P-2529-Nov-2006

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
29-Nov-2006 05:06:19Metering Authority - Central Hudson Gas and Electr REQUESTS SOUTH CAIRO___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2006 05:00 FOR LINE OUTAGE.
29-Nov-2006 06:14:3011/29/2006 06:08:49 NYISO large event reserve pick-up executed.
29-Nov-2006 06:21:07Metering Authority - Central Hudson Gas and Electr UPDATES SOUTH CAIRO___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2006 06:00 FOR LINE OUTAGE.
29-Nov-2006 07:45:50Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2006 07:00 FOR SYSTEM STEAM.
29-Nov-2006 11:11:56Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2006 11:00 FOR Con Ed steam.
29-Nov-2006 11:12:13Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2006 11:00 FOR CON ED STEAM SENDOUT.
29-Nov-2006 15:34:56Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2006 15:00 FOR CON ED STEAM SENDOUT.
29-Nov-2006 16:45:30Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2006 16:00 FOR SYSTEM STEAM.
29-Nov-2006 16:49:2611/29/2006 16:47:35 NYISO large event reserve pick-up executed.
29-Nov-2006 16:56:01Metering Authority - Central Hudson Gas and Electr REMOVES SOUTH CAIRO___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2006 16:00.
29-Nov-2006 19:36:39Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2006 19:00 FOR SYSTEM STEAM.
29-Nov-2006 21:05:03Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2006 21:00 FOR SYSTEM STEAM.
29-Nov-2006 21:20:07Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2006 21:00 FOR Con Ed steam.

Committed for Reliability

Back to top
Insert TimeMessage
29-Nov-2006 10:44:08Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 11/30/2006 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:44:36Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 11/30/2006 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:44:54Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 11/30/2006 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:17Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2006 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:17Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2006 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:46Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:47Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:47Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:47Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:47Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:47Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:47Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:47Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:47Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:47Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:47Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:47Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:48Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:48Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:48Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:48Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:48Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:48Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:48Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:48Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:48Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:48Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:49Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:45:49Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:10Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:10Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:10Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:10Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:12Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:12Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:12Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:12Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:12Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:12Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:12Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2006 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:31Generator: POLETTI____ scheduled for local reliability in DAM market for 11/30/2006 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:31Generator: POLETTI____ scheduled for local reliability in DAM market for 11/30/2006 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:31Generator: POLETTI____ scheduled for local reliability in DAM market for 11/30/2006 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:49Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 11/30/2006 22 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 10:46:49Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 11/30/2006 23 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:37Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 07 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:37Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 08 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:37Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 10 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:37Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 09 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:38Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 11 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:38Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 16 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:38Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 18 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:38Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 20 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:38Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 22 Energy = 55 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:38Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 21 Energy = 55 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:38Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 19 Energy = 54 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:38Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 17 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:38Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 15 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:38Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 12 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:38Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 13 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:38Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 14 Energy = 53 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
29-Nov-2006 21:15:39Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 11/30/2006 23 Energy = 55 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
29-Nov-2006 16:29:56NYISO is reserving hour beginning 15 in the November 28, 2006 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. Prices in the November 28, 2006 Hour-Ahead Market are correct. Prices in the November 30, 2006 Day-Ahead Market are correct.