Insert Time | Message |
25-Jun-2006 00:02:02 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 00:00 FOR Steam sendout. |
25-Jun-2006 00:02:18 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 00:00 FOR steam. |
25-Jun-2006 00:07:19 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 00:00 FOR STEAM SYSTEM SENDOUT PER CON EDISON. |
25-Jun-2006 00:49:23 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 00:00 FOR Steam sendout. |
25-Jun-2006 00:49:38 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 00:00 FOR steam. |
25-Jun-2006 00:50:09 | Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 00:00. |
25-Jun-2006 01:36:08 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 01:00 FOR Steam sendout. |
25-Jun-2006 01:36:28 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 01:00 FOR steam. |
25-Jun-2006 02:14:02 | PJM initiated curtailment cut 300 MWs. |
25-Jun-2006 02:37:43 | ISO REQUESTS RAVENSWOOD___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/25/2006 02:00 FOR OOM (SRE'D) BY CON EDISON FOR SYSTEM RELIABILITY.. |
25-Jun-2006 02:37:57 | ISO UPDATES RAVENSWOOD___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/25/2006 02:00 FOR OOM (SRE'D) BY CON EDISON FOR SYSTEM RELIABILITY.. |
25-Jun-2006 02:49:20 | ISO UPDATES RAVENSWOOD___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/25/2006 02:00 FOR OOM (SRE'D) BY CON EDISON FOR SYSTEM RELIABILITY.. |
25-Jun-2006 07:35:10 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 07:00 FOR Steam sendout. |
25-Jun-2006 07:35:32 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 07:00 FOR steam. |
25-Jun-2006 07:35:54 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 07:00 FOR STEAM SYSTEM SENDOUT PER CON EDISON.. |
25-Jun-2006 08:17:11 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 08:00 FOR Steam sendout. |
25-Jun-2006 08:17:36 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 08:00 FOR steam. |
25-Jun-2006 08:36:31 | Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 08:00 FOR P/C LOADING ON BK5 69KV. |
25-Jun-2006 09:32:29 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 09:00 FOR STEAM SYSTEM SENDOUT PER CON EDISON.. |
25-Jun-2006 11:58:48 | Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 11:00 FOR P/C LOADING ON BK5 69KV. |
25-Jun-2006 12:11:21 | Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 12:00 FOR P/C LOADING ON BK5 69KV. |
25-Jun-2006 13:13:46 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 13:00 FOR STEAM SYSTEM SENDOUT PER CON EDISON.. |
25-Jun-2006 15:07:55 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 15:00 FOR STEAM SYSTEM SENDOUT PER CON EDISON.. |
25-Jun-2006 17:54:33 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 17:00 FOR STEAM SYSTEM SENDOUT PER CON EDISON.. |
25-Jun-2006 19:09:03 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 19:00 FOR Steam sendout. |
25-Jun-2006 19:09:22 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 19:00 FOR steam. |
25-Jun-2006 22:21:58 | Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/25/2006 23:00. |
Insert Time | Message |
25-Jun-2006 02:35:40 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:41 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:42 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:42 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:42 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:42 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:42 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:42 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:42 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 02:35:42 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/25/2006 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:11 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 00 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:11 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 01 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 02 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 10 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 15 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 14 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 13 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 12 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 11 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 09 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 04 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 06 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 07 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 08 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 05 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:12 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 03 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:13 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 16 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:13 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:13 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:13 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:13 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 18 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:13 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 19 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:13 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 10:26:13 | Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/26/2006 17 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 11:23:07 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 06/26/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 11:25:26 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/26/2006 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 11:25:26 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/26/2006 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 11:25:26 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/26/2006 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 11:25:26 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/26/2006 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 12:01:41 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/26/2006 23 Energy = 37 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
25-Jun-2006 12:02:22 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/26/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |