P-2520-Aug-2006

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
20-Aug-2006 00:18:12Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 00:00 FOR STEAM SYSTEM.
20-Aug-2006 00:18:35Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 00:00 FOR STEAM SECURITY.
20-Aug-2006 01:05:37Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 01:00 FOR STEAM SYSTEM.
20-Aug-2006 01:06:03Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 01:00 FOR STEAM SECURITY.
20-Aug-2006 01:06:26Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 01:00 FOR STEAM SYSTEM.
20-Aug-2006 04:37:18ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/20/2006 04:00 FOR FOR GARDENVILLE TWR.
20-Aug-2006 04:37:32ISO UPDATES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/20/2006 04:00 FOR FOR GARDENVILLE TWR.
20-Aug-2006 05:02:39ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/20/2006 05:00 FOR FOR GARDENVILLE TWR.
20-Aug-2006 05:02:57ISO UPDATES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/20/2006 05:00 FOR FOR GARDENVILLE TWR.
20-Aug-2006 05:44:17Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 05:00 FOR STEAM SYSTEM.
20-Aug-2006 05:44:38Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 05:00 FOR STEAM SECURITY.
20-Aug-2006 06:17:03ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/20/2006 06:00 FOR FOR GARDENVILLE TWR.
20-Aug-2006 06:17:20ISO UPDATES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/20/2006 06:00 FOR FOR GARDENVILLE TWR.
20-Aug-2006 06:28:22ISO UPDATES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/20/2006 06:00 FOR FOR GARDENVILLE TWR.
20-Aug-2006 06:28:33ISO UPDATES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/20/2006 06:00 FOR FOR GARDENVILLE TWR.
20-Aug-2006 06:50:38Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 06:00 FOR STEAM SYSTEM.
20-Aug-2006 06:50:56Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 06:00 FOR STEAM SECURITY.
20-Aug-2006 07:11:52NYISO Locational based curtailment cut 200 MWs.
20-Aug-2006 07:14:15NYISO Locational based curtailment cut 200 MWs.
20-Aug-2006 07:47:00Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 07:00 FOR STEAM SYSTEM.
20-Aug-2006 07:47:16Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 07:00 FOR STEAM SECURITY.
20-Aug-2006 07:47:31Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 07:00 FOR STEAM SYSTEM.
20-Aug-2006 07:59:34ISO REQUESTS SELKIRK___l OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/20/2006 08:00 FOR METERING PROBLEMS WITHIN NIMO IN EAST CAUSED SELKIRK I METERING TO GET INTO THE PURPA PROGRAM AND CAUSE BAD SCHEDULED FOR HB08. UNIT @ 70 CURRENTLY, OOM TO FIX BASEPOINT DUE TO PURPA PROGRAM MIS-READ..
20-Aug-2006 08:01:06Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 08:00 FOR STEAM SYSTEM SECURITY.
20-Aug-2006 08:37:3508/20/2006 08:34:34 NYISO large event reserve pick-up executed.
20-Aug-2006 08:41:44Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 08:00 FOR EAST END LOAD PER LI..
20-Aug-2006 08:56:48Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 08:00 FOR STEAM SYSTEM SECURITY.
20-Aug-2006 09:15:20Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 09:00 FOR STEAM SYSTEM SECURITY.
20-Aug-2006 09:22:35Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 09:00 FOR STEAM SYSTEM SECURITY.
20-Aug-2006 09:48:02Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 09:00 FOR STEAM SECURITY.
20-Aug-2006 09:55:10Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 09:00 FOR STEAM SYSTEM.
20-Aug-2006 09:57:08Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 09:00 FOR STEAM SYSTEM SECURITY.
20-Aug-2006 10:04:43Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 10:00 FOR STEAM SYSTEM SECURITY.
20-Aug-2006 10:22:56ISO REMOVES DUNKIRK___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/20/2006 10:00.
20-Aug-2006 10:23:05ISO REMOVES DUNKIRK___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/20/2006 10:00.
20-Aug-2006 11:35:00Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 11:00 FOR southfork load.
20-Aug-2006 12:08:43Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 12:00 FOR EAST END LOADS PER LI..
20-Aug-2006 12:53:02Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 12:00 FOR STEAM SYSTEM SECURITY.
20-Aug-2006 16:02:55Metering Authority - Long Island Power Authority UPDATES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 16:00 FOR southfork load.
20-Aug-2006 16:21:02Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 16:00 FOR STEAM SYSTEM SECURITY.
20-Aug-2006 16:25:37Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 16:00 FOR STEAM SYSTEM.
20-Aug-2006 16:25:52Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 16:00 FOR STEAM SECURITY.
20-Aug-2006 16:34:48Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 16:00 FOR STEAM SYSTEM.
20-Aug-2006 19:13:1408/20/2006 19:09:32 NYISO large event reserve pick-up executed.
20-Aug-2006 19:16:22Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 19:00.
20-Aug-2006 19:17:15Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 19:00.
20-Aug-2006 19:50:58Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 19:00 FOR STEAM SYSTEM.
20-Aug-2006 19:51:12Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 19:00 FOR STEAM SECURITY.
20-Aug-2006 20:31:27Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 20:00 FOR STEAM SYSTEM SECURITY.
20-Aug-2006 20:51:57Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 20:00 FOR STEAM SYSTEM.
20-Aug-2006 20:52:11Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 20:00 FOR STEAM SECURITY.
20-Aug-2006 23:06:51Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/20/2006 23:00.

Committed for Reliability

Back to top
Insert TimeMessage
20-Aug-2006 10:36:30Generator: ASTORIA___5 scheduled for local reliability in DAM market for 08/21/2006 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:36:30Generator: ASTORIA___5 scheduled for local reliability in DAM market for 08/21/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:27Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:27Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:27Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:27Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:27Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:29Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:29Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:29Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:29Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:29Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:37:29Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/21/2006 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:12Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 00 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 01 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 02 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 04 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 06 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 13 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 12 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 11 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 07 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 05 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 03 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:14Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 14 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:14Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 23 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:14Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 22 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:14Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 21 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:14Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 20 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:14Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 19 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:14Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 16 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:14Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 17 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:14Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 15 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 10:45:14Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/21/2006 18 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 11:39:46Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/21/2006 00 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 11:39:46Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/21/2006 01 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 11:39:46Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/21/2006 02 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 11:39:46Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/21/2006 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 11:39:46Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/21/2006 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 11:39:46Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/21/2006 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 11:39:46Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/21/2006 05 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 11:39:46Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/21/2006 04 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 11:39:46Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/21/2006 03 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 11:40:36Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 08/21/2006 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:49Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:49Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:49Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:49Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 05 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:49Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:49Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:50Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 14 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:50Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 06 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:50Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 13 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:50Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 12 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:50Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 11 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:50Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 10 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:50Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 09 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:50Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 08 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:50Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 07 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:50Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 15 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:50Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 16 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:50Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 17 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:51Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 18 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:51Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 19 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:51Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 21 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:51Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 20 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:51Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 22 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Aug-2006 12:45:51Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/21/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
20-Aug-2006 15:13:00Prices in the August 19, 2006 Real-Time Market encompassing Energy, Regulation and Operating Reserves are correct. Prices in the August 19, 2006 Hour-Ahead Market are correct. Prices in the August 21, 2006 Day-Ahead Market are correct.