Insert Time | Message |
04-Aug-2006 00:15:14 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 00:00 FOR STEAM SYSTEM. |
04-Aug-2006 00:15:54 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 00:00 FOR STEAM SECURITY. |
04-Aug-2006 02:25:35 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 02:00 FOR STEAM SEND OUT. |
04-Aug-2006 02:40:20 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 02:00. |
04-Aug-2006 02:40:35 | Metering Authority - Long Island Power Authority UPDATES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 02:00 FOR . Record deleted in current hour.. |
04-Aug-2006 05:41:59 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 05:00 FOR STEAM SEND OUT. |
04-Aug-2006 06:25:35 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 06:00 FOR STEAM SEND OUT. |
04-Aug-2006 06:28:29 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 06:00 FOR STEAM SYSTEM. |
04-Aug-2006 06:31:27 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 06:00 FOR STEAM SECURITY. |
04-Aug-2006 07:20:51 | 08/04/2006 07:17:20 NYISO large event reserve pick-up executed. |
04-Aug-2006 07:39:21 | Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 07:00 FOR EAST END 69KV SECURITY. |
04-Aug-2006 07:51:47 | ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2006 07:00 FOR 262 ACTUAL. |
04-Aug-2006 07:53:13 | ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2006 07:00 FOR 262 ACTUAL. |
04-Aug-2006 08:25:20 | ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2006 08:00. |
04-Aug-2006 08:26:45 | ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2006 08:00. |
04-Aug-2006 09:29:45 | Metering Authority - Orange and Rockland Utilities REQUESTS SHOEMAKER___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 10:00 FOR O&R LOCAL LOAD. |
04-Aug-2006 09:31:17 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 09:00 FOR EAST END SECURITY. |
04-Aug-2006 10:15:15 | 08/04/2006 10:10:38 NYISO large event reserve pick-up executed. |
04-Aug-2006 10:36:46 | Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 10:00 FOR East End Load. |
04-Aug-2006 11:07:30 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 11:00 FOR EAST END SECURITY. |
04-Aug-2006 12:15:44 | ISO REQUESTS POLETTI____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2006 12:00 FOR DERATED LIMITS NOT CLEARING AFTER DERATE CLEARED. |
04-Aug-2006 12:29:14 | Metering Authority - Long Island Power Authority UPDATES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 12:00 FOR East End Load. |
04-Aug-2006 13:32:56 | NPX initiated curtailment cut 100 MWs. |
04-Aug-2006 14:21:31 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 14:00 FOR STEAM SEND OUT. |
04-Aug-2006 14:55:07 | ISO REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2006 14:00 FOR 367/368 P/C LOADING. |
04-Aug-2006 15:36:15 | ISO REMOVES FAR ROCKAWAY___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2006 15:00. |
04-Aug-2006 16:05:58 | Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 16:00 FOR EAST END SECURITY. |
04-Aug-2006 16:09:15 | ISO REQUESTS HUNTLEY___67 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2006 16:00 FOR FOR VOLTAGE SUPPORT. |
04-Aug-2006 18:15:31 | ISO REMOVES HUNTLEY___67 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2006 18:00. |
04-Aug-2006 18:19:54 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 18:00 FOR STEAM SECURITY. |
04-Aug-2006 18:20:15 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 18:00 FOR STEAM SYSTEM. |
04-Aug-2006 18:52:15 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 18:00 FOR STEAM SEND OUT. |
04-Aug-2006 19:12:27 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2006 19:00 FOR ACE +400 - LOAD DROPPING OUT QUICKLY. REDUCED NIAGARA -250 MWS.. |
04-Aug-2006 19:21:03 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 08/04/2006 19:00. |
04-Aug-2006 20:06:21 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 20:00 FOR STEAM SYSTEM. |
04-Aug-2006 20:06:33 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 20:00 FOR STEAM SECURITY. |
04-Aug-2006 20:15:15 | Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 20:00. |
04-Aug-2006 21:26:11 | Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 21:00. |
04-Aug-2006 21:26:50 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 21:00 FOR STEAM SYSTEM. |
04-Aug-2006 21:27:09 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 21:00 FOR STEAM SECURITY. |
04-Aug-2006 22:39:53 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 08/04/2006 22:00. |
Insert Time | Message |
04-Aug-2006 11:52:33 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:33 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:33 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:33 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:33 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:33 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:33 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:33 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:33 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:34 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:34 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:34 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:34 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:34 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:34 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:34 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:34 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:34 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:34 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:34 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:34 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:34 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:35 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:52:35 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 08/05/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:53:09 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/05/2006 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:53:09 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/05/2006 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 11:53:09 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 08/05/2006 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 12:28:32 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/05/2006 10 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 12:28:32 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/05/2006 09 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 12:28:33 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/05/2006 11 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 12:28:33 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/05/2006 12 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 12:28:33 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/05/2006 14 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 12:28:33 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/05/2006 17 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 12:28:33 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/05/2006 16 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 12:28:33 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/05/2006 15 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 12:28:33 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/05/2006 13 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 12:28:33 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/05/2006 18 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 12:28:33 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/05/2006 21 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 12:28:33 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/05/2006 20 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
04-Aug-2006 12:28:33 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 08/05/2006 19 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |