Insert Time | Message |
08-May-2007 00:39:54 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 00:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 00:47:47 | ISO REQUESTS SELKIRK___II OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/08/2007 01:00 FOR Unit coming off-line, PURPA generated bid. |
08-May-2007 01:24:08 | ISO REQUESTS SELKIRK___II OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/08/2007 02:00 FOR Unit off-line, PURPA generated bid. |
08-May-2007 01:55:19 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 01:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 01:55:37 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 01:00 FOR steam security. |
08-May-2007 05:16:32 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 05:00 FOR steam security. |
08-May-2007 05:16:58 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 05:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 05:24:36 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 05:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 05:27:34 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 05:00 FOR steam security. |
08-May-2007 05:27:51 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 05:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 06:50:57 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 06:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 06:51:12 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 06:00 FOR steam security. |
08-May-2007 08:33:46 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 08:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 08:34:32 | Metering Authority - Consolidated Edison of NY UPDATES POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 05:00 FOR Modified existing OOM to accommodate SRE entry (SM)
. |
08-May-2007 09:10:34 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 09:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 09:17:38 | PJM initiated curtailment cut 560 MWs. TLR.LEVEL ONT TLR3B ON FG 9159 |
08-May-2007 09:46:11 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 09:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 09:55:02 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 09:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 10:53:11 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 10:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 10:54:28 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 10:00 FOR steam security. |
08-May-2007 10:54:42 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 10:00 FOR steam security. |
08-May-2007 11:03:05 | HQ initiated curtailment cut 1085 MWs. |
08-May-2007 11:16:16 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 11:00 FOR steam security. |
08-May-2007 11:21:49 | 05/08/2007 11:19:32 NYISO large event reserve pick-up executed. |
08-May-2007 11:34:43 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 11:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 11:47:25 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 11:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 12:04:18 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 12:00 FOR steam security. |
08-May-2007 12:24:20 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 12:00 FOR steam security. |
08-May-2007 14:11:16 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 14:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 14:11:38 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 14:00 FOR steam security. |
08-May-2007 14:34:53 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 14:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 17:25:42 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 17:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 17:53:18 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 17:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 18:01:11 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 18:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 18:05:40 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 18:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 18:13:15 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 18:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 18:15:50 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 18:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 21:17:42 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 21:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 21:17:56 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 21:00 FOR steam security. |
08-May-2007 21:39:29 | Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/09/2007 00:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 21:39:32 | Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/09/2007 00:00 FOR STEAM SYSTEM SECURITY. |
08-May-2007 21:39:35 | Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/09/2007 00:00 FOR steam security. |
08-May-2007 22:01:14 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/08/2007 22:00 FOR . |
08-May-2007 22:24:55 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/08/2007 22:00. |
Insert Time | Message |
08-May-2007 11:39:56 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:57 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:57 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:57 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:57 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:57 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:57 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:57 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:57 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:57 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:57 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:57 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:58 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:58 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:58 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:58 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:58 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:58 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:58 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:58 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:58 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:58 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:58 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:39:59 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/09/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 11:40:08 | Generator: POLETTI____ scheduled for local reliability in DAM market for 05/09/2007 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 18:56:25 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/09/2007 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 18:56:26 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/09/2007 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 18:56:26 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/09/2007 15 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 18:56:26 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/09/2007 14 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 18:56:26 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/09/2007 13 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 18:56:26 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/09/2007 12 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 18:56:26 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/09/2007 11 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
08-May-2007 18:56:26 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/09/2007 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |