P-2522-Aug-2006

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
22-Aug-2006 00:20:43Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 00:00 FOR Post cont cascading for the loss of Gardenville tower.
22-Aug-2006 00:21:21Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 00:00 FOR Post cont cascading for the loss of Gardenville tower.
22-Aug-2006 00:29:37Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 00:00 FOR Post cont cascading for the loss of Gardenville tower.
22-Aug-2006 00:29:57Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 00:00 FOR Post cont cascading for the loss of Gardenville tower.
22-Aug-2006 00:31:51Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 00:00 FOR STEAM SECURITY.
22-Aug-2006 00:32:10Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 00:00 FOR STEAM SYSTEM.
22-Aug-2006 02:04:40Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 02:00 FOR Post cont cascading for the loss of Gardenville tower.
22-Aug-2006 02:05:02Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 02:00 FOR Post cont cascading for the loss of Gardenville tower.
22-Aug-2006 06:03:48Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 06:00 FOR Post cont cascading for the loss of Gardenville tower.
22-Aug-2006 06:04:04Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 06:00 FOR Post cont cascading for the loss of Gardenville tower.
22-Aug-2006 06:07:46Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 06:00 FOR STEAM SECURITY.
22-Aug-2006 06:08:09Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 06:00 FOR STEAM SYSTEM.
22-Aug-2006 06:16:29Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 06:00 FOR Post cont cascading for the loss of Gardenville tower.
22-Aug-2006 06:16:43Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 06:00 FOR Post cont cascading for the loss of Gardenville tower.
22-Aug-2006 06:23:18Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 06:00 FOR STEAM SECURITY.
22-Aug-2006 06:23:44Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 06:00 FOR STEAM SYSTEM.
22-Aug-2006 06:49:34Metering Authority - Niagara Mohawk REMOVES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 06:00.
22-Aug-2006 06:49:59Metering Authority - Niagara Mohawk REMOVES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 06:00.
22-Aug-2006 07:31:57Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 07:00 FOR STEAM SYSTEM SECURITY.
22-Aug-2006 08:12:12Metering Authority - Long Island Power Authority UPDATES NORTHPORT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/21/2006 23:00 FOR TSA (SJ) modified original OOM to accommodate SRE Entry. Original Type: Gen Derate, Original Log: Unit Tripped.
22-Aug-2006 08:14:11Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/21/2006 00:00 FOR TSA (SJ) modified existing OOM to accommodate SRE entry. Original Type: Gen Derate, Original Log: Boiler Tube Limitation.
22-Aug-2006 09:57:56Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 09:00 FOR EAST END LOAD.
22-Aug-2006 12:30:30Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 12:00 FOR EAST END LOAD.
22-Aug-2006 13:05:09Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 13:00 FOR STEAM SYSTEM SECURITY.
22-Aug-2006 14:07:22ISO REQUESTS ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/22/2006 14:00 FOR ACTUAL OVERLOADS.
22-Aug-2006 14:11:53Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 14:00 FOR East End Load.
22-Aug-2006 14:12:11Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 14:00.
22-Aug-2006 14:12:24Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 14:00.
22-Aug-2006 14:41:31ISO REMOVES ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/22/2006 14:00.
22-Aug-2006 18:10:02ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/22/2006 18:00 FOR ACE +450 MW.
22-Aug-2006 18:13:30ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/22/2006 18:00.
22-Aug-2006 21:11:32Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 21:00 FOR STEAM SECURITY.
22-Aug-2006 21:11:51Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 21:00 FOR STEAM SYSTEM.
22-Aug-2006 21:18:54Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 22:00.
22-Aug-2006 21:44:58Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/22/2006 21:00 FOR STEAM SYSTEM SECURITY.

Committed for Reliability

Back to top
Insert TimeMessage
22-Aug-2006 01:04:41Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:42Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:43Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:43Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:43Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:43Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:43Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:43Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:43Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:43Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:43Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:43Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:44Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:44Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:44Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:44Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:44Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:44Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:44Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:44Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 01:04:44Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/22/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 10:50:39Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 08/23/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 10:51:02Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 08/23/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:32Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:32Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:32Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 05 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:32Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 07 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:32Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 08 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:32Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 06 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:32Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:32Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:32Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:33Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 11 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:33Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 10 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:33Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 09 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:33Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 20 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:33Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 19 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:33Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 18 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:33Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 17 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:33Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 16 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:33Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 15 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:33Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 14 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:33Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 13 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:33Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 12 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:34Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 21 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:34Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:29:34Generator: HUNTLEY___65 scheduled for local reliability in DAM market for 08/23/2006 22 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:45:22Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/23/2006 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:45:22Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/23/2006 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:45:22Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/23/2006 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:45:22Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/23/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:45:56Generator: ASTORIA___5 scheduled for local reliability in DAM market for 08/23/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:46:27Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/23/2006 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:46:27Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/23/2006 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:46:27Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/23/2006 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
22-Aug-2006 11:46:27Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/23/2006 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
22-Aug-2006 16:11:19Prices in the August 21, 2006 Real-Time Market encompassing Energy, Regulation and Operating Reserves are correct. Prices in the August 21, 2006 Hour-Ahead Market are correct. Prices in the August 23, 2006 Day-Ahead Market are correct.