07-May-2007 00:22:29Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 00:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 01:03:41Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 01:00 FOR steam security.
07-May-2007 05:07:59Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 05:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 05:57:18Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 05:00 FOR steam security.
07-May-2007 06:31:00Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 06:00 FOR steam security.
07-May-2007 06:32:52Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 06:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 06:51:06Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 06:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 06:51:19Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 06:00 FOR steam security.
07-May-2007 07:24:37Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 07:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 07:24:53Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 07:00 FOR steam security.
07-May-2007 08:02:50Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 08:10:54Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 08:11:09Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR steam security.
07-May-2007 08:11:35Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 08:16:04Metering Authority - Long Island Power Authority UPDATES NORTHPORT___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 16:00 FOR Modified existing OOM to accommodate SRE entry (prev code: Gen Derate, prev comments: late coming on)(SM).
07-May-2007 08:17:51Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 08:18:04Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR steam security.
07-May-2007 08:39:04Metering Authority - Long Island Power Authority UPDATES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/06/2007 00:00 FOR Modified existing OOM to accommodate SRE entry (Prev code: Gen Derate, prev comments: exciter problem)(SM).
07-May-2007 08:40:48Metering Authority - Long Island Power Authority UPDATES NORTHPORT___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/06/2007 00:00 FOR Modified existing OOM to accommodate SRE entry (Prev code: Gen Derate, prev comments: silica)(SM).
07-May-2007 08:47:55Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 08:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 09:40:46Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 09:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 09:41:03Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 09:00 FOR steam security.
07-May-2007 10:08:26Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 10:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 10:51:38ISO UPDATES POLETTI____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 10:00 FOR HIGH LIMIT 570 FOR SINGLE LEG OPERATION W/ Q35M O/S. LOW LIMIT @ 350 PER CON EDISON FOR M51/M52 P/C FLOWS W/ W75 O/S..
07-May-2007 10:53:05ISO UPDATES POLETTI____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 10:00 FOR HIGH LIMIT 570 FOR SINGLE LEG OPERATION W/ Q35M O/S. LOW LIMIT @ 250 PER CON EDISON FOR M51/M52 P/C FLOWS W/ W75 O/S..
07-May-2007 10:55:09ISO UPDATES POLETTI____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 10:00 FOR HIGH LIMIT 570 FOR SINGLE LEG OPERATION W/ Q35M O/S. LOW LIMIT @ 250 PER CON EDISON FOR M51/M52 P/C FLOWS W/ W75 O/S..
07-May-2007 11:00:50ISO UPDATES POLETTI____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 11:00 FOR HIGH LIMIT 570 FOR SINGLE LEG OPERATION W/ Q35M O/S. LOW LIMIT @ 280 PER CON EDISON FOR M51/M52 P/C FLOWS W/ W75 O/S..
07-May-2007 11:28:09Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 11:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 11:28:45Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 11:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 14:05:06Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 14:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 14:05:27Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 14:00 FOR steam security.
07-May-2007 16:17:06ISO REQUESTS RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 16:00 FOR CIRCUIT SWITCH TESTING @ VERNON PER CON EDISON..
07-May-2007 16:34:45Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 16:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 16:38:03ISO UPDATES RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 16:00 FOR CIRCUIT SWITCH TESTING @ VERNON PER CON EDISON..
07-May-2007 17:11:55Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 17:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 18:10:24Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 18:00 FOR steam security.
07-May-2007 18:10:35Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 18:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 18:15:42ISO REMOVES RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 18:00.
07-May-2007 18:31:54Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/07/2007 18:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 21:47:06Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 00:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 21:47:10Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 00:00 FOR STEAM SYSTEM SECURITY.
07-May-2007 21:47:13Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/08/2007 00:00 FOR steam security.
07-May-2007 21:52:54ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 21:00 FOR .
07-May-2007 22:29:57ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/07/2007 22:00.

Committed for Reliability

Back to top
Insert TimeMessage
07-May-2007 10:30:15Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 05/08/2007 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:36Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:36Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:36Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:36Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:36Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:37Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:37Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:37Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:37Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:37Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:37Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:37Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:37Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:37Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:37Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:37Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:37Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:38Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:38Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:38Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:38Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:38Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:38Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:38Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/08/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:53Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 00 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:53Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 01 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:53Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 04 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:53Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 05 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:53Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 03 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:53Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 02 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:53Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 06 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:53Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 08 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:53Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 07 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:54Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 09 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:54Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 12 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:54Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 13 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:54Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 11 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:54Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 10 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:54Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 14 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:54Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 16 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:54Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 19 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:54Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 18 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:54Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 17 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:54Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 15 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:55Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:55Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 20 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:55Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 10:30:55Generator: POLETTI____ scheduled for local reliability in DAM market for 05/08/2007 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 13:10:10Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 07 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 13:10:10Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 13:10:10Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 13:10:10Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 12 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 13:10:10Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 11 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 13:10:10Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 13:10:11Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 13 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 13:10:11Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 15 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 13:10:11Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 16 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 13:10:11Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/08/2007 14 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 16:04:12Generator: BARRETT___2 scheduled for local reliability in DAM market for 05/08/2007 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 16:04:13Generator: BARRETT___2 scheduled for local reliability in DAM market for 05/08/2007 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 16:04:13Generator: BARRETT___2 scheduled for local reliability in DAM market for 05/08/2007 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 16:04:13Generator: BARRETT___2 scheduled for local reliability in DAM market for 05/08/2007 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 16:04:13Generator: BARRETT___2 scheduled for local reliability in DAM market for 05/08/2007 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
07-May-2007 16:04:13Generator: BARRETT___2 scheduled for local reliability in DAM market for 05/08/2007 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
07-May-2007 15:05:28Prices in the May 06, 2007 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. NYISO is reserving hours beginning 20 and 21 in the May 06, 2007 Hour-Ahead Market for the period hours beginning 12 through 23. Prices in the May 08, 2007 Day-Ahead Market are correct.
07-May-2007 15:15:04The Real Time Energy prices have been updated in the MIS for 05/04/2007 in hours (10)
07-May-2007 15:15:05The Real Time ANCILLARY prices have been updated in the MIS for 05/04/2007 in hours (10)
07-May-2007 16:27:09Prices in the May 07, 2007 Real-Time Market for the period hours beginning 00 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the May 07, 2007 Hour-Ahead Market for the period hours beginning 00 through 11 are correct.