P-2515-Feb-2006

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
15-Feb-2006 04:56:52Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 04:00 FOR steam system sendout.
15-Feb-2006 04:57:19Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 04:00 FOR STEAM SENDOUT..
15-Feb-2006 04:59:41Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 04:00 FOR STEAM SENDOUT..
15-Feb-2006 04:59:57Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 04:00 FOR steam system sendout.
15-Feb-2006 05:00:57Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 05:00 FOR steam system sendout.
15-Feb-2006 05:01:35Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 05:00 FOR STEAM SENDOUT..
15-Feb-2006 05:06:46Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 05:00 FOR STEAM SENDOUT..
15-Feb-2006 05:13:15Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 05:00 FOR steam system sendout.
15-Feb-2006 05:22:55Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 05:00 FOR Steam send out.
15-Feb-2006 05:35:00Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 05:00 FOR Steam send out.
15-Feb-2006 05:38:19Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 05:00 FOR Steam send out.
15-Feb-2006 05:42:11Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 05:00 FOR steam system sendout.
15-Feb-2006 05:42:43Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 05:00 FOR STEAM SENDOUT..
15-Feb-2006 08:38:36ISO UPDATES HUNTLEY___66 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/15/2006 08:00 FOR unit shut off/on by rtc.
15-Feb-2006 09:14:07Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 09:00 FOR STEAM SENDOUT..
15-Feb-2006 09:14:23Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 09:00 FOR steam system sendout.
15-Feb-2006 09:14:48Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 09:00 FOR STEAM SENDOUT..
15-Feb-2006 09:15:34Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 09:00 FOR steam system sendout.
15-Feb-2006 09:41:45ISO UPDATES HUNTLEY___66 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 02/15/2006 09:00 FOR .
15-Feb-2006 09:44:54ISO UPDATES HUNTLEY___66 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/15/2006 09:00 FOR .
15-Feb-2006 09:46:24ISO UPDATES HUNTLEY___66 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/15/2006 09:00 FOR unit being shut on/off by RTC.
15-Feb-2006 10:42:47ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/15/2006 10:00 FOR Real time over on 262.
15-Feb-2006 11:31:30ISO REMOVES HUNTLEY___66 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/15/2006 11:00.
15-Feb-2006 11:43:30ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/15/2006 11:00 FOR Real time over on 262.
15-Feb-2006 12:18:09ISO UPDATES HUNTLEY___66 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/15/2006 12:00 FOR cycling on/off.
15-Feb-2006 12:18:22ISO REQUESTS HUNTLEY___66 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/15/2006 13:00 FOR cycling on/off.
15-Feb-2006 13:00:48Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 13:00 FOR STEAM SENDOUT..
15-Feb-2006 13:01:12Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 13:00 FOR steam system sendout.
15-Feb-2006 17:14:46Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 17:00 FOR STEAM SENDOUT..
15-Feb-2006 17:15:06Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 17:00 FOR steam system sendout.
15-Feb-2006 18:50:22Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 18:00 FOR steam system sendout.
15-Feb-2006 18:50:43Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 18:00 FOR STEAM SENDOUT..
15-Feb-2006 19:59:16Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 19:00 FOR STEAM SENDOUT..
15-Feb-2006 19:59:36Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 19:00 FOR steam system sendout.
15-Feb-2006 21:14:04ISO REMOVES HUNTLEY___66 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/15/2006 21:00.
15-Feb-2006 21:49:17Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 21:00 FOR STEAM SENDOUT..
15-Feb-2006 21:49:39Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/15/2006 21:00 FOR steam system sendout.
15-Feb-2006 22:02:59ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 02/15/2006 22:00.

Committed for Reliability

Back to top
Insert TimeMessage
15-Feb-2006 11:05:31Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 02/16/2006 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:00Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:01Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:01Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:01Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:02Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:02Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:02Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:02Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:02Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:02Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:02Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:02Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:02Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:02Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:02Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:03Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:03Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:03Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:03Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:03Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:03Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:03Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:03Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:03:03Generator: ASTORIA___4 scheduled for local reliability in DAM market for 02/16/2006 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:00Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 00 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 01 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 03 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 02 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 04 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 06 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 08 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 10 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 12 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 14 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 13 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 11 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 09 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 07 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:01Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 05 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:02Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 15 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:02Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 20 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:02Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:02Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:02Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:02Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 19 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:02Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 16 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:02Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 18 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:02Generator: POLETTI____ scheduled for local reliability in DAM market for 02/16/2006 17 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:51Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 02/16/2006 22 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
15-Feb-2006 15:04:51Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 02/16/2006 23 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
15-Feb-2006 15:32:47Prices in the February 14, 2006 Real-Time Market, encompassing Energy, Regulation and Operating Reserves are correct. Prices in the February 14, 2006 Hour-Ahead Market are correct. Prices in the February 15, 2006 Day-Ahead Market are correct.