Insert Time | Message |
05-Nov-2005 00:02:13 | PORT_JEFF_4 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 11/04/2005 23:59. |
05-Nov-2005 00:45:35 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 00:00 FOR steam sendout, actual. |
05-Nov-2005 01:50:44 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 01:00 FOR steam sendout, actual. |
05-Nov-2005 03:48:45 | ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 03:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE. |
05-Nov-2005 03:49:18 | ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 03:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE. |
05-Nov-2005 03:52:57 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 03:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE. |
05-Nov-2005 03:56:59 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 03:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE. |
05-Nov-2005 04:00:03 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 03:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE. |
05-Nov-2005 04:00:23 | ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 04:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE. |
05-Nov-2005 04:00:52 | ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 04:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE. |
05-Nov-2005 04:01:14 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 04:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE. |
05-Nov-2005 05:54:50 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 05:00 FOR steam sendout, actual. |
05-Nov-2005 06:02:48 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 06:00 FOR steam sendout, actual. |
05-Nov-2005 06:15:40 | ISO REQUESTS NORTHPORT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 06:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE. |
05-Nov-2005 06:59:20 | ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 07:00. |
05-Nov-2005 06:59:31 | ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 07:00. |
05-Nov-2005 06:59:45 | ISO REMOVES NORTHPORT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 07:00. |
05-Nov-2005 07:25:31 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 07:00 FOR steam sendout, actual. |
05-Nov-2005 07:49:50 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 07:00 FOR steam sendout, actual. |
05-Nov-2005 09:09:30 | 11/05/2005 09:08:40 NYISO large event reserve pick-up executed. |
05-Nov-2005 10:35:12 | Metering Authority - Long Island Power Authority REQUESTS BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 10:00 FOR L/O VALLEY STREAM BK ON 33KV SYSTEM. |
05-Nov-2005 10:35:38 | Metering Authority - Long Island Power Authority REQUESTS BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 10:00 FOR L/O VALLEY STREAM BK ON 33KV SYSTEM. |
05-Nov-2005 11:01:25 | Metering Authority - Long Island Power Authority UPDATES BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 11:00 FOR L/O 138-561 138-562 ON 69KV SYSTEM. |
05-Nov-2005 11:01:42 | Metering Authority - Long Island Power Authority UPDATES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 11:00 FOR L/O 138-561 138-562 ON 69KV SYSTEM. |
05-Nov-2005 12:58:27 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 12:00 FOR steam sendout, actual. |
05-Nov-2005 13:55:24 | ISO REQUESTS RUSSELL___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 13:00 FOR AUDIT. |
05-Nov-2005 14:25:37 | ISO REMOVES RUSSELL___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 14:00. |
05-Nov-2005 16:54:03 | Metering Authority - Long Island Power Authority UPDATES BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 16:00 FOR L/O 138-561 138-562 ON 69KV SYSTEM. |
05-Nov-2005 16:54:15 | Metering Authority - Long Island Power Authority UPDATES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 16:00 FOR L/O 138-561 138-562 ON 69KV SYSTEM. |
05-Nov-2005 17:53:52 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 17:00 FOR steam sendout, actual. |
05-Nov-2005 21:00:00 | Metering Authority - Long Island Power Authority REMOVES BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 20:00. |
05-Nov-2005 21:00:10 | Metering Authority - Long Island Power Authority REMOVES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 21:00. |
Insert Time | Message |
05-Nov-2005 11:24:20 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:20 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:21 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:21 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:21 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:22 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:22 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:22 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:23 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:23 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:23 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:24 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:24 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:24 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:25 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:25 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:25 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:26 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:26 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:26 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:26 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:27 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:27 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:24:27 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:25:06 | Generator: POLETTI____ scheduled for local reliability in DAM market for 11/06/2005 20 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:25:06 | Generator: POLETTI____ scheduled for local reliability in DAM market for 11/06/2005 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:25:07 | Generator: POLETTI____ scheduled for local reliability in DAM market for 11/06/2005 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:25:07 | Generator: POLETTI____ scheduled for local reliability in DAM market for 11/06/2005 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:43:59 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:00 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:01 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:01 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:01 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:02 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:03 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:04 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:04 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:04 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:05 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:05 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:05 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:06 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:06 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:06 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:07 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:07 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:07 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:08 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:08 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:08 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:09 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
05-Nov-2005 11:44:09 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |