Insert Time | Message |
09-Jun-2006 01:43:57 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 01:00 FOR STEAM SENDOUT. |
09-Jun-2006 05:14:19 | ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 05:00 FOR contingencies. |
09-Jun-2006 05:14:45 | ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 05:00 FOR contingencies. |
09-Jun-2006 05:57:58 | ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 05:00. |
09-Jun-2006 06:15:59 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 06:00 FOR Steam send out. |
09-Jun-2006 06:21:39 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 06:00 FOR Steam send out. |
09-Jun-2006 06:22:29 | Metering Authority - Niagara Mohawk REMOVES DUNKIRK___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 06:00. |
09-Jun-2006 07:02:53 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 07:00 FOR Steam send out. |
09-Jun-2006 07:04:31 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 07:00 FOR STEAM SENDOUT. |
09-Jun-2006 07:26:09 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 07:00 FOR 461 over actual. |
09-Jun-2006 07:26:18 | ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 07:00. |
09-Jun-2006 07:26:38 | ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 08:00 FOR 461 over actual. |
09-Jun-2006 07:39:44 | ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 07:00 FOR Over Actual on 461. |
09-Jun-2006 07:40:03 | ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 08:00 FOR Over Actual on 461. |
09-Jun-2006 07:40:14 | ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 09:00 FOR Over Actual on 461. |
09-Jun-2006 09:15:55 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 09:00 FOR CON EDISON STEAM SYSTEM SECURITY.. |
09-Jun-2006 09:18:37 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 09:00 FOR CON EDISON STEAM SYSTEM SECURITY.. |
09-Jun-2006 09:37:04 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 09:00 FOR CON EDISON STEAM SYSTEM SECURITY.. |
09-Jun-2006 09:38:29 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 09:00 FOR 461 over actual. |
09-Jun-2006 09:38:44 | ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 09:00 FOR Over Actual on 461. |
09-Jun-2006 09:40:14 | Metering Authority - Niagara Mohawk UPDATES INDECK___OLEAN OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/08/2006 00:00 FOR SRE entered by TSA (LE)
Modified Original Record: Type: Local Security
Log: BK41 over at Dunkirk. |
09-Jun-2006 09:41:16 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 09:00 FOR 461 over actual. |
09-Jun-2006 09:41:38 | ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 09:00 FOR Over Actual on 461. |
09-Jun-2006 09:51:11 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 09:00 FOR Steam send out. |
09-Jun-2006 09:54:00 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 09:00 FOR Steam send out. |
09-Jun-2006 09:57:45 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 09:00 FOR Steam send out. |
09-Jun-2006 10:23:39 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 10:00 FOR 461 over actual. |
09-Jun-2006 10:23:51 | ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 10:00 FOR Over Actual on 461. |
09-Jun-2006 11:33:14 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 11:00 FOR Steam send out. |
09-Jun-2006 18:32:37 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 18:00 FOR CON EDISON STEAM SYSTEM SECURITY.. |
09-Jun-2006 18:33:47 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 18:00 FOR Steam send out. |
09-Jun-2006 18:34:01 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 18:00 FOR CON EDISON STEAM SYSTEM SECURITY.. |
09-Jun-2006 18:48:39 | ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 18:00. |
09-Jun-2006 18:48:50 | ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2006 18:00. |
09-Jun-2006 20:15:50 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 20:00 FOR CON EDISON STEAM SYSTEM SECURITY.. |
09-Jun-2006 20:16:10 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 20:00 FOR Steam send out. |
09-Jun-2006 20:33:12 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 20:00 FOR Steam send out. |
09-Jun-2006 20:33:29 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2006 20:00 FOR CON EDISON STEAM SYSTEM SECURITY.. |
Insert Time | Message |
09-Jun-2006 12:24:17 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:17 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:17 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:17 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:18 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:18 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:18 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:18 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:18 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:18 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:18 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:18 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:18 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:18 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:19 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:19 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:19 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:19 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:19 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:19 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:19 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:19 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:19 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:19 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/10/2006 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:42 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 00 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:42 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 02 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:42 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 03 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:42 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 05 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:42 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 07 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:42 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 09 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:42 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 10 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:42 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 08 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:42 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 06 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:42 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 04 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:42 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 01 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:43 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 11 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:43 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 15 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:43 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 17 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:43 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 19 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:43 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:43 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:43 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:43 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:43 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 18 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:43 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 16 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:43 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 14 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:43 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 12 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:43 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2006 13 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
09-Jun-2006 12:24:59 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 06/10/2006 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |