05-Sep-2008 00:02:02GLOBAL GREEN_PORT_GT1 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 09/04/2008 23:59.
05-Sep-2008 08:06:15Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 08:00 FOR .
05-Sep-2008 08:26:11Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 08:00 FOR East End load.
05-Sep-2008 09:46:20Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2008 13:00 FOR TSA (MB) modified original OOM for LLR, Original Type Gen Derate, Original Log:Half unit wind milling, per CRL.
05-Sep-2008 09:52:49Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2008 14:00 FOR TSA (MB) modified original OOM for LRR, Original Type Gen Derate, Original Log: tripped on vibration. record deleted in current hour, per CRL.
05-Sep-2008 09:57:51Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 09:00 FOR TVR.
05-Sep-2008 10:28:45Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 10:00 FOR East End load.
05-Sep-2008 11:09:58Metering Authority - Long Island Power Authority UPDATES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2008 21:00 FOR TSA (MB) modified original OOM for LRR; orignal Type: Gen Derate, Original Log: unit off early, per CRL.
05-Sep-2008 11:29:32Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 11:00 FOR East End load.
05-Sep-2008 12:14:18Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 12:00 FOR TVR.
05-Sep-2008 12:14:48Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 12:00 FOR TVR.
05-Sep-2008 12:15:06Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 12:00 FOR TVR.
05-Sep-2008 12:17:10Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 12:00 FOR TVR.
05-Sep-2008 12:17:38Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 12:00 FOR TVR.
05-Sep-2008 12:18:04Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 12:00 FOR East End load.
05-Sep-2008 12:26:38Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 12:00 FOR TVR.
05-Sep-2008 12:27:40Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 12:00 FOR TVR.
05-Sep-2008 13:14:1409/05/2008 13:13:36 NYISO large event reserve pick-up executed.
05-Sep-2008 13:21:4009/05/2008 13:20:12 NYISO large event reserve pick-up executed.
05-Sep-2008 13:27:10Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 13:00 FOR East End load.
05-Sep-2008 14:02:50Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 14:00 FOR TVR.
05-Sep-2008 14:05:12Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 14:00 FOR TVR.
05-Sep-2008 14:42:17Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 14:00 FOR TVR.
05-Sep-2008 14:44:08Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 14:00 FOR Unit problem.
05-Sep-2008 17:51:47Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 17:00 FOR TVR.
05-Sep-2008 19:18:41Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 19:00.
05-Sep-2008 19:19:11Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 19:00.
05-Sep-2008 19:20:03Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 19:00.
05-Sep-2008 19:20:29Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 19:00.
05-Sep-2008 19:20:37Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 19:00.
05-Sep-2008 19:21:30Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 19:00 FOR TVR.
05-Sep-2008 19:21:49Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 20:00 FOR TVR.
05-Sep-2008 19:22:04Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 19:00.
05-Sep-2008 19:22:30Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 19:00.
05-Sep-2008 19:22:41Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 19:00.
05-Sep-2008 19:22:55Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 19:00.
05-Sep-2008 19:25:29Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 19:00.
05-Sep-2008 19:25:38Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 19:00.
05-Sep-2008 19:25:47Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 19:00.
05-Sep-2008 21:39:49Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 21:00.
05-Sep-2008 23:09:03Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 23:00.
05-Sep-2008 23:09:14Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/05/2008 23:00.

Committed for Reliability

Back to top
Insert TimeMessage
05-Sep-2008 11:39:44Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 09/06/2008 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 11:40:26Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 09/06/2008 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 11:40:47Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/06/2008 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 11:41:26Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/06/2008 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:51Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:52Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:52Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:52Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:52Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:52Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:52Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:52Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:53Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:53Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:53Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:53Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:53Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:53Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:53Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:53Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:53Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:53Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:54Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:54Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:54Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:54Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:54Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:36:54Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/06/2008 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:39Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:39Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:39Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:39Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:40Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:40Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:40Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:40Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:40Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:40Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:40Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:40Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:41Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:41Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:41Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:41Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:41Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:41Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:41Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:41Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:41Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:41Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:41Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:37:42Generator: ASTORIA___4 scheduled for local reliability in DAM market for 09/06/2008 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:16Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:16Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:16Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:16Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:16Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:16Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:16Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:17Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:17Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:17Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:17Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:17Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:17Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:17Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:17Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:17Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:17Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:17Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:18Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:18Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:18Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:18Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:18Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:18Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/06/2008 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:48Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:48Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:48Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:48Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:48Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:48Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:49Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:49Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:49Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:49Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:49Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:49Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:49Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:49Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:49Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:50Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:50Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:50Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:50Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:50Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:50Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:50Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:50Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:38:50Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/06/2008 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:25Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 00 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:25Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 02 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:25Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 04 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:25Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 03 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:25Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 01 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:26Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 05 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:26Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 06 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:26Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 13 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:26Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 12 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:26Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 11 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:26Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 10 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:26Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 09 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:26Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 08 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:26Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 07 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:27Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 14 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:27Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:27Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:27Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:27Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 20 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:27Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 19 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:27Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 18 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:27Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 17 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:27Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 16 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:39:27Generator: NYPA___ASTORIA_CC2 scheduled for local reliability in DAM market for 09/06/2008 15 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:40:05Generator: POLETTI____ scheduled for local reliability in DAM market for 09/06/2008 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Sep-2008 13:40:05Generator: POLETTI____ scheduled for local reliability in DAM market for 09/06/2008 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
05-Sep-2008 09:37:01The NYISO is releasing prices in the September 3, 2008 Real-Time Market for hour beginning 20.
05-Sep-2008 15:40:42Prices in the September 04, 2008 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the September 04, 2008 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the September 06, 2008 Day-Ahead Market are correct.
05-Sep-2008 16:48:22Prices in the September 05, 2008 Real-Time Market for the period hours beginning 00 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the September 05, 2008 Hour-Ahead Market for the period hours beginning 00 through 11 are correct.