P-2504-Feb-2009

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
04-Feb-2009 08:12:35ISO REQUESTS CH_RES_NIAGARA OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/04/2009 08:00 FOR REPLACE BEARINGS.
04-Feb-2009 09:07:35ISO REQUESTS NYPA___HOLTSVILL OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/04/2009 09:00 FOR FUEL SWAP.
04-Feb-2009 09:53:27ISO REMOVES NYPA___HOLTSVILL OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/04/2009 09:00.
04-Feb-2009 12:07:02ISO REMOVES CH_RES_NIAGARA OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/04/2009 12:00.
04-Feb-2009 16:42:45H Q initiated curtailment cut 100 MWs. 02/04/2009 16:42 EST
04-Feb-2009 17:55:20Metering Authority - Niagara Mohawk REQUESTS NIAGARA____ OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 02/04/2009 17:00 FOR PC FLOWS.
04-Feb-2009 18:06:48Metering Authority - Niagara Mohawk UPDATES NIAGARA____ OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 02/04/2009 18:00 FOR PC FLOWS.
04-Feb-2009 18:07:17Metering Authority - Niagara Mohawk UPDATES NIAGARA____ OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 02/04/2009 18:00 FOR PC FLOWS.
04-Feb-2009 18:08:51Metering Authority - Niagara Mohawk UPDATES NIAGARA____ OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 02/04/2009 18:00 FOR PC FLOWS.
04-Feb-2009 18:17:39Metering Authority - Niagara Mohawk UPDATES NIAGARA____ OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 02/04/2009 18:00 FOR PC FLOWS.
04-Feb-2009 18:19:05Metering Authority - Niagara Mohawk REMOVES NIAGARA____ OUT OF MERIT. OOM FOR TO RELIABILITY AT START TIME 02/04/2009 18:00.
04-Feb-2009 21:10:45ISO UPDATES RAVENSWOOD___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/04/2009 21:00 FOR TUBE LEAK.
04-Feb-2009 21:19:33ISO UPDATES RAVENSWOOD___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/04/2009 21:00 FOR TUBE LEAK.

Committed for Reliability

Back to top
Insert TimeMessage
04-Feb-2009 03:52:40Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 02/04/2009 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 03:52:41Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 02/04/2009 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 03:52:41Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 02/04/2009 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 03:52:41Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 02/04/2009 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 03:52:41Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 02/04/2009 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:18Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 09 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:18Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 10 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:18Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 12 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:18Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 13 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:18Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 11 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:19Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 14 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:19Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 16 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:19Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 18 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:19Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 20 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:19Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 23 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:19Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 22 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:19Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 21 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:19Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 19 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:19Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 17 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 06:55:19Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/04/2009 15 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:04Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 00 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:04Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 01 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:04Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 02 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:04Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 05 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:04Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 04 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:04Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 03 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 06 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 07 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 09 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 16 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 15 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 14 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 13 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 12 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 11 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 10 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/05/2009 08 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:52Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/05/2009 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:52Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/05/2009 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:18:52Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/05/2009 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:19:30Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 02/05/2009 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:19:30Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 02/05/2009 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:20:06Generator: POLETTI____ scheduled for local reliability in DAM market for 02/05/2009 11 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:20:06Generator: POLETTI____ scheduled for local reliability in DAM market for 02/05/2009 12 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:20:06Generator: POLETTI____ scheduled for local reliability in DAM market for 02/05/2009 13 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:20:07Generator: POLETTI____ scheduled for local reliability in DAM market for 02/05/2009 14 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:20:07Generator: POLETTI____ scheduled for local reliability in DAM market for 02/05/2009 15 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:20:07Generator: POLETTI____ scheduled for local reliability in DAM market for 02/05/2009 18 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:20:07Generator: POLETTI____ scheduled for local reliability in DAM market for 02/05/2009 19 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:20:07Generator: POLETTI____ scheduled for local reliability in DAM market for 02/05/2009 17 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:20:07Generator: POLETTI____ scheduled for local reliability in DAM market for 02/05/2009 16 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:20:07Generator: POLETTI____ scheduled for local reliability in DAM market for 02/05/2009 20 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:20:07Generator: POLETTI____ scheduled for local reliability in DAM market for 02/05/2009 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:20:07Generator: POLETTI____ scheduled for local reliability in DAM market for 02/05/2009 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 12:20:07Generator: POLETTI____ scheduled for local reliability in DAM market for 02/05/2009 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 15:24:04Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 02/05/2009 08 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 15:24:04Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 02/05/2009 09 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 15:24:05Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 02/05/2009 10 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 15:24:05Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 02/05/2009 11 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 15:24:05Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 02/05/2009 14 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 15:24:05Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 02/05/2009 16 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 15:24:05Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 02/05/2009 18 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 15:24:05Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 02/05/2009 20 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 15:24:05Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 02/05/2009 19 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 15:24:05Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 02/05/2009 17 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 15:24:05Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 02/05/2009 15 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 15:24:05Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 02/05/2009 13 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
04-Feb-2009 15:24:05Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 02/05/2009 12 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
04-Feb-2009 15:45:44Prices in the February 03, 2009 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the February 03, 2009 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the February 05, 2009 Day-Ahead Market encompassing Energy, Regulation, and Operating Reserves are correct.
04-Feb-2009 17:11:42NYISO is reserving HB 10 in the February 04, 2009 Real-Time Market for the period hours beginning 0 through 11 encompassing Energy, Regulation, and Operating Reserves. Prices in the February 04, 2009 Hour-Ahead Market for the period hours beginning 0 through 11 are correct.