Insert Time | Message |
01-May-2007 00:02:05 | HOLTSVILLE_IC_9 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 04/30/2007 23:59. |
01-May-2007 00:24:04 | 05/01/2007 00:22:52 NYISO large event reserve pick-up executed. |
01-May-2007 01:35:08 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 01:00 FOR CONED STEAM SYSTEM. |
01-May-2007 01:46:55 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 01:00 FOR STEAM SYSTEM SECRUITY. |
01-May-2007 01:59:21 | ISO UPDATES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 01:00 FOR . |
01-May-2007 02:08:18 | ISO UPDATES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 02:00 FOR all units lost basepoints, computer problem. |
01-May-2007 02:14:50 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 02:00 FOR . |
01-May-2007 02:15:47 | ISO UPDATES NIAGARA____ OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 05/01/2007 02:00 FOR . |
01-May-2007 02:28:29 | ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 02:00 FOR computer problems. |
01-May-2007 02:30:29 | ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 02:00 FOR Computer problems. |
01-May-2007 02:31:59 | ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 02:00 FOR Computer problems. |
01-May-2007 02:59:59 | NYCA, State out of merit for NYISO computer problems. |
01-May-2007 03:01:22 | State taken Out of Merit for ISO computer problems. |
01-May-2007 03:02:26 | As of 03:00 5/1/2007, NY State no longer OOM. |
01-May-2007 03:03:12 | ISO REMOVES NIAGARA____ OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 05/01/2007 03:00. |
01-May-2007 03:07:04 | ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 03:00. |
01-May-2007 03:07:16 | ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 03:00. |
01-May-2007 03:08:25 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 03:00. |
01-May-2007 03:09:22 | ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 03:00 FOR computer problems. |
01-May-2007 03:10:04 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 03:00. |
01-May-2007 03:17:30 | ISO UPDATES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 03:00 FOR computer problems. |
01-May-2007 03:17:59 | ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 03:00 FOR computer problems. |
01-May-2007 03:18:20 | ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 05:00 FOR computer problems. |
01-May-2007 03:21:47 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 03:00 FOR CONED STEAM SYSTEM. |
01-May-2007 03:25:40 | ISO UPDATES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 04:00 FOR computer problems. |
01-May-2007 03:25:53 | ISO UPDATES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 03:00 FOR computer problems. |
01-May-2007 03:26:03 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 04:00. |
01-May-2007 03:26:08 | ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 03:00 FOR computer problems. |
01-May-2007 03:38:33 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 03:00 FOR STEAM SYSTEM SECRUITY. |
01-May-2007 03:40:30 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 04:00. |
01-May-2007 03:40:56 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 04:00. |
01-May-2007 03:41:43 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 04:00. |
01-May-2007 03:41:59 | ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 04:00 FOR Computer problems. |
01-May-2007 03:50:35 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 04:00. |
01-May-2007 03:52:12 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 04:00. |
01-May-2007 03:53:35 | ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 04:00 FOR Computer problems.. |
01-May-2007 05:22:29 | ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 05:00. |
01-May-2007 05:54:05 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 05:00 FOR . |
01-May-2007 06:03:34 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 06:00. |
01-May-2007 06:18:05 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 06:00 FOR 69kv contingencies. |
01-May-2007 06:25:54 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 06:00 FOR STEAM SYSTEM SECRUITY. |
01-May-2007 06:28:47 | ISO REQUESTS PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 06:00 FOR 69 kV contingencies. |
01-May-2007 06:31:48 | Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 06:00 FOR 69kv contingencies. |
01-May-2007 06:34:36 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 06:00 FOR 69kv overload. |
01-May-2007 06:44:08 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 06:00 FOR CONED STEAM SYSTEM. |
01-May-2007 07:23:32 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 07:00 FOR 69kv contingencies. |
01-May-2007 07:31:14 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 07:00 FOR CONED STEAM SYSTEM. |
01-May-2007 07:35:34 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 07:00 FOR 69kv contingencies. |
01-May-2007 07:42:32 | Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 07:00 FOR 69kv overload. |
01-May-2007 08:08:51 | NPX initiated curtailment cut 17 MWs. Due to NE tag Mis match |
01-May-2007 08:16:37 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 08:00 FOR STEAM SYSTEM SECRUITY. |
01-May-2007 08:20:43 | Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 08:00 FOR 69kv contingencies. |
01-May-2007 09:15:18 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 09:00. |
01-May-2007 09:18:11 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 09:00 FOR 69kv overload. |
01-May-2007 10:11:44 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 10:00 FOR CONED STEAM SYSTEM / Contingencies. |
01-May-2007 10:28:03 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 10:00 FOR CONED STEAM SYSTEM / Contingencies. |
01-May-2007 13:45:37 | ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 13:00 FOR HONOR MIN RUN TIME. |
01-May-2007 13:46:31 | ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 15:00. |
01-May-2007 13:47:04 | ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 14:00 FOR HONOR MIN RUN TIME. |
01-May-2007 14:21:59 | Metering Authority - Consolidated Edison of NY REMOVES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 14:00. |
01-May-2007 14:27:49 | Metering Authority - Niagara Mohawk REQUESTS INDECK___OLEAN OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 15:00 FOR local security. |
01-May-2007 14:27:59 | ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 05/01/2007 14:00. |
01-May-2007 14:44:46 | Metering Authority - Niagara Mohawk REMOVES INDECK___OLEAN OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 15:00. |
01-May-2007 15:31:11 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 15:00 FOR 69 kv contingencies. |
01-May-2007 15:31:55 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 15:00 FOR 69kv contingencies. |
01-May-2007 16:01:38 | Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 16:00. |
01-May-2007 19:36:26 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 19:00 FOR BK6 CONT ON 69KV TRANSMISSION.. |
01-May-2007 21:43:51 | Metering Authority - Long Island Power Authority REMOVES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 21:00. |
01-May-2007 22:20:02 | Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/02/2007 00:00 FOR STEAM SYSTEM SECRUITY. |
01-May-2007 22:20:05 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/02/2007 00:00 FOR BK6 CONT ON 69KV TRANSMISSION.. |
01-May-2007 22:20:08 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/02/2007 00:00 FOR 69kv contingencies. |
01-May-2007 22:28:54 | Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 22:00 FOR . |
01-May-2007 22:29:46 | Metering Authority - Long Island Power Authority UPDATES KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 22:00 FOR 69KV CONTINGENCY.. |
01-May-2007 22:32:06 | Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 22:00 FOR STEAM SYSTEM SECRUITY.. |
01-May-2007 22:36:14 | Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 22:00. |
01-May-2007 22:36:27 | Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 22:00. |
01-May-2007 22:39:12 | Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 22:00. |
01-May-2007 22:52:26 | Metering Authority - Long Island Power Authority REQUESTS KEDC PORT_JEFF_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 23:00 FOR 69KV CONTINGENCY.. |
01-May-2007 22:55:53 | Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/01/2007 22:00. |
01-May-2007 23:18:43 | Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 05/02/2007 00:00 FOR STEAM SYSTEM SECRUITY.. |
Insert Time | Message |
01-May-2007 10:51:26 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 05/02/2007 23 Energy = 190 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:05 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:06 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:06 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:06 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:06 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:06 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:06 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:06 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:06 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:06 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:07 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:07 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:07 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:07 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:07 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:07 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:07 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:07 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:08 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:08 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:08 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:08 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:08 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 11:49:08 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 05/02/2007 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
01-May-2007 12:25:02 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 05/01/2007 14 Energy = 67 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |