Insert Time | Message |
03-Aug-2007 00:02:08 | DUNKIRK___2 NO LONGER COMMITED FOR ISO RELIABILITY AFTER 08/02/2007 23:59. |
03-Aug-2007 00:02:08 | DUNKIRK___1 NO LONGER COMMITED FOR ISO RELIABILITY AFTER 08/02/2007 23:59. |
03-Aug-2007 00:11:09 | ISO REQUESTS DUNKIRK___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR Cascading case onto 141 line. |
03-Aug-2007 00:11:51 | ISO REQUESTS DUNKIRK___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR Cascade case loss of 73/74 and 142 onto 141. |
03-Aug-2007 00:29:07 | ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR LI Security. |
03-Aug-2007 00:29:33 | ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR LI Security. |
03-Aug-2007 00:30:24 | NYISO Locational based curtailment cut 1000 MWs. |
03-Aug-2007 00:31:46 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 00:00. |
03-Aug-2007 00:40:03 | ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR LI Security. |
03-Aug-2007 00:40:21 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR LI Security. |
03-Aug-2007 00:42:25 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR LI Security. |
03-Aug-2007 00:43:07 | ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 00:00 FOR LI Security. |
03-Aug-2007 01:24:44 | NYISO Locational based curtailment cut 700 MWs. |
03-Aug-2007 01:37:18 | NYISO Locational based curtailment cut 300 MWs. |
03-Aug-2007 02:12:15 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 02:00 FOR INCREASE 300MW FOR BOWLINE TRIP.. |
03-Aug-2007 02:12:34 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 02:00. |
03-Aug-2007 02:18:03 | 08/03/2007 02:16:41 NYISO large event reserve pick-up executed. |
03-Aug-2007 02:23:11 | 08/03/2007 02:22:23 NYISO large event reserve pick-up executed. |
03-Aug-2007 02:24:39 | NYISO Locational based curtailment cut 700 MWs. |
03-Aug-2007 03:28:00 | NYISO Locational based curtailment cut 700 MWs. |
03-Aug-2007 04:29:58 | NYISO Locational based curtailment cut 700 MWs. |
03-Aug-2007 04:36:47 | 08/03/2007 04:33:57 NYISO large event reserve pick-up executed. |
03-Aug-2007 04:39:43 | 08/03/2007 04:39:03 NYISO large event reserve pick-up executed. |
03-Aug-2007 05:34:01 | NYISO Locational based curtailment cut 700 MWs. |
03-Aug-2007 06:30:27 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 06:00 FOR E.RIVER LOAD POCKET.. |
03-Aug-2007 07:28:49 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 07:00 FOR E.RIVER LOAD POCKET.. |
03-Aug-2007 07:30:51 | ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 07:00. |
03-Aug-2007 07:31:00 | ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 07:00. |
03-Aug-2007 08:01:02 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 08:00 FOR EAST END LOAD. |
03-Aug-2007 08:01:34 | Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 08:00 FOR EAST END LOAD. |
03-Aug-2007 08:17:20 | Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 08:00 FOR EAST END LOAD. |
03-Aug-2007 08:28:48 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 08:00 FOR EAST RIVER LOAD POCKET. |
03-Aug-2007 08:55:01 | ISO UPDATES DUNKIRK___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 08:00 FOR Cascade case loss of 73/74 and 142 onto 141. |
03-Aug-2007 08:55:31 | Metering Authority - Long Island Power Authority REQUESTS SOUTHOLD___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 08:00 FOR EAST END LOADS. |
03-Aug-2007 09:13:50 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 09:00 FOR E.RIVER LOAD POCKET.. |
03-Aug-2007 09:42:06 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 09:00 FOR TVR. |
03-Aug-2007 09:47:49 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 09:00 FOR . |
03-Aug-2007 09:48:31 | Metering Authority - Long Island Power Authority UPDATES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 09:00 FOR TVR. |
03-Aug-2007 09:48:54 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 09:00 FOR TVR. |
03-Aug-2007 10:01:55 | Metering Authority - Long Island Power Authority UPDATES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 10:00 FOR EAST END LOADS. |
03-Aug-2007 10:02:32 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 10:00 FOR EAST END LOADS. |
03-Aug-2007 10:06:55 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 10:00 FOR EAST END LOADS. |
03-Aug-2007 10:17:20 | ISO REQUESTS HUNTLEY___68 OUT OF MERIT. ISO VOLTAGE SUPPORT AT START TIME 08/03/2007 10:00 FOR ISO VOLTAGE SUPPORT. |
03-Aug-2007 10:17:40 | ISO REQUESTS HUNTLEY___67 OUT OF MERIT. ISO VOLTAGE SUPPORT AT START TIME 08/03/2007 10:00 FOR ISO VOLTAGE SUPPORT. |
03-Aug-2007 10:18:57 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 10:00 FOR E.RIVER LOAD POCKET.. |
03-Aug-2007 10:21:27 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 10:00 FOR TVR. |
03-Aug-2007 10:34:43 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 10:00 FOR TVR. |
03-Aug-2007 11:06:06 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR. |
03-Aug-2007 11:06:08 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR. |
03-Aug-2007 11:06:10 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR. |
03-Aug-2007 11:06:11 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR. |
03-Aug-2007 11:06:13 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR. |
03-Aug-2007 11:12:57 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR. |
03-Aug-2007 11:22:01 | ISO UPDATES GOUDEY___8 OUT OF MERIT. ISO VOLTAGE SUPPORT AT START TIME 08/03/2007 11:00 FOR ISO VOLTAGE SUPPORT. |
03-Aug-2007 11:24:28 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR EAST RIVER LOAD POCKET. |
03-Aug-2007 11:41:17 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 11:00 FOR TVR. |
03-Aug-2007 12:02:29 | Metering Authority - Long Island Power Authority UPDATES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 12:00 FOR EAST END LOAD. |
03-Aug-2007 12:10:31 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 12:00 FOR EAST RIVER LOAD POCKET. |
03-Aug-2007 12:11:50 | ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 12:00 FOR Cascade case loss of 73/74 and 142 onto 141. |
03-Aug-2007 12:12:04 | ISO UPDATES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 12:00 FOR Cascade case loss of 73/74 and 142 onto 141. |
03-Aug-2007 12:46:29 | ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 12:00 FOR ACE. |
03-Aug-2007 13:22:22 | Metering Authority - Long Island Power Authority UPDATES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/02/2007 15:00 FOR Modified existing OOM to TO Local, prev type Gen Derate, prev entry tripped attempting to restart - per dispatcher logs , OOM entry TSA (MJB). |
03-Aug-2007 13:40:52 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 13:00 FOR TVR. |
03-Aug-2007 13:41:23 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 13:00 FOR TVR. |
03-Aug-2007 14:03:20 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 14:00 FOR TVR. |
03-Aug-2007 14:35:57 | ISO REMOVES DUNKIRK___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 14:00. |
03-Aug-2007 14:36:07 | ISO REMOVES DUNKIRK___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 14:00. |
03-Aug-2007 15:02:47 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 15:00 FOR EAST RIVER LOAD POCKET MIN, 120 OPACITY LIMIT UOLE. |
03-Aug-2007 16:13:35 | ISO REMOVES GOUDEY___8 OUT OF MERIT. ISO VOLTAGE SUPPORT AT START TIME 08/03/2007 16:00. |
03-Aug-2007 16:15:45 | ISO REMOVES HUNTLEY___67 OUT OF MERIT. ISO VOLTAGE SUPPORT AT START TIME 08/03/2007 16:00. |
03-Aug-2007 16:15:54 | ISO REMOVES HUNTLEY___68 OUT OF MERIT. ISO VOLTAGE SUPPORT AT START TIME 08/03/2007 16:00. |
03-Aug-2007 17:12:06 | ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 17:00 FOR Cascade case loss of 73/74 and 142 onto 141. |
03-Aug-2007 17:12:19 | ISO UPDATES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 17:00 FOR Cascade case loss of 73/74 and 142 onto 141. |
03-Aug-2007 17:14:05 | NYISO Locational based curtailment cut 300 MWs. |
03-Aug-2007 18:00:31 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 18:00. |
03-Aug-2007 18:31:54 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 18:00. |
03-Aug-2007 19:31:51 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 19:00. |
03-Aug-2007 19:57:27 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 19:00. |
03-Aug-2007 19:57:40 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 19:00. |
03-Aug-2007 19:57:58 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 19:00. |
03-Aug-2007 19:58:08 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 19:00. |
03-Aug-2007 20:00:56 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 20:00. |
03-Aug-2007 20:01:05 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 20:00. |
03-Aug-2007 21:59:44 | ISO REQUESTS DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2007 00:00 FOR Cascade case loss of 73/74 and 142 onto 141. |
03-Aug-2007 21:59:44 | ISO REQUESTS DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2007 00:00 FOR Cascade case loss of 73/74 and 142 onto 141. |
03-Aug-2007 21:59:52 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2007 00:00 FOR EAST RIVER LOAD POCKET MIN, 120 OPACITY LIMIT UOLE. |
03-Aug-2007 21:59:55 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2007 00:00 FOR E.RIVER LOAD POCKET.. |
03-Aug-2007 21:59:58 | Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2007 00:00 FOR EAST END LOAD. |
03-Aug-2007 22:11:32 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00. |
03-Aug-2007 22:11:40 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00. |
03-Aug-2007 22:30:34 | Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00 FOR East end load. |
03-Aug-2007 22:35:27 | Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00 FOR East end load. |
03-Aug-2007 22:39:34 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00. |
03-Aug-2007 22:39:48 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00. |
03-Aug-2007 22:46:23 | ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 22:00 FOR 262 over normal & post cont over LTE. |
03-Aug-2007 22:46:41 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00. |
03-Aug-2007 22:51:45 | Metering Authority - Long Island Power Authority UPDATES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 22:00 FOR East end load. |
03-Aug-2007 22:58:46 | ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 22:00 FOR 262 over normal & post cont over LTE. |
03-Aug-2007 22:59:18 | ISO REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/03/2007 22:00 FOR 262 over normal & post cont over LTE. |
03-Aug-2007 22:59:29 | ISO REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2007 00:00 FOR 262 over normal & post cont over LTE. |
03-Aug-2007 22:59:45 | ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2007 00:00 FOR 262 over normal & post cont over LTE. |
03-Aug-2007 23:00:18 | Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 23:00. |
03-Aug-2007 23:23:53 | Metering Authority - Long Island Power Authority REMOVES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/03/2007 23:00. |
03-Aug-2007 23:29:39 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2007 00:00 FOR East end load. |
Insert Time | Message |
03-Aug-2007 10:59:35 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/04/2007 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 10:59:35 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/04/2007 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 10:59:35 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/04/2007 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 10:59:35 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/04/2007 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 10:59:59 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 08/04/2007 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 10:59:59 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 08/04/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 10:59:59 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 08/04/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 11:00:20 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 08/04/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 11:17:33 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 08/04/2007 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 11:18:04 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/04/2007 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 11:18:36 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 08/04/2007 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:20 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/03/2007 22 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:21 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/03/2007 23 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:21 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 02 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:21 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 00 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:21 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 01 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:21 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 03 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:21 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 05 Energy = 55 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:21 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 08 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:21 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 07 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:21 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 06 Energy = 55 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:21 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 04 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 15 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 09 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 11 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 13 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 14 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 12 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 10 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 16 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 17 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 19 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-Aug-2007 16:41:22 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/04/2007 18 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |