Insert Time | Message |
23-Aug-2006 06:19:08 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 06:00 FOR STEAM SECURITY. |
23-Aug-2006 06:19:48 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 06:00 FOR STEAM SYSTEM. |
23-Aug-2006 09:20:20 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 09:00 FOR FOR EAST FORK LOAD.. |
23-Aug-2006 09:24:34 | ISO REQUESTS EAST RIVER___7 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/23/2006 09:00 FOR FOR M-51 WORK. |
23-Aug-2006 09:57:48 | ISO UPDATES EAST RIVER___7 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/23/2006 09:00 FOR FOR M-51 WORK. |
23-Aug-2006 10:05:56 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 10:00 FOR STEAM SYSTEM. |
23-Aug-2006 10:06:15 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 10:00 FOR STEAM SECURITY. |
23-Aug-2006 10:19:53 | 08/23/2006 10:17:26 NYISO large event reserve pick-up executed. |
23-Aug-2006 10:23:18 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/23/2006 10:00 FOR . |
23-Aug-2006 10:23:58 | 08/23/2006 10:21:40 NYISO large event reserve pick-up executed. |
23-Aug-2006 10:26:54 | ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/23/2006 10:00 FOR RESERVE PICKUP. |
23-Aug-2006 10:27:17 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/23/2006 10:00. |
23-Aug-2006 10:39:41 | 08/23/2006 10:36:30 NYISO large event reserve pick-up executed. |
23-Aug-2006 10:43:03 | ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/23/2006 10:00 FOR LOSS OF IP2. |
23-Aug-2006 12:07:16 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 12:00 FOR STEAM SYSTEM SECURITY. |
23-Aug-2006 13:43:03 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 13:00 FOR STEAM SYSTEM. |
23-Aug-2006 13:43:42 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 13:00 FOR STEAM SECURITY. |
23-Aug-2006 14:00:56 | 08/23/2006 13:58:36 NYISO large event reserve pick-up executed. |
23-Aug-2006 15:44:27 | NYISO Emergency Transaction added 300 MWs. |
23-Aug-2006 15:45:04 | NYISO Emergency Transaction added 300 MWs. |
23-Aug-2006 15:45:45 | NYISO Emergency Transaction added 200 MWs. |
23-Aug-2006 15:46:08 | NYISO Emergency Transaction added 1067 MWs. |
23-Aug-2006 15:46:33 | NYISO Emergency Transaction added 100 MWs. |
23-Aug-2006 16:03:35 | ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/23/2006 16:00 FOR TLR CUTS. |
23-Aug-2006 16:06:46 | ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/23/2006 16:00 FOR TLR CUTS. |
23-Aug-2006 16:51:02 | ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/23/2006 17:00 FOR TLR CUTS. |
23-Aug-2006 17:09:36 | ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/23/2006 17:00 FOR TLR CUTS. |
23-Aug-2006 19:12:01 | Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 19:00 FOR FOR LOSS OF BANK 6 @ VALLEY STREAM ON 69KV 361 PER LI.. |
23-Aug-2006 19:21:51 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 19:00 FOR STEAM SENDOUT FOR CON EDISON.. |
23-Aug-2006 20:45:24 | Metering Authority - Consolidated Edison of NY REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 20:00. |
23-Aug-2006 20:45:48 | ISO REMOVES EAST RIVER___7 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/23/2006 20:00. |
23-Aug-2006 20:47:55 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 20:00 FOR STEAM SYSTEM. |
23-Aug-2006 20:48:08 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 20:00 FOR STEAM SECURITY. |
23-Aug-2006 22:01:54 | Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 22:00. |
23-Aug-2006 22:31:33 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 22:00 FOR STEAM SYSTEM. |
23-Aug-2006 22:31:45 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 22:00 FOR STEAM SECURITY. |
23-Aug-2006 22:39:59 | Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/23/2006 23:00. |
Insert Time | Message |
23-Aug-2006 11:08:17 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:17 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 07 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:17 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 06 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:17 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:17 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:17 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 05 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:17 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:17 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:18 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 08 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:18 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 10 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:18 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 11 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:18 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 20 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:18 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 19 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:18 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 18 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:18 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 17 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:18 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 16 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:18 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 15 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:18 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 14 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:18 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 13 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:18 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 12 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:18 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 09 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:19 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 21 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:19 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:08:19 | Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/24/2006 22 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:48:00 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/24/2006 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:48:01 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/24/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:48:13 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 08/24/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:48:46 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 08/24/2006 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 11:48:46 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 08/24/2006 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:01:29 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/24/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:01:46 | Generator: ASTORIA___4 scheduled for local reliability in DAM market for 08/24/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:13 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:13 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:13 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:13 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:13 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:13 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:13 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:13 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:13 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:14 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:14 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:14 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:14 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:14 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:14 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:14 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:14 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:14 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:14 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:14 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:14 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:15 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:15 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Aug-2006 15:02:15 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/24/2006 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |