 10:44:37Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR.
29-Jul-2009 10:47:26ISO REMOVES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 11:00.
29-Jul-2009 10:47:27ISO REMOVES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 11:00.
29-Jul-2009 12:01:04ISO UPDATES HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 12:00 FOR 230kv contingency.
29-Jul-2009 12:09:01ISO REQUESTS ASTORIA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 13:00 FOR Unit Offline.
29-Jul-2009 12:32:23ISO UPDATES HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 12:00 FOR 230kv contingency.
29-Jul-2009 12:58:53Metering Authority - Niagara Mohawk REQUESTS BEAVER RIVER___HYD OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 12:00 FOR subtransmission.
29-Jul-2009 13:09:09ISO UPDATES HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 13:00 FOR 230kv contingency.
29-Jul-2009 13:34:04ISO REQUESTS ARTHUR_KILL_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 13:00 FOR 345kv contingencies.
29-Jul-2009 13:42:34Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00 FOR TVR.
29-Jul-2009 13:43:23Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00 FOR TVR.
29-Jul-2009 13:50:00Metering Authority - Niagara Mohawk REMOVES BEAVER RIVER___HYD OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 13:00.
29-Jul-2009 14:06:3807/29/2009 14:04:28 NYISO large event reserve pick-up executed.
29-Jul-2009 14:06:52Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00 FOR TVR.
29-Jul-2009 14:11:26NYISO Locational based curtailment cut 660 MWs. Trip 07/29/2009 14:11 EDT
29-Jul-2009 14:13:2507/29/2009 14:12:28 NYISO large event reserve pick-up executed.
29-Jul-2009 14:21:50Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00 FOR east end load.
29-Jul-2009 14:37:52ISO UPDATES ARTHUR_KILL_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 14:00 FOR 345kv contingencies.
29-Jul-2009 14:51:40Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00 FOR TVR.
29-Jul-2009 14:52:00Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00 FOR TVR.
29-Jul-2009 14:53:25Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00.
29-Jul-2009 16:53:40ISO UPDATES ARTHUR_KILL_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 16:00 FOR 345kv contingencies.
29-Jul-2009 17:45:00ISO REMOVES HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 17:00.
29-Jul-2009 17:51:46Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 17:00.
29-Jul-2009 17:52:18Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 17:00 FOR TVR.
29-Jul-2009 18:00:39ISO REMOVES ARTHUR_KILL_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 18:00.
29-Jul-2009 18:06:40Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00.
29-Jul-2009 18:13:26Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00 FOR TVR.
29-Jul-2009 18:13:57Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00 FOR TVR.
29-Jul-2009 18:17:01Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00.
29-Jul-2009 18:17:02Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00.
29-Jul-2009 18:17:02Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00.
29-Jul-2009 18:17:02Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00.
29-Jul-2009 18:21:06Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00.
29-Jul-2009 19:16:45H Q initiated curtailment cut 84 MWs. 07/29/2009 19:16 EDT
29-Jul-2009 19:36:52ISO REQUESTS PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 19:00 FOR Post cont loading.
29-Jul-2009 20:05:29Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 20:00.
29-Jul-2009 20:58:43ISO REMOVES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 20:00.
29-Jul-2009 21:07:51Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 21:00.
29-Jul-2009 21:07:51Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 21:00.
29-Jul-2009 22:22:21Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/30/2009 00:00 FOR east end load.
29-Jul-2009 23:54:16REQUESTS AT 23:49 07/29/09
29-Jul-2009 23:59:16REQUESTS AT 23:49 07/29/09 THUNDER STORM ALERT TERMINATED

Committed for Reliability

Back to top
Insert TimeMessage
29-Jul-2009 05:04:1207/29/2009 05:04:12 Generator: POLETTI____ requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23
29-Jul-2009 05:04:1207/29/2009 05:04:12 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23
29-Jul-2009 05:04:1207/29/2009 05:04:12 Generator: PORT_JEFF_3 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23
29-Jul-2009 05:04:1207/29/2009 05:04:12 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23
29-Jul-2009 05:04:1207/29/2009 05:04:12 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23
29-Jul-2009 05:04:1207/29/2009 05:04:12 Generator: RAVENSWOOD___2 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23
29-Jul-2009 05:04:1207/29/2009 05:04:12 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23
29-Jul-2009 05:04:1207/29/2009 05:04:12 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23
29-Jul-2009 05:04:1207/29/2009 05:04:12 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23
29-Jul-2009 05:04:1307/29/2009 05:04:13 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23
29-Jul-2009 05:04:1307/29/2009 05:04:13 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 07/30/2009 08 to 07/30/2009 21
29-Jul-2009 05:04:1307/29/2009 05:04:13 Generator: PORT_JEFF_4 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23
29-Jul-2009 05:04:1307/29/2009 05:04:13 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23
29-Jul-2009 11:07:11Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 07/30/2009 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 11:08:27Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/30/2009 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 11:09:29Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/30/2009 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:11Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 06 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:12Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 08 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:12Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 07 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:12Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 09 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 10 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 12 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 15 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 14 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 13 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 11 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 16 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 18 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:13Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 17 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:14Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 19 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:14Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 23 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:14Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 22 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:14Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 21 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Jul-2009 13:48:14Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 20 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
29-Jul-2009 13:34:57Prices in the July 28, 2009 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the July 28, 2009 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the July 30, 2009 Day-Ahead Market encompassing Energy, Regulation, and Operating Reserves are correct.
29-Jul-2009 17:09:04Prices in the July 29, 2009 Real-Time Market for the period hours beginning 0 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the July 29, 2009 Hour-Ahead Market for the period hours beginning 0 through 11 are correct.