P-2508-Jan-2008

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
08-Jan-2008 08:04:12ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/08/2008 08:00 FOR 262 P/C FLOWS..
08-Jan-2008 08:22:42Metering Authority - Long Island Power Authority UPDATES NORTHPORT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 23:00 FOR Record modified by TSA(MB) for SRE; prev type Gen derate, prev desc ID fan repair.
08-Jan-2008 09:44:24Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modified per CRL by TSA(MB); prev type Comm for ISO Reliability, prev desc Con Ed switch to restore work.
08-Jan-2008 09:45:42Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 09:47:24Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 09:48:37Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modified per CRL by TSA(MB); prev type Comm for ISO Reliability, prev desc Con Ed switch to restore work.
08-Jan-2008 09:49:44ISO UPDATES NARROWS_GT1_3 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 01/07/2008 12:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con ed switch to restore work.
08-Jan-2008 09:51:05Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 09:52:01Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modified per CRL by TSA(MB), Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 09:53:49Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modified per CRL by TSA(MB); prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 09:54:50Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modifed per CRL by TSA(MB); prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 09:56:44Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 09:57:51Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, prev desc Con Ed switch to restore work.
08-Jan-2008 09:59:06Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modified per CRL by TSA(MB); Prev Type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:00:23Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:01:37Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:02:39Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:03:45Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modifed per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:04:42Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT1_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con ed switch to restore work.
08-Jan-2008 10:08:59ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/08/2008 10:00 FOR 262 P/C FLOWS..
08-Jan-2008 10:16:32Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modifed per CRL by TSA(MB); Prev Type Comm for ISO reliability, prev desc Con Ed switch to restore work.
08-Jan-2008 10:17:26Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliabilty, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:17:44ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/08/2008 10:00 FOR 262 P/C FLOWS..
08-Jan-2008 10:18:38Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modifed Per CRL by TSA(MB); Prev Type Comm for ISO reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:19:28Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modifed per CRL by TSA(MB); Prev type Comm for ISO Reliabilty, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:20:37Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modifed per CRL by TSA(MB); Prev type Comm for ISO Reliability, prev desc Con Ed switch to restor work.
08-Jan-2008 10:21:24Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:22:17Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:23:16Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, prev desc Con Ed switch to restore work.
08-Jan-2008 10:24:12Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modifed per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:25:08Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:26:15Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modified per CRL by TSA(MB); prev type Comm for ISO Reliability, prev desc Con Ed switch to restore work.
08-Jan-2008 10:27:03Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modifed per CRL by TSA(MB); prev type Comm for ISO reliability, prev desc Con ED switch to restore work.
08-Jan-2008 10:28:05Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:29:13Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modified per CRL by TSA(MB); Prev type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:31:28Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 12:00 FOR Record modifed per CRL by TSA(MB); Prev type Comm for ISO Reliability, prev desc Con Ed switch to restore work.
08-Jan-2008 10:32:19Metering Authority - Consolidated Edison of NY UPDATES NARROWS_GT2_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/07/2008 14:00 FOR Record modifed per CRL by TSA(MB); Prev Type Comm for ISO Reliability, Prev desc Con Ed switch to restore work.
08-Jan-2008 10:44:48HQ initiated curtailment cut 32 MWs.
08-Jan-2008 12:51:49ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/08/2008 13:00 FOR UNIT DE-COMMITED INCORRECTLY BY RTC DUE TO RANGER RESTART. OOM TO RESTORE SCHEDULE..
08-Jan-2008 14:35:44ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/08/2008 14:00 FOR 262 P/C FLOWS..
08-Jan-2008 14:39:57ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/08/2008 15:00 FOR UNIT BEING DE-COMMITED BEFORE MIN-RUN TIME MET..
08-Jan-2008 16:39:43HQ initiated curtailment cut 20 MWs.
08-Jan-2008 17:07:00ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/08/2008 17:00 FOR 262 P/C FLOWS..
08-Jan-2008 17:26:28PJM initiated curtailment cut 400 MWs.
08-Jan-2008 20:26:06ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/08/2008 21:00 FOR 262 P/C FLOWS..
08-Jan-2008 20:26:29ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/08/2008 22:00.
08-Jan-2008 20:58:1801/08/2008 20:56:05 NYISO small event reserve pick-up executed.
08-Jan-2008 22:02:15ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/08/2008 22:00 FOR HIGH ACE.
08-Jan-2008 22:09:43ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/08/2008 22:00.

Committed for Reliability

Back to top
Insert TimeMessage
08-Jan-2008 10:52:50Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 00 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:50Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 01 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:50Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 02 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:51Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 03 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:51Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 11 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:51Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 12 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:51Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 10 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:51Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 05 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:51Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 07 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:51Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 08 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:51Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 09 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:51Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 06 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:51Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 04 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:52Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 16 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:52Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 15 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:52Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 14 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:52Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 13 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:52Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 17 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:52Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 18 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:52Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 19 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:52Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:52Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:52Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 20 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:52:53Generator: POLETTI____ scheduled for local reliability in DAM market for 01/09/2008 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:20Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:20Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:20Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:20Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:20Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:20Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:20Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:20Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:22Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:22Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:22Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:22Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:22Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/09/2008 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:35Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 01/09/2008 22 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 10:53:35Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 01/09/2008 23 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 11:00:46Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 01/09/2008 23 Energy = 188 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 11:01:08Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 01/09/2008 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 11:01:21Generator: BARRETT___2 scheduled for local reliability in DAM market for 01/09/2008 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:47Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 00 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:47Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 01 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:47Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 02 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:47Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 03 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:47Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 07 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:47Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 08 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:47Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 06 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:47Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 05 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:47Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 04 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:48Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 09 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:48Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 12 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:48Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 13 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:48Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 15 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:48Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 17 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:48Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 19 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:48Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 18 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:48Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 16 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:48Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 14 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:48Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 10 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:48Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 11 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:49Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 20 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:49Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 21 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:49Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 23 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:03:49Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 01/09/2008 22 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:54Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 00 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:55Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 01 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:55Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 03 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:55Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 02 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:55Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 04 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:55Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 06 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:55Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 05 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:56Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 07 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:56Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 17 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:56Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 16 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:56Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 15 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:56Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 14 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:56Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 13 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:56Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 12 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:56Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 11 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:56Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 08 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:56Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 10 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:56Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 09 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:57Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 18 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:57Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 19 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:57Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 20 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:57Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 22 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:57Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 23 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jan-2008 12:56:57Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/09/2008 21 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
08-Jan-2008 14:43:54Prices in the 07 January 2008 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the 07 January 2008 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the 09 January 2008 Day-Ahead Market are correct.
08-Jan-2008 16:40:18Prices in the 08 January 2008 Real-Time Market for the period hours beginning 00 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the 08 January 2008 Hour-Ahead Market for the period hours beginning 00 through 11 are correct.