Insert Time | Message |
03-May-2007 00:02:11 | KEDC PORT_JEFF_GT3 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 05/02/2007 23:59. |
03-May-2007 00:02:11 | PORT_JEFF_4 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 05/02/2007 23:59. |
03-May-2007 00:02:11 | KEDC PORT_JEFF_GT2 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 05/02/2007 23:59. |
03-May-2007 00:42:37 | Metering Authority - Consolidated Edison of NY REQUESTS ARTHUR_KILL_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 01:00 FOR BREAKER 3 FRESHKILLS OUTAGE. |
03-May-2007 03:13:15 | Metering Authority - Consolidated Edison of NY REMOVES ARTHUR_KILL_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 03:00. |
03-May-2007 05:48:12 | ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 05:00 FOR DUE TO NIAGARA INCREASING FOR JUMPER AT FALLS. |
03-May-2007 05:48:41 | ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 05:00 FOR DUE TO NIAGARA INCREASING FOR JUMPER AT FALLS. |
03-May-2007 05:56:10 | Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 05:00 FOR 69KV CONTINGENCY. |
03-May-2007 06:02:15 | ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 06:00. |
03-May-2007 06:17:49 | Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 06:00 FOR 69KV CONTINGENCY. |
03-May-2007 06:21:49 | ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 07:00. |
03-May-2007 06:23:33 | ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 07:00. |
03-May-2007 06:24:34 | ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 07:00. |
03-May-2007 06:26:56 | ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 07:00 FOR DUE TO NIAGARA INCREASING FOR JUMPER AT FALLS. |
03-May-2007 06:43:21 | ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 07:00. |
03-May-2007 07:24:02 | ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/03/2007 07:00. |
03-May-2007 08:01:40 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 08:00 FOR 69KV CONTINGENCIES. |
03-May-2007 08:02:13 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 08:00 FOR 69KV CONTINGENCIES. |
03-May-2007 08:12:57 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 08:00 FOR L/O BK6 AT VALLEY STREAM ON 69KV.. |
03-May-2007 09:54:59 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 09:00 FOR 69KV CONTINGENCIES. |
03-May-2007 10:00:13 | Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 10:00 FOR 69KV CONTINGENCIES. |
03-May-2007 11:20:11 | NYISO Locational based curtailment cut 300 MWs. |
03-May-2007 16:17:41 | Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 16:00 FOR 69KV CONTINGENCY. |
03-May-2007 18:46:26 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 18:00 FOR 69KV CONTINGENCIES. |
03-May-2007 19:35:24 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 19:00 FOR 69KV CONTINGENCIES. |
03-May-2007 21:01:25 | Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 21:00 FOR STEAM SYSTEM SECURITY. |
03-May-2007 21:07:46 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/03/2007 21:00 FOR STEAM SYSTEM SECURITY. |
03-May-2007 21:19:34 | Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR STEAM SYSTEM SECURITY. |
03-May-2007 21:33:57 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR L/O BK6 AT VALLEY STREAM ON 69KV.. |
03-May-2007 21:33:59 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR 69KV CONTINGENCIES. |
03-May-2007 21:34:02 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR 69KV CONTINGENCIES. |
03-May-2007 21:34:05 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR 69KV CONTINGENCIES. |
03-May-2007 21:34:07 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR 69KV CONTINGENCIES. |
03-May-2007 21:34:10 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR 69KV CONTINGENCIES. |
03-May-2007 21:34:16 | Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/04/2007 00:00 FOR 69KV CONTINGENCY. |
Insert Time | Message |
03-May-2007 11:29:46 | Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 05/04/2007 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:30:41 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 16 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:30:41 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 17 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:30:42 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 18 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:30:42 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 19 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:30:42 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:30:42 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:30:42 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:30:42 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/04/2007 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:31:45 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 05/04/2007 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:35:26 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 05/04/2007 23 Energy = 190 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:17 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:18 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:18 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:18 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:18 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:18 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:18 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:18 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:18 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:18 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:19 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:19 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:19 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:19 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:19 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:19 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:19 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:19 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:19 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:19 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:19 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:20 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:20 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
03-May-2007 11:37:20 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/04/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |