P-2506-Aug-2006

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
06-Aug-2006 00:40:47Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 00:00.
06-Aug-2006 00:51:17Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 00:00 FOR STEAM SYSTEM.
06-Aug-2006 00:51:34Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 00:00 FOR STEAM SECURITY.
06-Aug-2006 01:31:11Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 01:00.
06-Aug-2006 07:04:50Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 07:00 FOR STEAM SYSTEM.
06-Aug-2006 07:05:12Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 07:00 FOR STEAM SECURITY.
06-Aug-2006 08:20:09Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 08:00 FOR EAST END SECURITY.
06-Aug-2006 10:14:36Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 10:00 FOR EAST END CONTINGENCY.
06-Aug-2006 10:28:52Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 10:00 FOR STEAM SYSTEM.
06-Aug-2006 10:29:11Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 10:00 FOR STEAM SECURITY.
06-Aug-2006 11:05:19Metering Authority - Orange and Rockland Utilities REQUESTS SHOEMAKER___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 11:00 FOR O&R LOCAL LOAD.
06-Aug-2006 11:31:05Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 11:00 FOR CON ED SYSTEM STEAM.
06-Aug-2006 11:38:06Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 11:00 FOR EAST END SECURITY.
06-Aug-2006 11:39:16Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 11:00 FOR EAST END SECURITY.
06-Aug-2006 16:30:26Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 16:00 FOR STEAM SYSTEM.
06-Aug-2006 16:30:41Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 16:00 FOR STEAM SECURITY.
06-Aug-2006 16:48:4208/06/2006 16:44:16 NYISO large event reserve pick-up executed.
06-Aug-2006 16:51:1208/06/2006 16:47:30 NYISO large event reserve pick-up executed.
06-Aug-2006 17:53:06Metering Authority - Long Island Power Authority REQUESTS PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 18:00 FOR AT LI'S REQUEST FOR IROQUIOS GAS PRESSURE PROBLEMS.
06-Aug-2006 18:51:24Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 18:00 FOR STEAM SYSTEM SECURITY PER CON EDISON..
06-Aug-2006 19:38:14Metering Authority - Long Island Power Authority REMOVES PPL_SHRM_GT3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 19:00.
06-Aug-2006 19:39:47Metering Authority - Orange and Rockland Utilities REMOVES SHOEMAKER___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 19:00.
06-Aug-2006 19:40:25Metering Authority - Orange and Rockland Utilities UPDATES SHOEMAKER___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 19:00 FOR UNIT WAS OOM FOR O&R, TAKEN OFFLINE - DERATING TO REMOVE BASEPOINT..
06-Aug-2006 19:52:36Metering Authority - Long Island Power Authority REQUESTS Freeport___CT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 19:00 FOR 69KV SECURITY - PROBLEMS @ BELLMORE SUBSTATION PER LI...
06-Aug-2006 19:59:35Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 19:00 FOR CON ED SYSTEM STEAM.
06-Aug-2006 20:34:42Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 20:00.
06-Aug-2006 21:00:28Metering Authority - Long Island Power Authority REMOVES Freeport___CT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 21:00.
06-Aug-2006 21:40:00Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/06/2006 21:00.
06-Aug-2006 23:01:42Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/07/2006 00:00 FOR EAST END SECURITY.

Committed for Reliability

Back to top
Insert TimeMessage
06-Aug-2006 11:06:00Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/07/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 11:20:25Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 08/07/2006 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 11:20:25Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 08/07/2006 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 11:20:25Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 08/07/2006 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 11:20:25Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 08/07/2006 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 11:20:25Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 08/07/2006 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 11:20:25Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 08/07/2006 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 11:20:25Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 08/07/2006 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:02:25Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/07/2006 09 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:02:26Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/07/2006 10 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:02:26Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/07/2006 14 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:02:26Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/07/2006 13 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:02:26Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/07/2006 12 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:02:26Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/07/2006 11 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:02:26Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/07/2006 15 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:02:26Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/07/2006 17 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:02:26Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/07/2006 16 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:02:27Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/07/2006 18 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:02:27Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/07/2006 21 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:02:27Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/07/2006 20 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:02:27Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/07/2006 19 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:05Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:06Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:06Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 11 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:06Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:06Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 14 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:06Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 16 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:06Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 18 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:06Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 19 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:06Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 17 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:06Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 15 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:06Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 13 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:06Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 12 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:07Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 20 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Aug-2006 12:29:07Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 08/07/2006 21 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
06-Aug-2006 16:14:24Prices in the August 05, 2006 Real-Time Market encompassing Energy, Regulation and Operating Reserves are correct. Prices in the August 05, 2006 Hour-Ahead Market are correct. Prices in the August 07, 2006 Day-Ahead Market are correct.
06-Aug-2006 16:44:20The NYISO is releassing prices in the July 31, 2006 Real-Time Market for HB 16, 17, and 18. The NYISO is releassing prices in the July 31, 2006 Hour-Ahead Market for HB 17 and 18.
06-Aug-2006 16:49:22Price Reservation Release Notice for the 07/31/2006 Real-Time and Hour-Ahead Markets: Typo Correction. The message with spelling correction is: The NYISO is releasing prices in the July 31, 2006 Real-Time Market for HB 16, 17, and 18. The NYISO is releasing prices in the July 31, 2006 Hour-Ahead Market for HB 17 and 18.