Insert Time | Message |
25-Aug-2006 01:24:41 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 01:00 FOR STEAM SYSTEM. |
25-Aug-2006 01:25:02 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 01:00 FOR STEAM SECURITY. |
25-Aug-2006 01:25:21 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 01:00 FOR STEAM SYSTEM. |
25-Aug-2006 04:08:38 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 04:00 FOR STEAM SECURITY. |
25-Aug-2006 04:08:58 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 04:00 FOR STEAM SYSTEM. |
25-Aug-2006 05:32:50 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 05:00 FOR STEAM SYSTEM. |
25-Aug-2006 05:33:09 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 05:00 FOR STEAM SECURITY. |
25-Aug-2006 05:49:12 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 05:00 FOR STEAM SYSTEM SECURITY. |
25-Aug-2006 06:14:13 | 08/25/2006 06:11:20 NYISO large event reserve pick-up executed. |
25-Aug-2006 06:28:03 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 06:00 FOR STEAM SYSTEM. |
25-Aug-2006 06:28:20 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 06:00 FOR STEAM SECURITY. |
25-Aug-2006 07:08:32 | 08/25/2006 07:06:46 NYISO large event reserve pick-up executed. |
25-Aug-2006 08:17:11 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/24/2006 00:00 FOR TSA (SJ) modified original OOM to accommodate SRE Entry. Original Type: Gen Derate, Original Log: Single Leg Operation. |
25-Aug-2006 09:10:33 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 09:00 FOR East end loading.. |
25-Aug-2006 09:10:47 | Metering Authority - Long Island Power Authority UPDATES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 09:00 FOR East end loading.. |
25-Aug-2006 10:32:01 | Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 10:00 FOR Loss of bank 6 on Valley Stream 361 line.. |
25-Aug-2006 11:03:03 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/25/2006 11:00 FOR System over gen due to TSA. |
25-Aug-2006 11:14:01 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/25/2006 11:00. |
25-Aug-2006 13:41:31 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 13:00 FOR STEAM SYSTEM SECURITY. |
25-Aug-2006 15:39:09 | PJM initiated curtailment cut 354 MWs. |
25-Aug-2006 15:45:45 | PJM initiated curtailment cut 360 MWs. |
25-Aug-2006 16:00:56 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/25/2006 16:00 FOR IMO TLR caused large schedule change. |
25-Aug-2006 16:05:33 | PJM initiated curtailment cut 374 MWs. |
25-Aug-2006 16:10:14 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/25/2006 16:00. |
25-Aug-2006 19:19:36 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 19:00 FOR STEAM SYSTEM. |
25-Aug-2006 19:19:55 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 19:00 FOR STEAM SECURITY. |
25-Aug-2006 20:26:43 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 20:00 FOR STEAM SYSTEM. |
25-Aug-2006 20:27:17 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 20:00 FOR STEAM SECURITY. |
25-Aug-2006 21:57:49 | Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 21:00 FOR Loss of bank 6 on Valley Stream 361 line.. |
25-Aug-2006 21:58:31 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 21:00. |
25-Aug-2006 22:53:28 | NYISO Locational based curtailment cut 150 MWs. |
25-Aug-2006 23:58:48 | Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/25/2006 23:00. |
Insert Time | Message |
25-Aug-2006 11:28:33 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 08/26/2006 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 11:28:34 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 08/26/2006 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 11:28:34 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 08/26/2006 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 11:28:34 | Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 08/26/2006 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 11:29:26 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 08/26/2006 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 11:31:01 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 08/26/2006 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 11:31:01 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 08/26/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 11:37:20 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 08/26/2006 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 11:37:20 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 08/26/2006 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 11:37:20 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 08/26/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 11:37:20 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 08/26/2006 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:03 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:03 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:03 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:03 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:03 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:04 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:04 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:04 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:04 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:04 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:04 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:04 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:04 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:04 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:04 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:04 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:04 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:05 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:05 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:05 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:05 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:05 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:05 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Aug-2006 13:28:05 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/26/2006 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |