P-2503-Aug-2007

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
03-Aug-2007 00:02:08DUNKIRK___2 NO LONGER COMMITED FOR ISO RELIABILITY AFTER 08/02/2007 23:59.
03-Aug-2007 00:02:08DUNKIRK___1 NO LONGER COMMITED FOR ISO RELIABILITY AFTER 08/02/2007 23:59.
03-Aug-2007 00:11:09ISO REQUESTS DUNKIRK___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR Cascading case onto 141 line.
03-Aug-2007 00:11:51ISO REQUESTS DUNKIRK___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR Cascade case loss of 73/74 and 142 onto 141.
03-Aug-2007 00:29:07ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR LI Security.
03-Aug-2007 00:29:33ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR LI Security.
03-Aug-2007 00:30:24NYISO Locational based curtailment cut 1000 MWs.
03-Aug-2007 00:31:46Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 00:00.
03-Aug-2007 00:40:03ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR LI Security.
03-Aug-2007 00:40:21ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR LI Security.
03-Aug-2007 00:42:25ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR LI Security.
03-Aug-2007 00:43:07ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR LI Security.
03-Aug-2007 01:24:44NYISO Locational based curtailment cut 700 MWs.
03-Aug-2007 01:37:18NYISO Locational based curtailment cut 300 MWs.
03-Aug-2007 02:12:15ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 02:00 FOR INCREASE 300MW FOR BOWLINE TRIP..
03-Aug-2007 02:12:34ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 02:00.
03-Aug-2007 02:18:0308/03/2007 02:16:41 NYISO large event reserve pick-up executed.
03-Aug-2007 02:23:1108/03/2007 02:22:23 NYISO large event reserve pick-up executed.
03-Aug-2007 02:24:39NYISO Locational based curtailment cut 700 MWs.
03-Aug-2007 03:28:00NYISO Locational based curtailment cut 700 MWs.
03-Aug-2007 04:29:58NYISO Locational based curtailment cut 700 MWs.
03-Aug-2007 04:36:4708/03/2007 04:33:57 NYISO large event reserve pick-up executed.
03-Aug-2007 04:39:4308/03/2007 04:39:03 NYISO large event reserve pick-up executed.
03-Aug-2007 05:34:01NYISO Locational based curtailment cut 700 MWs.
03-Aug-2007 06:30:27Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 06:00 FOR E.RIVER LOAD POCKET..
03-Aug-2007 07:28:49Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 07:00 FOR E.RIVER LOAD POCKET..
03-Aug-2007 07:30:51ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 07:00.
03-Aug-2007 07:31:00ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 07:00.
03-Aug-2007 08:01:02Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 08:00 FOR EAST END LOAD.
03-Aug-2007 08:01:34Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 08:00 FOR EAST END LOAD.
03-Aug-2007 08:17:20Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 08:00 FOR EAST END LOAD.
03-Aug-2007 08:28:48Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 08:00 FOR EAST RIVER LOAD POCKET.
03-Aug-2007 08:55:01ISO UPDATES DUNKIRK___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 08:00 FOR Cascade case loss of 73/74 and 142 onto 141.
03-Aug-2007 08:55:31Metering Authority - Long Island Power Authority REQUESTS SOUTHOLD___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 08:00 FOR EAST END LOADS.
03-Aug-2007 09:13:50Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 09:00 FOR E.RIVER LOAD POCKET..
03-Aug-2007 09:42:06Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 09:00 FOR TVR.
03-Aug-2007 09:47:49Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 09:00 FOR .
03-Aug-2007 09:48:31Metering Authority - Long Island Power Authority UPDATES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 09:00 FOR TVR.
03-Aug-2007 09:48:54Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 09:00 FOR TVR.
03-Aug-2007 10:01:55Metering Authority - Long Island Power Authority UPDATES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 10:00 FOR EAST END LOADS.
03-Aug-2007 10:02:32Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 10:00 FOR EAST END LOADS.
03-Aug-2007 10:06:55Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 10:00 FOR EAST END LOADS.
03-Aug-2007 10:17:20ISO REQUESTS HUNTLEY___68 OUT OF MERIT. ISO VOLTAGE SUPPORT AT START TIME 08/03/2007 10:00 FOR ISO VOLTAGE SUPPORT.
03-Aug-2007 10:17:40ISO REQUESTS HUNTLEY___67 OUT OF MERIT. ISO VOLTAGE SUPPORT AT START TIME 08/03/2007 10:00 FOR ISO VOLTAGE SUPPORT.
03-Aug-2007 10:18:57Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 10:00 FOR E.RIVER LOAD POCKET..
03-Aug-2007 10:21:27Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 10:00 FOR TVR.
03-Aug-2007 10:34:43Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 10:00 FOR TVR.
03-Aug-2007 11:06:06Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR.
03-Aug-2007 11:06:08Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR.
03-Aug-2007 11:06:10Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR.
03-Aug-2007 11:06:11Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR.
03-Aug-2007 11:06:13Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR.
03-Aug-2007 11:12:57Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR.
03-Aug-2007 11:22:01ISO UPDATES GOUDEY___8 OUT OF MERIT. ISO VOLTAGE SUPPORT AT START TIME 08/03/2007 11:00 FOR ISO VOLTAGE SUPPORT.
03-Aug-2007 11:24:28Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR EAST RIVER LOAD POCKET.
03-Aug-2007 11:41:17Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR.
03-Aug-2007 12:02:29Metering Authority - Long Island Power Authority UPDATES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 12:00 FOR EAST END LOAD.
03-Aug-2007 12:10:31Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 12:00 FOR EAST RIVER LOAD POCKET.
03-Aug-2007 12:11:50ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 12:00 FOR Cascade case loss of 73/74 and 142 onto 141.
03-Aug-2007 12:12:04ISO UPDATES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 12:00 FOR Cascade case loss of 73/74 and 142 onto 141.
03-Aug-2007 12:46:29ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 12:00 FOR ACE.
03-Aug-2007 13:22:22Metering Authority - Long Island Power Authority UPDATES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/02/2007 15:00 FOR Modified existing OOM to TO Local, prev type Gen Derate, prev entry tripped attempting to restart - per dispatcher logs , OOM entry TSA (MJB).
03-Aug-2007 13:40:52Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 13:00 FOR TVR.
03-Aug-2007 13:41:23Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 13:00 FOR TVR.
03-Aug-2007 14:03:20Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 14:00 FOR TVR.
03-Aug-2007 14:35:57ISO REMOVES DUNKIRK___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 14:00.
03-Aug-2007 14:36:07ISO REMOVES DUNKIRK___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 14:00.
03-Aug-2007 15:02:47Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 15:00 FOR EAST RIVER LOAD POCKET MIN, 120 OPACITY LIMIT UOLE.
03-Aug-2007 16:13:35ISO REMOVES GOUDEY___8 OUT OF MERIT. ISO VOLTAGE SUPPORT AT START TIME 08/03/2007 16:00.
03-Aug-2007 16:15:45ISO REMOVES HUNTLEY___67 OUT OF MERIT. ISO VOLTAGE SUPPORT AT START TIME 08/03/2007 16:00.
03-Aug-2007 16:15:54ISO REMOVES HUNTLEY___68 OUT OF MERIT. ISO VOLTAGE SUPPORT AT START TIME 08/03/2007 16:00.
03-Aug-2007 17:12:06ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 17:00 FOR Cascade case loss of 73/74 and 142 onto 141.
03-Aug-2007 17:12:19ISO UPDATES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 17:00 FOR Cascade case loss of 73/74 and 142 onto 141.
03-Aug-2007 17:14:05NYISO Locational based curtailment cut 300 MWs.
03-Aug-2007 18:00:31Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 18:00.
03-Aug-2007 18:31:54Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 18:00.
03-Aug-2007 19:31:51Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 19:00.
03-Aug-2007 19:57:27Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 19:00.
03-Aug-2007 19:57:40Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 19:00.
03-Aug-2007 19:57:58Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 19:00.
03-Aug-2007 19:58:08Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 19:00.
03-Aug-2007 20:00:56Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 20:00.
03-Aug-2007 20:01:05Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 20:00.
03-Aug-2007 21:59:44ISO REQUESTS DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2007 00:00 FOR Cascade case loss of 73/74 and 142 onto 141.
03-Aug-2007 21:59:44ISO REQUESTS DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2007 00:00 FOR Cascade case loss of 73/74 and 142 onto 141.
03-Aug-2007 21:59:52Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2007 00:00 FOR EAST RIVER LOAD POCKET MIN, 120 OPACITY LIMIT UOLE.
03-Aug-2007 21:59:55Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2007 00:00 FOR E.RIVER LOAD POCKET..
03-Aug-2007 21:59:58Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2007 00:00 FOR EAST END LOAD.
03-Aug-2007 22:11:32Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00.
03-Aug-2007 22:11:40Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00.
03-Aug-2007 22:30:34Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00 FOR East end load.
03-Aug-2007 22:35:27Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00 FOR East end load.
03-Aug-2007 22:39:34Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00.
03-Aug-2007 22:39:48Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00.
03-Aug-2007 22:46:23ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 22:00 FOR 262 over normal & post cont over LTE.
03-Aug-2007 22:46:41Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00.
03-Aug-2007 22:51:45Metering Authority - Long Island Power Authority UPDATES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00 FOR East end load.
03-Aug-2007 22:58:46ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 22:00 FOR 262 over normal & post cont over LTE.
03-Aug-2007 22:59:18ISO REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 22:00 FOR 262 over normal & post cont over LTE.
03-Aug-2007 22:59:29ISO REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2007 00:00 FOR 262 over normal & post cont over LTE.
03-Aug-2007 22:59:45ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2007 00:00 FOR 262 over normal & post cont over LTE.
03-Aug-2007 23:00:18Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 23:00.
03-Aug-2007 23:23:53Metering Authority - Long Island Power Authority REMOVES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 23:00.
03-Aug-2007 23:29:39Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2007 00:00 FOR East end load.

Committed for Reliability

Back to top
Insert TimeMessage
03-Aug-2007 10:59:35Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/04/2007 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 10:59:35Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/04/2007 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 10:59:35Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/04/2007 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 10:59:35Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/04/2007 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 10:59:59Generator: ASTORIA___4 scheduled for local reliability in DAM market for 08/04/2007 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 10:59:59Generator: ASTORIA___4 scheduled for local reliability in DAM market for 08/04/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 10:59:59Generator: ASTORIA___4 scheduled for local reliability in DAM market for 08/04/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 11:00:20Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 08/04/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 11:17:33Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 08/04/2007 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 11:18:04Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/04/2007 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 11:18:36Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 08/04/2007 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:20Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/03/2007 22 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:21Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/03/2007 23 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:21Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 02 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:21Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 00 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:21Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 01 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:21Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 03 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:21Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 05 Energy = 55 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:21Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 08 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:21Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 07 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:21Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 06 Energy = 55 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:21Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 04 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:22Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 15 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:22Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 09 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:22Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 11 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:22Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 13 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:22Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 14 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:22Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 12 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:22Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 10 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:22Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 16 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:22Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 17 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:22Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 19 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-Aug-2007 16:41:22Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 18 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
03-Aug-2007 16:28:43Prices in the 02 August 2007 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the 02 August 2007 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the 04 August 2007 Day-Ahead Market are correct.
03-Aug-2007 16:30:46Prices in the 03 August 2007 Real-Time Market for the period hours beginning 00 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the 03 August 2007 Hour-Ahead Market for the period hours beginning 00 through 11 are correct.