Insert Time | Message |
04-Sep-2007 00:10:56 | Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 00:00 FOR 73&74 CONT.. |
04-Sep-2007 00:11:36 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 00:00 FOR 73&74 LINE CONT.. |
04-Sep-2007 00:28:33 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 00:00 FOR 73&74 LINE CONT.. |
04-Sep-2007 01:35:37 | Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 01:00 FOR 73&74 LINE CONT.. |
04-Sep-2007 01:36:24 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 01:00 FOR 73&74 LINE CONT.. |
04-Sep-2007 01:36:45 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 01:00 FOR 73&74 LINE CONT.. |
04-Sep-2007 06:19:47 | Metering Authority - Niagara Mohawk REMOVES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 06:00. |
04-Sep-2007 07:17:53 | Metering Authority - Niagara Mohawk REMOVES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 07:00. |
04-Sep-2007 08:26:55 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 08:00 FOR EAST END LOAD.. |
04-Sep-2007 11:35:33 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 11:00 FOR EAST END LOAD.. |
04-Sep-2007 11:48:32 | Metering Authority - Long Island Power Authority UPDATES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/01/2007 00:00 FOR Original modified by TSA per crl, prev code Gen Derate, prev desc. no longer OOM. |
04-Sep-2007 11:50:22 | Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/01/2007 02:00 FOR Original record modified by TSA (MB), prev code Gen Derate, prev desc. no longer OOM Unit taken offline. |
04-Sep-2007 11:58:07 | 09/04/2007 11:55:16 NYISO large event reserve pick-up executed. |
04-Sep-2007 12:03:43 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 12:00 FOR LOSS OF BANK 6 ON 69KV @ VALLEY STREAM. UNIT PICKED UP BY RTC FOR 12:30 - LI ELECTING TO END OOM @ 1300 AS UNIT IS ECONOMICALLY COMMITED.. |
04-Sep-2007 13:02:58 | 09/04/2007 13:01:28 NYISO large event reserve pick-up executed. |
04-Sep-2007 13:05:37 | 09/04/2007 13:04:42 NYISO large event reserve pick-up executed. |
04-Sep-2007 13:07:31 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/04/2007 13:00 FOR . |
04-Sep-2007 13:07:56 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/04/2007 13:00. |
04-Sep-2007 13:13:46 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 13:00 FOR EAST END LOAD.. |
04-Sep-2007 13:15:30 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 13:00. |
04-Sep-2007 13:24:00 | Metering Authority - Long Island Power Authority UPDATES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/02/2007 14:00 FOR Original record modified by TSA (MB), prev code Gen Derate, prev desc. Unit tripped. |
04-Sep-2007 13:25:27 | Metering Authority - Long Island Power Authority UPDATES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/02/2007 19:00 FOR Original record modified by TSA (MB), prev code Gen Derate, prev desc Tripped. |
04-Sep-2007 13:26:47 | PJM initiated curtailment cut 704 MWs. ieso tlr on 9159 |
04-Sep-2007 13:27:51 | Metering Authority - Long Island Power Authority UPDATES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/02/2007 20:00 FOR Original record modified by TSA (MB), prev code Gen Derate, prev desc Tripped. |
04-Sep-2007 15:13:44 | 09/04/2007 15:12:56 NYISO large event reserve pick-up executed. |
04-Sep-2007 15:18:37 | ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/04/2007 15:00 FOR STRAIGHTLINED FOR RPU.. |
04-Sep-2007 15:18:41 | 09/04/2007 15:17:56 NYISO large event reserve pick-up executed. |
04-Sep-2007 15:24:45 | ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/04/2007 16:00 FOR STRAIGHTLINED FOR RPU.. |
04-Sep-2007 15:46:02 | ISO REQUESTS NORTHPORT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/04/2007 15:00 FOR UNIT SMOKING - BLOCKED TO NOT MOVE DOWN PER LI REQUEST FOR UNIT INSPECTION AND INVESTIGATION / REPAIR.. |
04-Sep-2007 19:38:00 | Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 20:00. |
04-Sep-2007 21:32:19 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/04/2007 21:00. |
04-Sep-2007 21:36:50 | NYISO Locational based curtailment cut 2 MWs. |
04-Sep-2007 22:53:53 | ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/04/2007 22:00 FOR Post contingency loss of 461 onto 262. |
04-Sep-2007 23:09:48 | NYISO Locational based curtailment cut 825 MWs. dc poles 1 and 2 tripped |
04-Sep-2007 23:15:56 | NYISO Locational based curtailment cut 1075 MWs. dc poles 1 and 2 tripped |
04-Sep-2007 23:16:33 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/04/2007 23:00 FOR Overgen. |
04-Sep-2007 23:32:04 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/04/2007 23:00. |
Insert Time | Message |
04-Sep-2007 03:04:47 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 05 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:48 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 06 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:48 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 11 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:48 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 13 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:48 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 15 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:48 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 14 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:48 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 12 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:48 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 10 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:48 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 07 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:48 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 09 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:48 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 08 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:49 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 16 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:49 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:49 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:49 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 18 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:49 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 19 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:49 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:49 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 20 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:04:49 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/04/2007 17 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:01 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:01 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:01 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:01 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:01 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:01 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:01 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:01 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:01 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:01 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:02 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:02 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:02 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:02 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:02 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:02 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:02 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 03:18:02 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/04/2007 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:38 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:39 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:39 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:39 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:39 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:39 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:39 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:39 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:39 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:40 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:40 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:40 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:40 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:40 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:40 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:40 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:40 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:40 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:40 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:46:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/05/2007 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:00 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 00 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:00 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 01 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:00 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 02 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:00 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 03 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:00 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 04 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:01 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 05 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:01 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 16 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:01 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 15 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:01 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 14 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:01 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 13 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:01 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 12 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:01 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 11 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:01 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 10 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:01 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 09 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:01 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 08 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:01 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 06 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:01 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 07 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:02 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 17 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:02 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 18 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:02 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 19 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:02 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 20 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:02 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:02 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:02 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/05/2007 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:17 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:17 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:18 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:18 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:18 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:18 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:18 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:18 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:18 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:18 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:18 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:18 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:18 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:18 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:19 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:19 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:19 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:19 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:19 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:19 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:19 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:19 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:19 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 10:47:19 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 09/05/2007 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 11:03:10 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/05/2007 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 11:03:23 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/05/2007 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 11:03:23 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/05/2007 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 11:03:36 | Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 09/05/2007 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 11:03:48 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 09/05/2007 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 11:04:05 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 09/05/2007 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 11:04:18 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 09/05/2007 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:39 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 07 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:40 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:40 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 16 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:40 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 15 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:40 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 14 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:40 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 13 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:40 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 12 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:40 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 11 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:40 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:40 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:41 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 17 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:41 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 18 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:41 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 21 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:41 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 20 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 13:47:41 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 09/05/2007 19 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 16:09:46 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/05/2007 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 16:09:47 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/05/2007 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 16:09:47 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/05/2007 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 16:09:47 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/05/2007 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 16:09:47 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/05/2007 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 16:09:47 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/05/2007 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 16:09:47 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/05/2007 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 16:09:47 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/05/2007 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 16:09:47 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/05/2007 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Sep-2007 16:26:45 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 09/05/2007 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |