P-2520-Jun-2006

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
20-Jun-2006 04:47:45Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 04:00 FOR CON ED SYSTEM STEAM.
20-Jun-2006 05:19:22Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 05:00 FOR CON ED SYSTEM STEAM.
20-Jun-2006 05:19:45Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 05:00 FOR steam.
20-Jun-2006 06:43:03Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 06:00 FOR CON EDISON STEAM SENDOUT..
20-Jun-2006 07:37:38Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 07:00 FOR CON ED SYSTEM STEAM.
20-Jun-2006 07:37:52Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 07:00 FOR steam.
20-Jun-2006 07:38:43Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 07:00 FOR CON EDISON STEAM SENDOUT..
20-Jun-2006 09:02:41Metering Authority - Orange and Rockland Utilities UPDATES BOWLINE___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 06:00 FOR prev code(GenDereate),Modifiedexisting OOM to accommodate SRE entry. Start up trouble with volage regulator. SRE entered by TSA PV.
20-Jun-2006 10:10:58ISO REQUESTS PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 10:00 FOR OVER POST CONTINGENCY LTE ON 871 FOR LOSS OF 881/882 TWR..
20-Jun-2006 10:21:58ISO UPDATES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 10:00 FOR OVER POST CONTINGENCY LTE ON 871 FOR LOSS OF 881/882 TWR..
20-Jun-2006 10:33:33ISO REQUESTS ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 10:00 FOR CON EDISON FAST LOAD PICKUP CALLED FOR POST CONTINGENCY VIOLATIONS AND ACTUAL OVERLOADS IN NYC (AND FOR 91/92 OVER POST CONT AS WELL)..
20-Jun-2006 10:34:05ISO REQUESTS ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 10:00 FOR CON EDISON FAST LOAD PICKUP CALLED FOR POST CONTINGENCY VIOLATIONS AND ACTUAL OVERLOADS IN NYC (AND FOR 91/92 OVER POST CONT AS WELL)..
20-Jun-2006 10:34:31ISO REQUESTS ASTORIA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 10:00 FOR CON EDISON FAST LOAD PICKUP CALLED FOR POST CONTINGENCY VIOLATIONS AND ACTUAL OVERLOADS IN NYC (AND FOR 91/92 OVER POST CONT AS WELL)..
20-Jun-2006 10:34:47ISO UPDATES ASTORIA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 10:00 FOR CON EDISON FAST LOAD PICKUP CALLED FOR POST CONTINGENCY VIOLATIONS AND ACTUAL OVERLOADS IN NYC (AND FOR 91/92 OVER POST CONT AS WELL)..
20-Jun-2006 10:35:02ISO UPDATES ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 10:00 FOR CON EDISON FAST LOAD PICKUP CALLED FOR POST CONTINGENCY VIOLATIONS AND ACTUAL OVERLOADS IN NYC (AND FOR 91/92 OVER POST CONT AS WELL)..
20-Jun-2006 10:37:54ISO UPDATES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 10:00 FOR OVER POST CONTINGENCY LTE ON 871 FOR LOSS OF 881/882 TWR..
20-Jun-2006 12:14:57Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 12:00 FOR CON EDISON STEAM SEND OUT..
20-Jun-2006 12:16:37ISO REMOVES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 12:00.
20-Jun-2006 12:16:43ISO REMOVES ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 12:00.
20-Jun-2006 12:16:48ISO REMOVES ASTORIA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 12:00.
20-Jun-2006 13:01:24ISO REMOVES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 13:00.
20-Jun-2006 14:02:00Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 14:00 FOR EAST END 69 KV SUPPORT..
20-Jun-2006 14:33:11Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 14:00 FOR steam.
20-Jun-2006 14:39:53Metering Authority - New York State Electric & Gas REQUESTS NEG CENTRAL___STATE_STREET OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 14:00 FOR OVER LTE ON 972 ELBRIDGE-STATE_ST..
20-Jun-2006 16:20:2206/20/2006 16:17:19 NYISO large event reserve pick-up executed.
20-Jun-2006 16:40:21ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 17:00 FOR UNIT SCHEDULED ON BY RTC FOR 1700, KEEPING UNIT OFFLINE @ 0 FOR T.S.A..
20-Jun-2006 17:11:20ISO REQUESTS ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 17:00 FOR 15053 OVER NORMAL. DERATING DOWN TO UNLOAD POCKET..
20-Jun-2006 17:22:58ISO REQUESTS ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 17:00 FOR 15053 OVER NORMAL..
20-Jun-2006 17:37:43ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 18:00 FOR T.S.A. - KEEPING UNIT OFFLINE DUE TO 91 FOR LOSS OF 92 AND VICE VERSA..
20-Jun-2006 18:12:16ISO REMOVES ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 18:00.
20-Jun-2006 18:12:24ISO REMOVES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 18:00.
20-Jun-2006 19:23:48Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 19:00 FOR CON ED SYSTEM STEAM.
20-Jun-2006 19:24:08Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 19:00 FOR steam.
20-Jun-2006 19:27:27ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 21:00.
20-Jun-2006 19:27:42ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2006 21:00.
20-Jun-2006 21:38:49Metering Authority - Consolidated Edison of NY REMOVES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 21:00.
20-Jun-2006 23:33:30Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2006 23:00 FOR CON ED SYSTEM STEAM.

Committed for Reliability

Back to top
Insert TimeMessage
20-Jun-2006 10:47:39Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/21/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 10:47:54Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/21/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 10:48:14Generator: POLETTI____ scheduled for local reliability in DAM market for 06/21/2006 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 10:48:27Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/21/2006 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 10:48:27Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/21/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 10:48:27Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/21/2006 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 10:48:47Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/21/2006 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 10:48:48Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/21/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 10:48:59Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/21/2006 23 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 10:49:13Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/21/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:42Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 00 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 01 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 02 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 05 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 04 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 03 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 06 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 08 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 10 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 14 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 13 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 12 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 11 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 09 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 07 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 15 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 18 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 19 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 17 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 11:29:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/21/2006 16 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:16Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:16Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:16Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:16Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:16Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:18Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:18Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:18Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
20-Jun-2006 21:16:18Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/21/2006 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
20-Jun-2006 16:07:48NYISO is reserving hours beginning 10 - 14, 16 and 21 in the June 19, 2006 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. Prices in the June 19, 2006 Hour-Ahead Market are correct. Prices in the June 21, 2006 Day-Ahead Market are correct.