| Insert Time | Message |
| 16-Mar-2006 00:36:28 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 00:00 FOR STEAM SYSTEM SECURITY. |
| 16-Mar-2006 00:36:58 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 00:00 FOR STEAM SYSTEM SECURITY. |
| 16-Mar-2006 02:23:14 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 02:00 FOR STEAM SYSTEM SECURITY. |
| 16-Mar-2006 02:24:39 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 02:00 FOR STEAM SYSTEM SECURITY. |
| 16-Mar-2006 04:15:23 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 04:00 FOR STEAM SYSTEM SECURITY. |
| 16-Mar-2006 04:15:44 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 04:00 FOR STEAM SYSTEM SECURITY. |
| 16-Mar-2006 06:05:06 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 06:00 FOR STEAM SYSTEM SECURITY. |
| 16-Mar-2006 06:05:28 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 06:00 FOR STEAM SYSTEM SECURITY. |
| 16-Mar-2006 06:10:24 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 06:00 FOR STEAM SYSTEM SECURITY. |
| 16-Mar-2006 06:10:42 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 06:00 FOR STEAM SYSTEM SECURITY. |
| 16-Mar-2006 06:20:15 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 06:00 FOR STEAM SYSTEM SECURITY. |
| 16-Mar-2006 06:20:31 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 06:00 FOR STEAM SYSTEM SECURITY. |
| 16-Mar-2006 11:32:54 | Metering Authority - Long Island Power Authority UPDATES NORTHPORT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/15/2006 12:00 FOR Modified existing OOM to accommodate SRE entry (SJ). Original Type: Gen Derate, Original Log: Late coming On.. |
| 16-Mar-2006 11:44:50 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 11:00 FOR 69kv contingencies. |
| 16-Mar-2006 11:45:27 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 11:00 FOR 69kv contingencies. |
| 16-Mar-2006 12:41:23 | ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 03/16/2006 12:00 FOR LI conitngencies. |
| 16-Mar-2006 13:39:37 | ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 03/16/2006 13:00. |
| 16-Mar-2006 14:22:09 | Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 14:00. |
| 16-Mar-2006 14:39:27 | Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 14:00. |
| 16-Mar-2006 16:57:07 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 03/16/2006 16:00 FOR STEAM SYSTEM SECURITY. |
| Insert Time | Message |
| 16-Mar-2006 10:57:30 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 03/17/2006 14 Energy = 110 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:57:30 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 03/17/2006 15 Energy = 110 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:57:30 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 03/17/2006 16 Energy = 110 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:57:30 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 03/17/2006 19 Energy = 110 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:57:30 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 03/17/2006 18 Energy = 110 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:57:30 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 03/17/2006 17 Energy = 110 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:57:30 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 03/17/2006 20 Energy = 110 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:57:30 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 03/17/2006 22 Energy = 110 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:57:30 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 03/17/2006 23 Energy = 110 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:57:30 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 03/17/2006 21 Energy = 110 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:25 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:25 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:25 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:25 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:25 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:25 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:25 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:26 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:26 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:26 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:26 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:26 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:26 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:27 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:27 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:27 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:27 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:27 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:27 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:28 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:28 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:28 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:28 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:58:28 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 03/17/2006 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 10:59:09 | Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 03/17/2006 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:49 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:49 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:49 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:49 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:49 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:49 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:49 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:49 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:49 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:49 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 16-Mar-2006 11:09:49 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 03/17/2006 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |