P-2514-Dec-2006

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
14-Dec-2006 00:00:47Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 00:00 FOR SYSTEM STEAM.
14-Dec-2006 00:01:24Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 00:00 FOR Con Ed steam.
14-Dec-2006 00:01:46Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 00:00 FOR CON ED STEAM SENDOUT.
14-Dec-2006 02:36:22Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 02:00 FOR Con Ed steam.
14-Dec-2006 02:36:42Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 02:00 FOR CON ED STEAM SENDOUT.
14-Dec-2006 04:54:36Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 04:00 FOR CON ED STEAM SENDOUT.
14-Dec-2006 04:54:55Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 04:00 FOR Con Ed steam.
14-Dec-2006 04:55:45Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 04:00 FOR SYSTEM STEAM.
14-Dec-2006 05:20:14Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 05:00 FOR Con Ed steam.
14-Dec-2006 05:21:07Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 05:00 FOR CON ED STEAM SENDOUT.
14-Dec-2006 05:42:37Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 05:00 FOR Con Ed steam.
14-Dec-2006 05:42:55Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 05:00 FOR CON ED STEAM SENDOUT.
14-Dec-2006 06:17:4312/14/2006 06:14:40 NYISO large event reserve pick-up executed.
14-Dec-2006 06:36:34Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 06:00 FOR CON ED STEAM SENDOUT.
14-Dec-2006 06:37:02Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 06:00 FOR Con Ed steam.
14-Dec-2006 08:06:30Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 08:00 FOR SYSTEM STEAM.
14-Dec-2006 09:28:44Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 09:00 FOR 115kv contingencies.
14-Dec-2006 09:29:10Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 09:00 FOR 115 kv coningencies.
14-Dec-2006 10:18:22Metering Authority - Consolidated Edison of NY UPDATES POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/13/2006 22:00 FOR SRE entered by TSA (SJ).
14-Dec-2006 10:21:50Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/13/2006 22:00 FOR TSA (SJ) modified original OOM to accommodate SRE Entry. Original Type: OOM Gen Request; Original Log: Gas Heater O/S..
14-Dec-2006 10:24:33Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 10:00 FOR CON ED STEAM SENDOUT.
14-Dec-2006 10:27:35Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 10:00 FOR Con Ed steam.
14-Dec-2006 11:09:07Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 11:00 FOR CON ED STEAM SENDOUT.
14-Dec-2006 11:09:31Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 11:00 FOR Con Ed steam.
14-Dec-2006 11:59:13Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 11:00 FOR Con Ed steam.
14-Dec-2006 12:00:10Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 12:00 FOR CON ED STEAM SENDOUT.
14-Dec-2006 12:16:56Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 12:00 FOR Con Ed steam.
14-Dec-2006 13:47:32Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 13:00 FOR SYSTEM STEAM.
14-Dec-2006 16:16:43Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 16:00 FOR CON ED STEAM SENDOUT.
14-Dec-2006 17:13:23Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 17:00 FOR CON ED STEAM SENDOUT.
14-Dec-2006 17:14:17Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 17:00 FOR Con Ed steam.
14-Dec-2006 21:00:26Metering Authority - Niagara Mohawk REMOVES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 21:00.
14-Dec-2006 21:00:50Metering Authority - Niagara Mohawk REMOVES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/14/2006 21:00.
14-Dec-2006 23:42:31Metering Authority - Consolidated Edison of NY REQUESTS ARTHUR_KILL_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/15/2006 00:00 FOR 29232 RETURN DELAYED.

Committed for Reliability

Back to top
Insert TimeMessage
14-Dec-2006 10:41:43Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:43Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:43Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:43Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:43Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:44Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:44Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:44Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:44Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:44Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:44Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:44Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:44Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:44Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:44Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:44Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:44Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:45Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:45Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:45Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:45Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:45Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:45Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:41:45Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/15/2006 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:42:15Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 12/15/2006 22 Energy = 226 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:42:15Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 12/15/2006 23 Energy = 226 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:42:30Generator: POLETTI____ scheduled for local reliability in DAM market for 12/15/2006 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Dec-2006 10:42:30Generator: POLETTI____ scheduled for local reliability in DAM market for 12/15/2006 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
14-Dec-2006 14:53:45Prices in the December 13, 2006 Real-Time Market for the period hour beginning 12 through 23 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the December 13, 2006 Hour-Ahead Market for the period hour beginning 12 through 23 are correct. Prices in the December 15, 2006 Day-Ahead Market are correct.
14-Dec-2006 16:26:08Prices in the December 14, 2006 Real-Time Market for hours beginning 00 through 11 encompassing Energy, Regulation, and Operating Reserves are correct. Prices in the December 14, 2006 Hour-Ahead Market for hours beginning 00 through 11 are correct.