29-Jul-2009 00:18:03 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 00:00 FOR local security. |
29-Jul-2009 00:24:37 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 00:00. |
29-Jul-2009 00:27:10 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 00:00 FOR local security.. |
29-Jul-2009 00:27:32 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA___4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 01:00. |
29-Jul-2009 02:15:20 | ISO REMOVES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 02:00. |
29-Jul-2009 05:16:19 | ISO REMOVES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 05:00. |
29-Jul-2009 07:24:27 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 08:00 FOR east end load. |
29-Jul-2009 07:42:41 | NYISO Locational based curtailment cut 50 MWs. 07/29/2009 07:42 EDT |
29-Jul-2009 08:49:27 | ISO REQUESTS HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 08:00 FOR 230kv contingency. |
29-Jul-2009 09:04:59 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 09:00 FOR TVR. |
29-Jul-2009 09:16:52 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 09:00 FOR 230kv contingencies. |
29-Jul-2009 09:23:27 | ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 09:00 FOR 230kv contingencies. |
29-Jul-2009 09:38:16 | ISO REQUESTS PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 09:00 FOR 138 kv contingencies. |
29-Jul-2009 09:38:57 | ISO REQUESTS PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 09:00 FOR 138kv contiingencies. |
29-Jul-2009 09:43:07 | ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 09:00 FOR 230kv contingencies. |
29-Jul-2009 09:49:43 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 09:00 FOR east end load. |
29-Jul-2009 10:10:08 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 10:00. |
29-Jul-2009 10:12:37 | ISO UPDATES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 10:00 FOR 138 kv contingencies. |
29-Jul-2009 10:13:00 | ISO UPDATES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 10:00 FOR 138kv contiingencies. |
29-Jul-2009 10:29:37 | ISO UPDATES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 10:00 FOR 138 kv contingencies. |
29-Jul-2009 10:29:57 | ISO UPDATES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 10:00 FOR 138kv contiingencies. |
29-Jul-2009 10:36:06 | Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR. |
29-Jul-2009 10:36:32 | Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR. |
29-Jul-2009 10:37:00 | Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR. |
29-Jul-2009 10:38:05 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR. |
29-Jul-2009 10:40:19 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR. |
29-Jul-2009 10:43:30 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR. |
29-Jul-2009 10:44:37 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 11:00 FOR TVR. |
29-Jul-2009 10:47:26 | ISO REMOVES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 11:00. |
29-Jul-2009 10:47:27 | ISO REMOVES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 11:00. |
29-Jul-2009 12:01:04 | ISO UPDATES HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 12:00 FOR 230kv contingency. |
29-Jul-2009 12:09:01 | ISO REQUESTS ASTORIA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 13:00 FOR Unit Offline. |
29-Jul-2009 12:32:23 | ISO UPDATES HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 12:00 FOR 230kv contingency. |
29-Jul-2009 12:58:53 | Metering Authority - Niagara Mohawk REQUESTS BEAVER RIVER___HYD OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 12:00 FOR subtransmission. |
29-Jul-2009 13:09:09 | ISO UPDATES HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 13:00 FOR 230kv contingency. |
29-Jul-2009 13:34:04 | ISO REQUESTS ARTHUR_KILL_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 13:00 FOR 345kv contingencies. |
29-Jul-2009 13:42:34 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00 FOR TVR. |
29-Jul-2009 13:43:23 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00 FOR TVR. |
29-Jul-2009 13:50:00 | Metering Authority - Niagara Mohawk REMOVES BEAVER RIVER___HYD OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 13:00. |
29-Jul-2009 14:06:38 | 07/29/2009 14:04:28 NYISO large event reserve pick-up executed. |
29-Jul-2009 14:06:52 | Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00 FOR TVR. |
29-Jul-2009 14:11:26 | NYISO Locational based curtailment cut 660 MWs. Trip 07/29/2009 14:11 EDT |
29-Jul-2009 14:13:25 | 07/29/2009 14:12:28 NYISO large event reserve pick-up executed. |
29-Jul-2009 14:21:50 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00 FOR east end load. |
29-Jul-2009 14:37:52 | ISO UPDATES ARTHUR_KILL_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 14:00 FOR 345kv contingencies. |
29-Jul-2009 14:51:40 | Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00 FOR TVR. |
29-Jul-2009 14:52:00 | Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00 FOR TVR. |
29-Jul-2009 14:53:25 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 14:00. |
29-Jul-2009 16:53:40 | ISO UPDATES ARTHUR_KILL_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 16:00 FOR 345kv contingencies. |
29-Jul-2009 17:45:00 | ISO REMOVES HUNTLEY___68 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 17:00. |
29-Jul-2009 17:51:46 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 17:00. |
29-Jul-2009 17:52:18 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 17:00 FOR TVR. |
29-Jul-2009 18:00:39 | ISO REMOVES ARTHUR_KILL_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 18:00. |
29-Jul-2009 18:06:40 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00. |
29-Jul-2009 18:13:26 | Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00 FOR TVR. |
29-Jul-2009 18:13:57 | Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00 FOR TVR. |
29-Jul-2009 18:17:01 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00. |
29-Jul-2009 18:17:02 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00. |
29-Jul-2009 18:17:02 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00. |
29-Jul-2009 18:17:02 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00. |
29-Jul-2009 18:21:06 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 18:00. |
29-Jul-2009 19:16:45 | H Q initiated curtailment cut 84 MWs. 07/29/2009 19:16 EDT |
29-Jul-2009 19:36:52 | ISO REQUESTS PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 19:00 FOR Post cont loading. |
29-Jul-2009 20:05:29 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 20:00. |
29-Jul-2009 20:58:43 | ISO REMOVES PORT_JEFF_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 07/29/2009 20:00. |
29-Jul-2009 21:07:51 | Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 21:00. |
29-Jul-2009 21:07:51 | Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/29/2009 21:00. |
29-Jul-2009 22:22:21 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 07/30/2009 00:00 FOR east end load. |
29-Jul-2009 23:54:16 | REQUESTS AT 23:49 07/29/09 |
29-Jul-2009 23:59:16 | REQUESTS AT 23:49 07/29/09 THUNDER STORM ALERT TERMINATED |
Insert Time | Message |
29-Jul-2009 05:04:12 | 07/29/2009 05:04:12 Generator: POLETTI____ requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23 |
29-Jul-2009 05:04:12 | 07/29/2009 05:04:12 Generator: RAVENSWOOD___3 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23 |
29-Jul-2009 05:04:12 | 07/29/2009 05:04:12 Generator: PORT_JEFF_3 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23 |
29-Jul-2009 05:04:12 | 07/29/2009 05:04:12 Generator: ARTHUR_KILL_2 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23 |
29-Jul-2009 05:04:12 | 07/29/2009 05:04:12 Generator: ASTORIA___4 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23 |
29-Jul-2009 05:04:12 | 07/29/2009 05:04:12 Generator: RAVENSWOOD___2 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23 |
29-Jul-2009 05:04:12 | 07/29/2009 05:04:12 Generator: MILLIKEN___2 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23 |
29-Jul-2009 05:04:12 | 07/29/2009 05:04:12 Generator: RAVENSWOOD___1 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23 |
29-Jul-2009 05:04:12 | 07/29/2009 05:04:12 Generator: ASTORIA___3 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23 |
29-Jul-2009 05:04:13 | 07/29/2009 05:04:13 Generator: ASTORIA___5 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23 |
29-Jul-2009 05:04:13 | 07/29/2009 05:04:13 Generator: INDECK___OLEAN requested for Day Ahead Reliability in DAM market for 07/30/2009 08 to 07/30/2009 21 |
29-Jul-2009 05:04:13 | 07/29/2009 05:04:13 Generator: PORT_JEFF_4 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23 |
29-Jul-2009 05:04:13 | 07/29/2009 05:04:13 Generator: GREENIDGE___4 requested for Day Ahead Reliability in DAM market for 07/30/2009 00 to 07/30/2009 23 |
29-Jul-2009 11:07:11 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 07/30/2009 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 11:08:27 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/30/2009 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 11:09:29 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/30/2009 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:11 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 06 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:12 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 08 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:12 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 07 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:12 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 09 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 10 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 12 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 15 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 14 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 13 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 11 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 16 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 18 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:13 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 17 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:14 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 19 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:14 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 23 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:14 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 22 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:14 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 21 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Jul-2009 13:48:14 | Generator: NEG NORTH_FLCN_SEA scheduled for SRE as initiated by ISO in DAM market for 07/30/2009 20 Energy = 138 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |