P-2516-Feb-2007

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
16-Feb-2007 00:02:10INDECK___YERKES NO LONGER COMMITED FOR ISO RELIABILITY AFTER 02/15/2007 23:59.
16-Feb-2007 03:53:28Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 03:00 FOR Steam System Security.
16-Feb-2007 03:53:48Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 03:00 FOR Steam System Security.
16-Feb-2007 05:17:49Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 05:00 FOR Steam System Security.
16-Feb-2007 05:18:08Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 05:00 FOR Steam System Security.
16-Feb-2007 05:41:49Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 05:00 FOR Post cont loss of 138-887 & 874 onto 69kv system.
16-Feb-2007 06:09:43Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 06:00 FOR Steam System Security.
16-Feb-2007 06:10:02Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 06:00 FOR Steam System Security.
16-Feb-2007 06:19:07Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 06:00 FOR Steam System Security.
16-Feb-2007 06:19:28Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 06:00 FOR Steam System Security.
16-Feb-2007 07:35:04Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 07:00.
16-Feb-2007 08:23:3402/16/2007 08:20:17 NYISO large event reserve pick-up executed.
16-Feb-2007 13:49:08Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 13:00 FOR LI 69kv contingencies.
16-Feb-2007 14:07:40Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 14:00 FOR LI 69 kv contingencies.
16-Feb-2007 17:24:59Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 17:00 FOR to give unit BP's until SRE picked up..
16-Feb-2007 17:44:01Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 17:00 FOR 69 kv contingencies.
16-Feb-2007 19:34:40Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 19:00 FOR Steam System Security.
16-Feb-2007 19:34:53Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 19:00 FOR Steam System Security.
16-Feb-2007 19:46:07Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 19:00 FOR Steam System Security.
16-Feb-2007 19:46:22Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 19:00 FOR Steam System Security.
16-Feb-2007 19:51:45Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 19:00 FOR Steam System Security.
16-Feb-2007 19:51:57Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 19:00 FOR Steam System Security.
16-Feb-2007 19:58:58Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 19:00 FOR Steam System Security..
16-Feb-2007 19:59:09Metering Authority - Consolidated Edison of NY REMOVES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 20:00.
16-Feb-2007 20:17:13Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 20:00 FOR Steam System Security.
16-Feb-2007 20:21:00Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 20:00 FOR Steam System Security.
16-Feb-2007 20:21:09Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 20:00 FOR Steam System Security.
16-Feb-2007 20:22:21Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 20:00 FOR Steam System Security.
16-Feb-2007 20:39:25Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 20:00 FOR Steam System Security.
16-Feb-2007 20:55:01Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/17/2007 00:00 FOR CON ED SYSTEM STEAM.
16-Feb-2007 20:55:02Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/17/2007 00:00 FOR Steam System Security.
16-Feb-2007 20:56:21Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 20:00 FOR CON ED SYSTEM STEAM.
16-Feb-2007 20:57:49Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 20:00 FOR CON ED SYSTEM STEAM.
16-Feb-2007 21:10:35Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 21:00.
16-Feb-2007 21:22:23Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 21:00.
16-Feb-2007 21:25:24Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 21:00 FOR CON ED SYSTEM STEAM.
16-Feb-2007 21:58:56Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 21:00 FOR CON ED SYSTEM STEAM.
16-Feb-2007 22:00:39Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 22:00.
16-Feb-2007 22:30:11Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 22:00 FOR CON ED SYSTEM STEAM.
16-Feb-2007 22:47:03Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 22:00 FOR CON ED SYSTEM STEAM.
16-Feb-2007 23:03:16Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/16/2007 23:00 FOR CON ED SYSTEM STEAM.

Committed for Reliability

Back to top
Insert TimeMessage
16-Feb-2007 11:22:35Generator: BARRETT___1 scheduled for local reliability in DAM market for 02/17/2007 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:24:20Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/17/2007 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:24:20Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/17/2007 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:29:59Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 02/17/2007 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:30:22Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 02/17/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:30:35Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 02/17/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:31:08Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/17/2007 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:31:08Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/17/2007 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:31:08Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/17/2007 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:31:08Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/17/2007 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:31:09Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/17/2007 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:31:09Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/17/2007 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:31:09Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/17/2007 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:31:09Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/17/2007 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:38:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:39:00Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:39:00Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 11:39:00Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/17/2007 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 17:06:38Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2007 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 17:06:38Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2007 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 17:06:38Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2007 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 17:06:38Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2007 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
16-Feb-2007 17:06:38Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2007 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
16-Feb-2007 14:26:38Prices in the February 15, 2007 Real-Time Market for the period hours beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the February 15, 2007 Hour-Ahead Market for the period hours beginning 12 through 23 are correct. Prices in the February 17, 2007 Day-Ahead Market are correct.
16-Feb-2007 17:29:25Prices in the February 16, 2007 Real-Time Market for the period hours beginning 00 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the February 16, 2007 Hour-Ahead Market for the period hours beginning 00 through 11 are correct.