P-2520-May-2009

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
20-May-2009 01:09:24PJM initiated curtailment cut 200 MWs. 05/20/2009 01:09 EDT
20-May-2009 02:14:13NPX initiated curtailment cut 355 MWs. 05/20/2009 02:14 EDT
20-May-2009 02:27:06ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/20/2009 02:00 FOR .
20-May-2009 02:58:36ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/20/2009 02:00 FOR .
20-May-2009 03:48:56ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/20/2009 04:00 FOR .
20-May-2009 03:51:13ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/20/2009 03:00 FOR .
20-May-2009 04:31:50ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/20/2009 04:00 FOR .
20-May-2009 14:59:55ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/20/2009 14:00 FOR 345Kv Cont..
20-May-2009 17:16:08ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/20/2009 17:00.

Committed for Reliability

Back to top
Insert TimeMessage
20-May-2009 05:05:0005/20/2009 05:05:00 Generator: BARRETT___1 requested for Day Ahead Reliability in DAM market for 05/21/2009 00 to 05/21/2009 23
20-May-2009 05:05:0105/20/2009 05:05:01 Generator: NORTHPORT___4 requested for Day Ahead Reliability in DAM market for 05/21/2009 00 to 05/21/2009 23
20-May-2009 05:05:0105/20/2009 05:05:01 Generator: PORT_JEFF_3 requested for Day Ahead Reliability in DAM market for 05/21/2009 00 to 05/21/2009 23
20-May-2009 05:05:0105/20/2009 05:05:01 Generator: MILLIKEN___1 requested for Day Ahead Reliability in DAM market for 05/21/2009 00 to 05/21/2009 23
20-May-2009 05:05:0105/20/2009 05:05:01 Generator: NORTHPORT___2 requested for Day Ahead Reliability in DAM market for 05/21/2009 00 to 05/21/2009 23
20-May-2009 09:50:11Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/20/2009 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 09:50:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/20/2009 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 09:50:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/20/2009 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 09:50:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/20/2009 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 09:50:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/20/2009 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 09:50:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/20/2009 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 09:50:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/20/2009 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 09:50:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/20/2009 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 09:50:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/20/2009 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 09:50:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/20/2009 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 09:50:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/20/2009 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 09:50:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/20/2009 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:19:10Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 05/21/2009 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:19:11Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 05/21/2009 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:19:50Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/21/2009 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:19:50Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/21/2009 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:48:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/21/2009 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:48:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/21/2009 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:48:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/21/2009 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:48:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/21/2009 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:48:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/21/2009 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:48:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/21/2009 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:48:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/21/2009 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:48:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/21/2009 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:48:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/21/2009 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:48:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/21/2009 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:48:14Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/21/2009 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:49:05Generator: POLETTI____ scheduled for local reliability in DAM market for 05/21/2009 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:49:05Generator: POLETTI____ scheduled for local reliability in DAM market for 05/21/2009 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 12:49:06Generator: POLETTI____ scheduled for local reliability in DAM market for 05/21/2009 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:10Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:10Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:11Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:11Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:11Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:11Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:11Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:11Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:11Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:11Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:11Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:11Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:11Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:12Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:12Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:12Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:12Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:12Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:12Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:12Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:12Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:12Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:12Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-May-2009 13:08:13Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 05/21/2009 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
20-May-2009 12:35:57Prices in the May 19, 2009 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the May 19, 2009 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the May 21, 2009 Day-Ahead Market encompassing Energy, Regulation, and Operating Reserves are correct.
20-May-2009 15:47:40Prices in the May 20, 2009 Real-Time Market for the period hours beginning 0 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the May 20, 2009 Hour-Ahead Market for the period hours beginning 0 through 11 are correct.
20-May-2009 18:03:54NYISO has updated Real-Time prices on OASIS for 5/19/2009 HB (10).