Insert Time | Message |
12-Aug-2007 00:11:32 | Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 00:00. |
12-Aug-2007 00:11:43 | ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 00:00 FOR GARDENVILLE TWR. |
12-Aug-2007 00:11:55 | ISO UPDATES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 00:00 FOR GARDENVILLE TWR. |
12-Aug-2007 00:49:44 | ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 00:00 FOR GARDENVILLE TWR. |
12-Aug-2007 00:49:56 | ISO UPDATES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 00:00 FOR GARDENVILLE TWR. |
12-Aug-2007 02:01:03 | ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 02:00 FOR GARDENVILLE TWR. |
12-Aug-2007 06:53:00 | ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 06:00 FOR GARDENVILLE TWR. |
12-Aug-2007 06:53:11 | ISO UPDATES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 06:00 FOR GARDENVILLE TWR. |
12-Aug-2007 08:13:13 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 08:00 FOR East End Load. |
12-Aug-2007 08:22:29 | Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 08:00 FOR East End Load. |
12-Aug-2007 09:07:08 | Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 09:00 FOR East End Load. |
12-Aug-2007 09:20:24 | ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 09:00 FOR 262 OVER P/C FOR LOSS OF 461 AND BK 6 OR 8.. |
12-Aug-2007 09:21:23 | ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 09:00 FOR GARDENVILLE TWR. |
12-Aug-2007 09:21:32 | ISO UPDATES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 09:00 FOR GARDENVILLE TWR. |
12-Aug-2007 09:22:20 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 09:00 FOR EAST END LOAD.. |
12-Aug-2007 09:43:23 | ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 09:00 FOR GARDENVILLE TWR. |
12-Aug-2007 09:43:36 | ISO UPDATES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 09:00 FOR GARDENVILLE TWR. |
12-Aug-2007 10:06:23 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 10:00 FOR 262 OVER P/C FOR LOSS OF 461 AND BK 6 OR 8.. |
12-Aug-2007 10:20:52 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 10:00 FOR EAST END LOAD.. |
12-Aug-2007 10:59:21 | Metering Authority - Long Island Power Authority REQUESTS SOUTHOLD___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 10:00 FOR EAST END LOAD.. |
12-Aug-2007 10:59:51 | Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 10:00 FOR EAST END LOAD.. |
12-Aug-2007 11:16:24 | Metering Authority - Long Island Power Authority UPDATES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 11:00 FOR EAST END LOAD.. |
12-Aug-2007 11:27:45 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 11:00 FOR 262 OVER P/C FOR LOSS OF 461 AND BK 6 OR 8.. |
12-Aug-2007 12:02:54 | Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 12:00 FOR EAST END LOAD.. |
12-Aug-2007 12:05:02 | Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 12:00 FOR EAST END LOAD.. |
12-Aug-2007 12:45:02 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 12:00 FOR OOM FOR CON EDISON LOCAL SECURITY - EAST RIVER LOAD POCKET.. |
12-Aug-2007 12:57:22 | Metering Authority - Long Island Power Authority UPDATES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 12:00 FOR EAST END LOAD.. |
12-Aug-2007 13:17:24 | ISO REMOVES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 13:00. |
12-Aug-2007 13:17:31 | ISO REMOVES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 13:00. |
12-Aug-2007 14:40:37 | ISO REQUESTS RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 16:00 FOR UNIT BID NOT COMING ACROSS TO RTC FROM MIS FOR 1600 - BUT UNIT IS BID ACCORDINGLY TO BE ONLINE.. |
12-Aug-2007 19:53:11 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 19:00. |
12-Aug-2007 20:57:21 | Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 20:00. |
12-Aug-2007 21:51:45 | Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 21:00. |
12-Aug-2007 22:06:22 | ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/12/2007 22:00. |
12-Aug-2007 22:16:23 | Metering Authority - Long Island Power Authority UPDATES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 22:00 FOR EAST END LOAD. - Shutting down. |
12-Aug-2007 22:38:08 | Metering Authority - Long Island Power Authority REMOVES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 22:00. |
12-Aug-2007 22:40:20 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/13/2007 00:00 FOR East End Load. |
12-Aug-2007 22:45:02 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/13/2007 00:00 FOR OOM FOR CON EDISON LOCAL SECURITY - EAST RIVER LOAD POCKET.. |
12-Aug-2007 23:01:02 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/12/2007 23:00. |
Insert Time | Message |
12-Aug-2007 11:28:40 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 08/13/2007 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:28:40 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 08/13/2007 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:25 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:25 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:25 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:25 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:25 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:25 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:25 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:26 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:26 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:26 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:26 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:26 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:26 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:26 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:26 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:26 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:26 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:26 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:27 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:27 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:27 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:27 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:27 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:27 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 08/13/2007 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:53 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 08/13/2007 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:53 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 08/13/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:53 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 08/13/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:30:53 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 08/13/2007 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:31:09 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/13/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
12-Aug-2007 11:31:09 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/13/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |