P-2519-Jun-2006

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
19-Jun-2006 00:24:16Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 00:00 FOR steam.
19-Jun-2006 01:08:17Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 01:00 FOR CON ED SYSTEM STEAM.
19-Jun-2006 01:58:15Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 01:00 FOR CON ED SYSTEM STEAM.
19-Jun-2006 02:13:25OH initiated curtailment cut 37 MWs. MISO TLR CUT FOR 0220
19-Jun-2006 03:44:54Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 03:00 FOR CON ED SYSTEM STEAM.
19-Jun-2006 03:45:29Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 03:00 FOR steam.
19-Jun-2006 05:12:57Metering Authority - Niagara Mohawk REMOVES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 05:00.
19-Jun-2006 05:35:54Metering Authority - Niagara Mohawk REMOVES DUNKIRK___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 05:00.
19-Jun-2006 05:58:22Metering Authority - Niagara Mohawk REMOVES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 05:00.
19-Jun-2006 07:32:25Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 07:00 FOR CON ED SYSTEM STEAM.
19-Jun-2006 07:32:42Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 07:00 FOR steam.
19-Jun-2006 08:15:13Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 08:00 FOR CON EDISON STEAM SENDOUT..
19-Jun-2006 08:15:27Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 08:00 FOR CON EDISON STEAM SENDOUT..
19-Jun-2006 09:57:17ISO REQUESTS PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/19/2006 09:00 FOR 871 FOR LOSS OF 881/882 OVER POST CONT LTE..
19-Jun-2006 09:57:30Metering Authority - Consolidated Edison of NY UPDATES ASTORIA___5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/17/2006 23:00 FOR Prev code(Commited for ISO Reliability), Modified existing OOM to Accommodate SRE entry. Loss of W89/W90 onto 99941 over LTE. SRE entered by tsa PV..
19-Jun-2006 10:03:02ISO UPDATES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/19/2006 10:00 FOR 871 FOR LOSS OF 881/882 OVER POST CONT LTE..
19-Jun-2006 10:11:17ISO UPDATES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/19/2006 10:00 FOR 871 FOR LOSS OF 881/882 OVER POST CONT LTE..
19-Jun-2006 10:43:31Metering Authority - Consolidated Edison of NY REMOVES ASTORIA___5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/17/2006 23:00.
19-Jun-2006 15:02:40Metering Authority - Niagara Mohawk REQUESTS BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 15:00 FOR BETHLEHEM # 10 AVENUE A, #14 DELAWARE AVE OVER NORMAL..
19-Jun-2006 15:03:07Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 15:00 FOR BETHLEHEM # 10 AVENUE A, #14 DELAWARE AVE OVER NORMAL..
19-Jun-2006 16:05:45Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 16:00 FOR BETHLEHEM # 10 AVENUE A, #14 DELAWARE AVE OVER NORMAL..
19-Jun-2006 16:05:54Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 16:00 FOR BETHLEHEM # 10 AVENUE A, #14 DELAWARE AVE OVER NORMAL..
19-Jun-2006 18:09:54ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/19/2006 18:00 FOR TAKEN OFFLINE PER NYISO REQUEST FOR T.S.A..
19-Jun-2006 18:14:48ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/19/2006 18:00 FOR T.S.A..
19-Jun-2006 19:17:27Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 19:00 FOR CON ED SYSTEM STEAM.
19-Jun-2006 19:17:44Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 19:00 FOR steam.
19-Jun-2006 20:10:15ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/19/2006 20:00.
19-Jun-2006 20:10:29ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/19/2006 20:00.
19-Jun-2006 20:49:33ISO REMOVES PORT_JEFF_4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/19/2006 20:00.
19-Jun-2006 22:11:26Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 22:00 FOR CON ED SYSTEM STEAM.
19-Jun-2006 22:11:39Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 22:00 FOR CON ED SYSTEM STEAM.
19-Jun-2006 22:15:00Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 22:00 FOR BETHLEHEM # 10 AVENUE A, #14 DELAWARE AVE OVER NORMAL..
19-Jun-2006 22:15:14Metering Authority - Niagara Mohawk UPDATES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 22:00 FOR BETHLEHEM # 10 AVENUE A, #14 DELAWARE AVE OVER NORMAL..
19-Jun-2006 23:31:57Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 23:00.
19-Jun-2006 23:32:06Metering Authority - Niagara Mohawk REMOVES BETHLEHEM___GS3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/19/2006 23:00.

Committed for Reliability

Back to top
Insert TimeMessage
19-Jun-2006 11:08:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 00 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 02 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 01 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 03 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:43Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 04 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 05 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 07 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 10 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 09 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 08 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 06 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 11 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 16 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 15 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 14 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 13 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:44Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 12 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:45Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 17 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:45Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 18 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:45Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 19 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:45Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:45Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:45Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:08:45Generator: BOWLINE___2 scheduled for local reliability in DAM market for 06/20/2006 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:12:02Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/20/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:12:13Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/20/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 11:12:33Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/20/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 12:00:46Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/20/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 12:01:22Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/20/2006 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 12:01:22Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/20/2006 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 12:01:22Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/20/2006 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
19-Jun-2006 12:27:17Generator: ASTORIA___5 scheduled for local reliability in DAM market for 06/20/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
19-Jun-2006 16:43:54NYISO is reserving hours beginning 14, 15 and 22 in the June 18, 2006 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. NYISO is reserving hour beginning 06 in the June 18, 2006 Hour-Ahead Market. Prices in the June 20, 2006 Day-Ahead Market are correct.