03-May-2007 00:02:11KEDC PORT_JEFF_GT3 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 05/02/2007 23:59.
03-May-2007 00:02:11PORT_JEFF_4 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 05/02/2007 23:59.
03-May-2007 00:02:11KEDC PORT_JEFF_GT2 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 05/02/2007 23:59.
03-May-2007 00:42:37Metering Authority - Consolidated Edison of NY REQUESTS ARTHUR_KILL_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 01:00 FOR BREAKER 3 FRESHKILLS OUTAGE.
03-May-2007 03:13:15Metering Authority - Consolidated Edison of NY REMOVES ARTHUR_KILL_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 03:00.
03-May-2007 05:48:12ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 05:00 FOR DUE TO NIAGARA INCREASING FOR JUMPER AT FALLS.
03-May-2007 05:48:41ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 05:00 FOR DUE TO NIAGARA INCREASING FOR JUMPER AT FALLS.
03-May-2007 05:56:10Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 05:00 FOR 69KV CONTINGENCY.
03-May-2007 06:02:15ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 06:00.
03-May-2007 06:17:49Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 06:00 FOR 69KV CONTINGENCY.
03-May-2007 06:21:49ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 07:00.
03-May-2007 06:23:33ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 07:00.
03-May-2007 06:24:34ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 07:00.
03-May-2007 06:26:56ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 07:00 FOR DUE TO NIAGARA INCREASING FOR JUMPER AT FALLS.
03-May-2007 06:43:21ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 07:00.
03-May-2007 07:24:02ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 07:00.
03-May-2007 08:01:40Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 08:00 FOR 69KV CONTINGENCIES.
03-May-2007 08:02:13Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 08:00 FOR 69KV CONTINGENCIES.
03-May-2007 08:12:57Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 08:00 FOR L/O BK6 AT VALLEY STREAM ON 69KV..
03-May-2007 09:54:59Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 09:00 FOR 69KV CONTINGENCIES.
03-May-2007 10:00:13Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 10:00 FOR 69KV CONTINGENCIES.
03-May-2007 11:20:11NYISO Locational based curtailment cut 300 MWs.
03-May-2007 16:17:41Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 16:00 FOR 69KV CONTINGENCY.
03-May-2007 18:46:26Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 18:00 FOR 69KV CONTINGENCIES.
03-May-2007 19:35:24Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 19:00 FOR 69KV CONTINGENCIES.
03-May-2007 21:01:25Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 21:00 FOR STEAM SYSTEM SECURITY.
03-May-2007 21:07:46Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 21:00 FOR STEAM SYSTEM SECURITY.
03-May-2007 21:19:34Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR STEAM SYSTEM SECURITY.
03-May-2007 21:33:57Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR L/O BK6 AT VALLEY STREAM ON 69KV..
03-May-2007 21:33:59Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR 69KV CONTINGENCIES.
03-May-2007 21:34:02Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR 69KV CONTINGENCIES.
03-May-2007 21:34:05Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR 69KV CONTINGENCIES.
03-May-2007 21:34:07Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR 69KV CONTINGENCIES.
03-May-2007 21:34:10Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR 69KV CONTINGENCIES.
03-May-2007 21:34:16Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR 69KV CONTINGENCY.

Committed for Reliability

Back to top
Insert TimeMessage
03-May-2007 11:29:46Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 05/04/2007 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:30:41Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 16 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:30:41Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 17 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:30:42Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 18 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:30:42Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 19 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:30:42Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:30:42Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:30:42Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:30:42Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:31:45Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 05/04/2007 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:35:26Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 05/04/2007 23 Energy = 190 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:17Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:18Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:18Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:18Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:18Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:18Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:18Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:18Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:18Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:18Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:19Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:19Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:19Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:19Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:19Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:19Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:19Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:19Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:19Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:19Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:19Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:20Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:20Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
03-May-2007 11:37:20Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
03-May-2007 15:01:28Prices in the May 2, 2007 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the May 2, 2007 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the May 4, 2007 Day-Ahead Market are correct.
03-May-2007 17:23:09Prices in the May 3, 2007 Real-Time Market for the period hours beginning 00 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the May 3, 2007 Hour-Ahead Market for the period hours beginning 00 through 11 are correct.