Insert Time | Message |
23-Dec-2005 01:03:52 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 01:00 FOR CE Steam System. |
23-Dec-2005 01:04:24 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 01:00 FOR STEAM SYSTEM SECURITY. |
23-Dec-2005 03:01:40 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 03:00 FOR CE Steam System. |
23-Dec-2005 03:02:07 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 03:00 FOR STEAM SYSTEM SECURITY. |
23-Dec-2005 05:21:49 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 05:00 FOR CE Steam System. |
23-Dec-2005 05:22:24 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 05:00 FOR STEAM SYSTEM SECURITY. |
23-Dec-2005 05:52:55 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 05:00 FOR CE Steam System. |
23-Dec-2005 05:53:17 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 05:00 FOR STEAM SYSTEM SECURITY. |
23-Dec-2005 06:13:43 | ISO UPDATES ROSETON___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 12/23/2005 06:00 FOR . |
23-Dec-2005 06:19:19 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 06:00 FOR STEAM SYSTEM SECURITY. |
23-Dec-2005 06:23:25 | Metering Authority - Consolidated Edison of NY REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 06:00. |
23-Dec-2005 06:33:37 | ISO UPDATES ROSETON___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 12/23/2005 06:00 FOR UOL AUDIT, 573 FAILED AUDIT. |
23-Dec-2005 06:36:58 | ISO UPDATES ROSETON___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 12/23/2005 06:00 FOR UOL AUDIT, 573 FAILED AUDIT. |
23-Dec-2005 07:03:18 | ISO UPDATES ROSETON___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 12/23/2005 07:00 FOR UOL AUDIT, 573 FAILED AUDIT. |
23-Dec-2005 10:33:22 | ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 12/23/2005 10:00 FOR L/O NEWBRIDGE BUS ON 138-262. PARS ALREADY OPTIMIZED.. |
23-Dec-2005 11:39:31 | ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 12/23/2005 11:00 FOR L/O NEWBRIDGE BUS ON 138-262. PARS ALREADY OPTIMIZED.. |
23-Dec-2005 16:34:34 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 16:00 FOR CE Steam System. |
23-Dec-2005 16:34:53 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 16:00 FOR STEAM SYSTEM SECURITY. |
23-Dec-2005 16:38:43 | ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 12/23/2005 16:00. |
23-Dec-2005 16:38:52 | ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 12/23/2005 16:00. |
23-Dec-2005 17:40:05 | ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 12/23/2005 17:00 FOR L/O NEWBRIDGE BUS ON 138-262. |
23-Dec-2005 17:40:25 | ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 12/23/2005 17:00 FOR L/O NEWBRIDGE BUS ON 138-262. |
23-Dec-2005 20:12:00 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 20:00 FOR CE Steam System. |
23-Dec-2005 20:12:18 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 12/23/2005 20:00 FOR STEAM SYSTEM SECURITY. |
23-Dec-2005 22:22:55 | ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 12/23/2005 22:00. |
23-Dec-2005 22:23:04 | ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 12/23/2005 22:00. |
Insert Time | Message |
23-Dec-2005 10:22:43 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:43 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:43 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:43 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:43 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:44 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:45 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:45 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:45 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:22:45 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/24/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 10:23:36 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 12/24/2005 23 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:46 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:46 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:46 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:46 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Dec-2005 14:49:48 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/24/2005 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |