Insert Time | Message |
07-May-2007 00:22:29 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 00:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 01:03:41 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 01:00 FOR steam security. |
07-May-2007 05:07:59 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 05:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 05:57:18 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 05:00 FOR steam security. |
07-May-2007 06:31:00 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 06:00 FOR steam security. |
07-May-2007 06:32:52 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 06:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 06:51:06 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 06:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 06:51:19 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 06:00 FOR steam security. |
07-May-2007 07:24:37 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 07:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 07:24:53 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 07:00 FOR steam security. |
07-May-2007 08:02:50 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 08:10:54 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 08:11:09 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR steam security. |
07-May-2007 08:11:35 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 08:16:04 | Metering Authority - Long Island Power Authority UPDATES NORTHPORT___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 16:00 FOR Modified existing OOM to accommodate SRE entry (prev code: Gen Derate, prev comments: late coming on)(SM). |
07-May-2007 08:17:51 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 08:18:04 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR steam security. |
07-May-2007 08:39:04 | Metering Authority - Long Island Power Authority UPDATES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/06/2007 00:00 FOR Modified existing OOM to accommodate SRE entry (Prev code: Gen Derate, prev comments: exciter problem)(SM). |
07-May-2007 08:40:48 | Metering Authority - Long Island Power Authority UPDATES NORTHPORT___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/06/2007 00:00 FOR Modified existing OOM to accommodate SRE entry (Prev code: Gen Derate, prev comments: silica)(SM). |
07-May-2007 08:47:55 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 09:40:46 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 09:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 09:41:03 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 09:00 FOR steam security. |
07-May-2007 10:08:26 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 10:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 10:51:38 | ISO UPDATES POLETTI____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 10:00 FOR HIGH LIMIT 570 FOR SINGLE LEG OPERATION W/ Q35M O/S. LOW LIMIT @ 350 PER CON EDISON FOR M51/M52 P/C FLOWS W/ W75 O/S.. |
07-May-2007 10:53:05 | ISO UPDATES POLETTI____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 10:00 FOR HIGH LIMIT 570 FOR SINGLE LEG OPERATION W/ Q35M O/S. LOW LIMIT @ 250 PER CON EDISON FOR M51/M52 P/C FLOWS W/ W75 O/S.. |
07-May-2007 10:55:09 | ISO UPDATES POLETTI____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 10:00 FOR HIGH LIMIT 570 FOR SINGLE LEG OPERATION W/ Q35M O/S. LOW LIMIT @ 250 PER CON EDISON FOR M51/M52 P/C FLOWS W/ W75 O/S.. |
07-May-2007 11:00:50 | ISO UPDATES POLETTI____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 11:00 FOR HIGH LIMIT 570 FOR SINGLE LEG OPERATION W/ Q35M O/S. LOW LIMIT @ 280 PER CON EDISON FOR M51/M52 P/C FLOWS W/ W75 O/S.. |
07-May-2007 11:28:09 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 11:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 11:28:45 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 11:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 14:05:06 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 14:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 14:05:27 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 14:00 FOR steam security. |
07-May-2007 16:17:06 | ISO REQUESTS RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 16:00 FOR CIRCUIT SWITCH TESTING @ VERNON PER CON EDISON.. |
07-May-2007 16:34:45 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 16:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 16:38:03 | ISO UPDATES RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 16:00 FOR CIRCUIT SWITCH TESTING @ VERNON PER CON EDISON.. |
07-May-2007 17:11:55 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 17:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 18:10:24 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 18:00 FOR steam security. |
07-May-2007 18:10:35 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 18:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 18:15:42 | ISO REMOVES RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 18:00. |
07-May-2007 18:31:54 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 18:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 21:47:06 | Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 00:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 21:47:10 | Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 00:00 FOR STEAM SYSTEM SECURITY. |
07-May-2007 21:47:13 | Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 00:00 FOR steam security. |
07-May-2007 21:52:54 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 21:00 FOR . |
07-May-2007 22:29:57 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 22:00. |
Insert Time | Message |
07-May-2007 10:30:15 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/08/2007 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:36 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:36 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:36 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:36 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:36 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:37 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:37 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:37 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:37 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:37 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:37 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:37 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:37 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:37 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:37 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:37 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:37 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:38 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:38 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:38 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:38 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:38 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:38 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:38 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:53 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 00 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:53 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 01 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:53 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 04 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:53 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 05 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:53 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 03 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:53 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 02 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:53 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 06 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:53 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 08 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:53 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 07 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:54 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 09 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:54 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 12 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:54 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 13 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:54 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 11 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:54 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 10 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:54 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 14 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:54 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 16 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:54 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 19 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:54 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 18 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:54 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 17 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:54 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 15 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:55 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:55 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 20 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:55 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 10:30:55 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 13:10:10 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 07 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 13:10:10 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 13:10:10 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 13:10:10 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 12 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 13:10:10 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 11 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 13:10:10 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 13:10:11 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 13 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 13:10:11 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 15 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 13:10:11 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 16 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 13:10:11 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 14 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 16:04:12 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 05/08/2007 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 16:04:13 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 05/08/2007 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 16:04:13 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 05/08/2007 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 16:04:13 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 05/08/2007 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 16:04:13 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 05/08/2007 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
07-May-2007 16:04:13 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 05/08/2007 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |