P-2519-Jul-2009

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
19-Jul-2009 05:27:21O H initiated curtailment cut 208 MWs. 07/19/2009 05:27 EDT
19-Jul-2009 08:26:48Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2009 08:00 FOR EAST END LOAD.
19-Jul-2009 10:05:11Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2009 10:00 FOR East end load.
19-Jul-2009 10:48:30ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 10:00 FOR WESTERN SECURITY.
19-Jul-2009 10:52:28ISO REQUESTS DUNKIRK___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 10:00 FOR WESTERN CONTINGENCY.
19-Jul-2009 11:03:40ISO UPDATES DUNKIRK___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 11:00 FOR WESTERN CONTINGENCY.
19-Jul-2009 11:14:20ISO UPDATES DUNKIRK___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 11:00 FOR WESTERN CONTINGENCY.
19-Jul-2009 11:14:39ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 11:00.
19-Jul-2009 11:48:44Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2009 11:00 FOR EAST END LOAD.
19-Jul-2009 12:29:41ISO REMOVES DUNKIRK___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 12:00.
19-Jul-2009 13:29:35ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 13:00 FOR CPS.
19-Jul-2009 13:32:48ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 13:00.
19-Jul-2009 16:06:11ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 16:00 FOR CPS.
19-Jul-2009 16:12:57ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 16:00.
19-Jul-2009 16:49:46ISO REQUESTS HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 16:00 FOR WESTERN SECURITY.
19-Jul-2009 17:11:42ISO UPDATES HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 17:00 FOR WESTERN SECURITY.
19-Jul-2009 17:29:32ISO UPDATES HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 17:00 FOR WESTERN SECURITY.
19-Jul-2009 17:42:52ISO UPDATES HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 17:00 FOR WESTERN SECURITY.
19-Jul-2009 18:12:06ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 18:00 FOR WESTERN SECURITY.
19-Jul-2009 18:17:21ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 18:00 FOR WESTERN SECURITY.
19-Jul-2009 18:36:22Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2009 18:00.
19-Jul-2009 19:28:50Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2009 19:00.
19-Jul-2009 20:13:02ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/19/2009 20:00.
19-Jul-2009 21:10:50H Q initiated curtailment cut 165 MWs. 07/19/2009 21:10 EDT
19-Jul-2009 21:33:41ISO REQUESTS HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/20/2009 00:00 FOR WESTERN SECURITY.
19-Jul-2009 22:48:45Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/19/2009 22:00.

Committed for Reliability

Back to top
Insert TimeMessage
19-Jul-2009 05:04:1307/19/2009 05:04:13 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 07/20/2009 05 to 07/20/2009 23
19-Jul-2009 11:15:27Generator: BARRETT___2 scheduled for local reliability in DAM market for 07/20/2009 23 Energy = 45 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 11:15:58Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 07/20/2009 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 11:15:58Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 07/20/2009 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 11:16:18Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/20/2009 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 11:16:18Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 07/20/2009 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:44Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/19/2009 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:44Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/19/2009 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:44Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/19/2009 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:45Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/19/2009 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:45Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/19/2009 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:45Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/19/2009 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:45Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:45Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:45Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:45Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:45Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:45Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:45Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:46Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:46Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:46Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:46Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:46Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:46Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:46Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:46Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:47Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:47Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:47Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:47Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:47Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:47Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:47Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:47Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 16:13:47Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 07/20/2009 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:29:58Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:29:59Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:29:59Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:00Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:00Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:00Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:00Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:00Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:00Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:00Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:00Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:00Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:00Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:00Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:01Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:01Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:01Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:01Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:01Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:01Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:01Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:01Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:01Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jul-2009 21:30:02Generator: ASTORIA___4 scheduled for local reliability in DAM market for 07/20/2009 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
19-Jul-2009 14:40:07Prices in the July 18, 2009 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the July 18, 2009 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the July 20, 2009 Day-Ahead Market encompassing Energy, Regulation, and Operating Reserves are correct.
19-Jul-2009 15:21:24Prices in the July 19, 2009 Real-Time Market for the period hours beginning 0 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the July 19, 2009 Hour-Ahead Market for the period hours beginning 0 through 11 are correct.