Insert Time | Message |
09-Jun-2008 00:10:13 | ISO REMOVES FAR ROCKAWAY___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2008 00:00. |
09-Jun-2008 06:10:42 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 06:00 FOR HIGH LOADS PER CON EDISON.. |
09-Jun-2008 06:48:00 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 06:00 FOR HIGH LOADS PER CON EDISON.. |
09-Jun-2008 07:02:11 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 07:00 FOR HIGH LOADS PER CON EDISON.. |
09-Jun-2008 07:14:25 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 07:00 FOR HIGH LOADS PER CON EDISON.. |
09-Jun-2008 07:24:10 | Metering Authority - Consolidated Edison of NY REQUESTS RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 07:00 FOR CE wants unit up to 125mw for min oil loads. |
09-Jun-2008 07:43:04 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 07:00 FOR HIGH LOADS PER CON EDISON.. |
09-Jun-2008 08:06:39 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 08:00 FOR East end load. |
09-Jun-2008 08:21:03 | Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 08:00 FOR East end load. |
09-Jun-2008 08:23:32 | Metering Authority - Consolidated Edison of NY REMOVES RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 08:00. |
09-Jun-2008 08:44:02 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 08:00 FOR HIGH LOADS PER CON EDISON.. |
09-Jun-2008 09:17:09 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 09:00 FOR HIGH LOADS PER CON EDISON.. |
09-Jun-2008 09:31:14 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/08/2008 21:00 FOR TSA (SJ) modified original OOM to accommodate SRE. Original Type: Gen Derate; Original Log: Startup.. |
09-Jun-2008 09:35:30 | Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/08/2008 23:00 FOR TSA (SJ) modified original OOM to accommodate SRE. Original Type: Committed for ISO Reliability; Original Log: 138kv contingencies. |
09-Jun-2008 10:11:19 | Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 10:00 FOR 69kv loading, post cont loss of Valley Stream bank 6 onto 69kv.. |
09-Jun-2008 10:25:28 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 10:00 FOR HIGH LOADS PER CON EDISON.. |
09-Jun-2008 10:38:51 | Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 10:00 FOR 69kv loading, post cont loss of Valley Stream bank 6 onto 69kv.. |
09-Jun-2008 10:59:11 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 10:00 FOR HIGH LOADS PER CON EDISON.. |
09-Jun-2008 11:16:13 | Metering Authority - Long Island Power Authority UPDATES NORTHPORT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/07/2008 23:00 FOR TSA (SJ) modified origingal OOM to accommodate SRE. Original Type: Gen Derate; Original Log: Ignitor problems.. |
09-Jun-2008 11:18:13 | Metering Authority - Long Island Power Authority UPDATES NORTHPORT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/07/2008 16:00 FOR TSA (SJ) modified original OOM to accommodate SRE. Original Type: Gen Derate; Original Log: cannot move due to silica. |
09-Jun-2008 11:19:22 | NYISO Locational based curtailment cut 200 MWs. |
09-Jun-2008 11:59:57 | Metering Authority - Niagara Mohawk REQUESTS PROJECT___ORANGE 1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 11:00 FOR Local voltage support. |
09-Jun-2008 12:06:04 | NYISO Locational based curtailment cut 74 MWs. |
09-Jun-2008 12:07:15 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR Esat end load. |
09-Jun-2008 12:15:11 | Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR East end load. |
09-Jun-2008 12:29:23 | Metering Authority - Niagara Mohawk REQUESTS FIBERTEK___ENERGY OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR Local voltage. |
09-Jun-2008 12:34:35 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR Transient voltage recovery. |
09-Jun-2008 12:35:09 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR Transient voltage recovery. |
09-Jun-2008 12:35:37 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR Transient voltage recovery. |
09-Jun-2008 12:39:25 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR Transient voltage recovery. |
09-Jun-2008 12:39:51 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR Transient voltage recovery. |
09-Jun-2008 12:40:26 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR Transient voltage recovery. |
09-Jun-2008 12:42:21 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR Transient voltage recovery. |
09-Jun-2008 12:45:47 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR Transient voltage recovery. |
09-Jun-2008 12:48:57 | Metering Authority - Niagara Mohawk REQUESTS CH_RES_SYRACUSE OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR Local voltage. |
09-Jun-2008 12:51:09 | Metering Authority - Niagara Mohawk REQUESTS SYRACUSE___ENERGY_ST1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR Local voltage. |
09-Jun-2008 12:52:14 | Metering Authority - Niagara Mohawk REQUESTS SYRACUSE___ENERGY_ST2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00 FOR Local voltage. |
09-Jun-2008 12:58:56 | Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 12:00. |
09-Jun-2008 13:00:47 | Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/08/2008 13:00 FOR TSA (SJ) modified original OOM for LRR per TO request. Original Type: Gen Derate; Original Log: tripped. |
09-Jun-2008 13:02:57 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/08/2008 13:00 FOR TSA (SJ) modified original OOM for LRR per TO Request. Original Type: Gen Derate; Original Log: tripped. |
09-Jun-2008 13:04:32 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/08/2008 16:00 FOR TSA (SJ) modified original OOM for LRR per TO Request. Original Type: Gen Derate; Original Log: High Temperature Spread. |
09-Jun-2008 13:06:16 | Metering Authority - Long Island Power Authority UPDATES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/08/2008 17:00 FOR TSA (SJ) modified original OOM for LRR per TO Request. Original Type: Gen Derate; Original Log: Tripped. |
09-Jun-2008 13:06:18 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 13:00 FOR Transient voltage recovery. |
09-Jun-2008 13:07:04 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 13:00 FOR Transient voltage recovery. |
09-Jun-2008 13:07:55 | Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/08/2008 17:00 FOR TSA (SJ) modified original OOM for LRR per TO Request. Original Type: Gen Derate; Original Log: Tripped. |
09-Jun-2008 13:09:19 | Metering Authority - Long Island Power Authority UPDATES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/08/2008 17:00 FOR TSA (SJ) modified original OOM for LRR per TO Request. Original Type: Gen Derate; Original Log: Tripped. |
09-Jun-2008 13:09:57 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 13:00 FOR Transient voltage recovery. |
09-Jun-2008 13:11:02 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 13:00 FOR Transient voltage recovery. |
09-Jun-2008 13:13:51 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 13:00 FOR East end load. |
09-Jun-2008 13:14:18 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 13:00 FOR East end load. |
09-Jun-2008 13:18:07 | NYISO Locational based curtailment cut 150 MWs. |
09-Jun-2008 13:33:31 | NYISO Locational based curtailment cut 161 MWs. |
09-Jun-2008 13:48:13 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 13:00 FOR Transient voltage recovery. |
09-Jun-2008 13:58:23 | 06/09/2008 13:57:52 NYISO large event reserve pick-up executed. |
09-Jun-2008 14:16:34 | 06/09/2008 14:13:58 NYISO large event reserve pick-up executed. |
09-Jun-2008 14:24:22 | ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2008 14:00 FOR ISO ACE. |
09-Jun-2008 14:24:50 | ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2008 14:00 FOR ISO ACE. |
09-Jun-2008 14:28:04 | Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 14:00 FOR Transient voltage recovery. |
09-Jun-2008 14:34:57 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 14:00. |
09-Jun-2008 14:36:03 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 14:00 FOR Transeint voltage recovery. |
09-Jun-2008 14:41:37 | Metering Authority - Consolidated Edison of NY REMOVES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 14:00. |
09-Jun-2008 14:44:21 | Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 14:00 FOR Transient voltage recovery. |
09-Jun-2008 14:45:07 | Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 14:00 FOR Transient voltage recovery. |
09-Jun-2008 14:46:34 | Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 14:00 FOR NYTransient voltage recovery. |
09-Jun-2008 15:07:53 | Metering Authority - Long Island Power Authority REQUESTS SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 15:00 FOR Transient voltage recovery. |
09-Jun-2008 15:27:25 | 06/09/2008 15:26:04 NYISO large event reserve pick-up executed. |
09-Jun-2008 15:58:34 | Metering Authority - Niagara Mohawk REMOVES FIBERTEK___ENERGY OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 15:00. |
09-Jun-2008 16:08:48 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 16:00 FOR Trasient voltage recovery. |
09-Jun-2008 16:09:11 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 16:00 FOR Trasient voltage recovery. |
09-Jun-2008 16:17:50 | NYISO Locational based curtailment cut 100 MWs. |
09-Jun-2008 16:27:05 | 06/09/2008 16:25:58 NYISO large event reserve pick-up executed. |
09-Jun-2008 17:26:10 | Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 17:00 FOR Transient voltage recovery. |
09-Jun-2008 17:49:32 | ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2008 17:00 FOR Needed for system resources. |
09-Jun-2008 18:05:35 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2008 18:00. |
09-Jun-2008 18:08:47 | Metering Authority - Niagara Mohawk UPDATES CARR STREET_E._SYR OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 18:00 FOR Local voltage. |
09-Jun-2008 18:09:06 | Metering Authority - Niagara Mohawk REMOVES CARR STREET_E._SYR OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 18:11:38 | ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2008 18:00 FOR Needed for system resources.. |
09-Jun-2008 18:16:28 | ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2008 18:00 FOR Needed for system resources.. |
09-Jun-2008 18:20:47 | Metering Authority - Niagara Mohawk UPDATES PROJECT___ORANGE 1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 18:00 FOR Local voltage. |
09-Jun-2008 18:21:05 | Metering Authority - Niagara Mohawk REMOVES PROJECT___ORANGE 1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 18:31:46 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2008 18:00. |
09-Jun-2008 18:37:52 | ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2008 18:00 FOR Needed for system resources.. |
09-Jun-2008 18:39:27 | Metering Authority - Niagara Mohawk REMOVES CH_RES_SYRACUSE OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 18:52:06 | Metering Authority - Niagara Mohawk REMOVES SYRACUSE___ENERGY_ST1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 18:52:28 | Metering Authority - Niagara Mohawk UPDATES SYRACUSE___ENERGY_ST2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 18:00 FOR Local voltage. |
09-Jun-2008 18:52:41 | Metering Authority - Niagara Mohawk REMOVES SYRACUSE___ENERGY_ST2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 19:18:20 | NYISO Locational based curtailment cut 200 MWs. |
09-Jun-2008 19:29:56 | Metering Authority - New York State Electric & Gas REQUESTS NEG CENTRAL___INDECK OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 19:00 FOR . |
09-Jun-2008 19:33:55 | Metering Authority - Niagara Mohawk UPDATES CH_RES_SYRACUSE OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 19:00 FOR STEAM TURBINE TRIP. |
09-Jun-2008 19:34:58 | NYISO Locational based curtailment cut 250 MWs. |
09-Jun-2008 19:36:58 | Metering Authority - New York State Electric & Gas UPDATES NEG CENTRAL___INDECK OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 19:00 FOR SRE'D BY NYSEG. |
09-Jun-2008 20:09:12 | Metering Authority - Long Island Power Authority REMOVES SHOREHAM_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 20:00. |
09-Jun-2008 20:10:18 | Metering Authority - Long Island Power Authority REMOVES SHOREHAM_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 20:00. |
09-Jun-2008 20:11:43 | Metering Authority - Niagara Mohawk UPDATES SYRACUSE___ENERGY_ST2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 20:00 FOR Local voltage. |
09-Jun-2008 20:15:48 | NYISO Locational based curtailment cut 300 MWs. |
09-Jun-2008 21:03:45 | Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 21:00. |
09-Jun-2008 21:06:15 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2008 21:00 FOR ACE. |
09-Jun-2008 21:06:54 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 21:10:42 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2008 21:00. |
09-Jun-2008 21:21:11 | Metering Authority - Niagara Mohawk REQUESTS OXBOW____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 21:00 FOR CONTINGENCY OVERLOAD. |
09-Jun-2008 21:22:42 | Metering Authority - Niagara Mohawk REMOVES OXBOW____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 23:00. |
09-Jun-2008 21:34:56 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2008 00:00 FOR Transient voltage recovery. |
09-Jun-2008 21:34:59 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2008 00:00 FOR Transient voltage recovery. |
09-Jun-2008 21:35:02 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2008 00:00 FOR Transient voltage recovery. |
09-Jun-2008 21:35:05 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2008 00:00 FOR Transient voltage recovery. |
09-Jun-2008 21:35:08 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2008 00:00 FOR Transient voltage recovery. |
09-Jun-2008 21:35:11 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2008 00:00 FOR Transient voltage recovery. |
09-Jun-2008 21:35:14 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2008 00:00 FOR Transient voltage recovery. |
09-Jun-2008 21:35:17 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2008 00:00 FOR Transient voltage recovery. |
09-Jun-2008 21:39:37 | Metering Authority - Niagara Mohawk REQUESTS OXBOW____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 23:00 FOR CONTINGENCY OVERLOAD. |
09-Jun-2008 21:56:17 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 21:00 FOR 69KV CONTINGENCY. |
09-Jun-2008 22:06:07 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 22:06:28 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 22:12:03 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 22:12:11 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 22:29:37 | Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 22:42:45 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 22:43:02 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 22:46:11 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 22:00. |
09-Jun-2008 23:31:13 | Metering Authority - Niagara Mohawk REMOVES OXBOW____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 23:00. |
09-Jun-2008 23:50:37 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2008 23:00. |
Insert Time | Message |
09-Jun-2008 11:10:16 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/10/2008 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:10:17 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/10/2008 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:10:53 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/10/2008 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:11:23 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/10/2008 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:33 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 06 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:33 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 07 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:34 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 08 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:34 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 13 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:34 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 15 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:34 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 17 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:34 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 16 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:34 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 14 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:34 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 12 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:34 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 09 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:34 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 11 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:34 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 10 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:35 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 18 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:16:35 | Generator: BINGHAMTON___COGEN scheduled for local reliability in DAM market for 06/10/2008 19 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:19:16 | Generator: GREENIDGE___3 scheduled for local reliability in DAM market for 06/10/2008 00 Energy = 15 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:19:16 | Generator: GREENIDGE___3 scheduled for local reliability in DAM market for 06/10/2008 01 Energy = 15 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:19:16 | Generator: GREENIDGE___3 scheduled for local reliability in DAM market for 06/10/2008 02 Energy = 15 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:19:16 | Generator: GREENIDGE___3 scheduled for local reliability in DAM market for 06/10/2008 03 Energy = 15 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:19:16 | Generator: GREENIDGE___3 scheduled for local reliability in DAM market for 06/10/2008 04 Energy = 15 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:19:16 | Generator: GREENIDGE___3 scheduled for local reliability in DAM market for 06/10/2008 05 Energy = 15 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:19:17 | Generator: GREENIDGE___3 scheduled for local reliability in DAM market for 06/10/2008 06 Energy = 15 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:19:17 | Generator: GREENIDGE___3 scheduled for local reliability in DAM market for 06/10/2008 07 Energy = 15 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:19:17 | Generator: GREENIDGE___3 scheduled for local reliability in DAM market for 06/10/2008 08 Energy = 15 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:36:56 | Generator: NEG CENTRAL___INDECK scheduled for local reliability in DAM market for 06/10/2008 07 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:36:57 | Generator: NEG CENTRAL___INDECK scheduled for local reliability in DAM market for 06/10/2008 08 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:36:57 | Generator: NEG CENTRAL___INDECK scheduled for local reliability in DAM market for 06/10/2008 09 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:36:57 | Generator: NEG CENTRAL___INDECK scheduled for local reliability in DAM market for 06/10/2008 10 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:36:58 | Generator: NEG CENTRAL___INDECK scheduled for local reliability in DAM market for 06/10/2008 11 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:36:58 | Generator: NEG CENTRAL___INDECK scheduled for local reliability in DAM market for 06/10/2008 12 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:36:58 | Generator: NEG CENTRAL___INDECK scheduled for local reliability in DAM market for 06/10/2008 13 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:36:58 | Generator: NEG CENTRAL___INDECK scheduled for local reliability in DAM market for 06/10/2008 14 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:36:58 | Generator: NEG CENTRAL___INDECK scheduled for local reliability in DAM market for 06/10/2008 15 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:36:58 | Generator: NEG CENTRAL___INDECK scheduled for local reliability in DAM market for 06/10/2008 16 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:36:58 | Generator: NEG CENTRAL___INDECK scheduled for local reliability in DAM market for 06/10/2008 17 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:36:58 | Generator: NEG CENTRAL___INDECK scheduled for local reliability in DAM market for 06/10/2008 18 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 11:36:58 | Generator: NEG CENTRAL___INDECK scheduled for local reliability in DAM market for 06/10/2008 19 Energy = 42 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 13:15:24 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/10/2008 21 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 13:15:24 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/10/2008 23 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 13:15:24 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/10/2008 22 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:50:23 | Generator: CARR STREET_E._SYR scheduled for local reliability in DAM market for 06/10/2008 17 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:50:23 | Generator: CARR STREET_E._SYR scheduled for local reliability in DAM market for 06/10/2008 19 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:50:23 | Generator: CARR STREET_E._SYR scheduled for local reliability in DAM market for 06/10/2008 18 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:50:24 | Generator: CARR STREET_E._SYR scheduled for local reliability in DAM market for 06/10/2008 20 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:50:24 | Generator: CARR STREET_E._SYR scheduled for local reliability in DAM market for 06/10/2008 21 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:22 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:23 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:23 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:23 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:23 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:23 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:23 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:23 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:23 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:23 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:24 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:24 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:24 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 14:59:24 | Generator: CH_RES_SYRACUSE scheduled for local reliability in DAM market for 06/10/2008 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:21 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 08 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:21 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 09 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 10 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 12 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 14 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 16 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 18 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 19 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 17 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 15 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 13 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 11 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:23 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 20 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:48:23 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 21 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:32 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 08 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:32 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 14 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:32 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 15 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:32 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 13 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:32 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 09 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:32 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 10 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:32 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 11 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:32 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 12 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:33 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 16 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:33 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 21 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:33 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 17 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:33 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 18 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:33 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 19 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 15:49:33 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 20 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:32 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:33 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:33 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 11 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:33 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:34 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 12 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:34 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 18 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:34 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 20 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:34 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 19 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:34 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 17 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:34 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 13 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:34 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 14 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:34 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 16 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:34 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 15 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 16:29:35 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2008 21 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 17:54:46 | Generator: SITHE___STERLING scheduled for local reliability in DAM market for 06/10/2008 22 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 17:55:23 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/10/2008 22 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:35 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 08 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:35 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 12 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:35 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 09 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:35 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 11 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:35 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 10 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:36 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 13 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:36 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 15 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:36 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 17 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:36 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 19 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:36 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 21 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:36 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 20 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:36 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 18 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:36 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 16 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2008 18:15:36 | Generator: PROJECT___ORANGE 1 scheduled for local reliability in DAM market for 06/10/2008 14 Energy = 23 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |