Insert Time | Message |
29-Nov-2005 00:02:08 | BARRETT___1 NO LONGER COMMITED FOR ISO RELIABILITY AFTER 11/28/2005 23:59. |
29-Nov-2005 00:02:25 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 00:00 FOR CON EDISON STEAM SYSTEM SECURITY - STEAM SEND OUT.. |
29-Nov-2005 00:03:09 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 00:00 FOR STEAM SENDOUT FOR CE SYSTEM. |
29-Nov-2005 03:40:02 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 03:00 FOR CON EDISON STEAM SYSTEM SECURITY - STEAM SEND OUT.. |
29-Nov-2005 03:40:24 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 03:00 FOR STEAM SENDOUT FOR CE SYSTEM. |
29-Nov-2005 04:14:16 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 04:00 FOR CON EDISON STEAM SYSTEM SECURITY - STEAM SEND OUT.. |
29-Nov-2005 04:14:33 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 04:00 FOR STEAM SENDOUT FOR CE SYSTEM. |
29-Nov-2005 05:08:12 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 05:00 FOR CON EDISON STEAM SYSTEM SECURITY - STEAM SEND OUT.. |
29-Nov-2005 05:08:42 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 05:00 FOR STEAM SENDOUT FOR CE SYSTEM. |
29-Nov-2005 05:49:09 | Metering Authority - Long Island Power Authority REQUESTS FREEPORT_EQUS_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 06:00 FOR 33KV CONTINGENCY PER LI.. |
29-Nov-2005 05:53:21 | Metering Authority - Long Island Power Authority UPDATES FREEPORT_EQUS_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 06:00 FOR LOSS OF BUS 2 @ BELMORE PUTS 33 KV BARRETT TO BELMORE 428 LINE OVER.. |
29-Nov-2005 06:04:25 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 06:00 FOR CON EDISON STEAM SYSTEM SECURITY - STEAM SEND OUT.. |
29-Nov-2005 06:04:47 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 06:00 FOR STEAM SENDOUT FOR CE SYSTEM. |
29-Nov-2005 06:05:18 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 06:00 FOR CON EDISON STEAM SYSTEM SECURITY - STEAM SEND OUT.. |
29-Nov-2005 06:05:46 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 06:00 FOR STEAM SENDOUT FOR CE SYSTEM. |
29-Nov-2005 06:06:15 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 06:00 FOR CON EDISON STEAM SYSTEM SECURITY - STEAM SEND OUT.. |
29-Nov-2005 06:06:40 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 06:00 FOR STEAM SENDOUT FOR CE SYSTEM. |
29-Nov-2005 06:08:44 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 06:00 FOR STEAM SENDOUT FOR CE SYSTEM. |
29-Nov-2005 06:13:22 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 06:00 FOR CON EDISON STEAM SYSTEM SECURITY - STEAM SEND OUT.. |
29-Nov-2005 06:13:42 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 06:00 FOR STEAM SENDOUT FOR CE SYSTEM. |
29-Nov-2005 06:13:59 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 06:00 FOR CON EDISON STEAM SYSTEM SECURITY - STEAM SEND OUT.. |
29-Nov-2005 07:23:27 | Metering Authority - Long Island Power Authority REQUESTS Freeport___CT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 07:00 FOR LOSS OF 69KV BUSS AT BELMORE ON 33KV SYSTEM.. |
29-Nov-2005 09:04:58 | Metering Authority - Long Island Power Authority UPDATES Freeport___CT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 09:00 FOR . |
29-Nov-2005 09:05:43 | Metering Authority - Long Island Power Authority UPDATES Freeport___CT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 10:00 FOR . |
29-Nov-2005 09:06:41 | Metering Authority - Long Island Power Authority REQUESTS Freeport___CT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 11:00 FOR LOSS OF 69KV BUS 2 AT BELMORE ON 33 KV SYSTEM. |
29-Nov-2005 09:07:21 | Metering Authority - Long Island Power Authority UPDATES Freeport___CT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 09:00 FOR LOSS OF 69KV BUS 2 AT BELMORE ON 33 KV SYSTEM. |
29-Nov-2005 09:38:30 | Metering Authority - Long Island Power Authority UPDATES Freeport___CT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 09:00 FOR LOSS OF 69KV BUS 2 AT BELMORE ON 33 KV SYSTEM. |
29-Nov-2005 10:11:18 | ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 10:00 FOR P/C LOSS OF 262 ON 461. |
29-Nov-2005 10:18:06 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 10:00 FOR P/C LOSS OF 262 ON 461. |
29-Nov-2005 10:21:49 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 10:00 FOR P/C LOSS OF 262 ON 461. |
29-Nov-2005 10:30:36 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 10:00 FOR P/C LOSS OF 262 ON 461. |
29-Nov-2005 11:02:20 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 11:00 FOR P/C LOSS OF 262 ON 461. |
29-Nov-2005 11:03:20 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 11:00 FOR P/C LOSS OF BANK 8 AND 461 ON 262. |
29-Nov-2005 11:46:40 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 11:00 FOR P/C LOSS OF BANK 8 AND 461 ON 262. |
29-Nov-2005 12:38:58 | Metering Authority - Long Island Power Authority UPDATES FREEPORT_EQUS_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 12:00 FOR LOSS OF BUS 2 AT BELMORE 69KV ON 33KV SYSTEM. |
29-Nov-2005 12:39:33 | Metering Authority - Long Island Power Authority UPDATES FREEPORT_EQUS_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 13:00 FOR LOSS OF BUS 2 AT BELMORE 69KV ON 33KV SYSTEM. |
29-Nov-2005 12:39:49 | Metering Authority - Long Island Power Authority REQUESTS FREEPORT_EQUS_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 14:00 FOR LOSS OF BUS 2 AT BELMORE 69KV ON 33KV SYSTEM. |
29-Nov-2005 13:34:46 | Metering Authority - Long Island Power Authority REMOVES Freeport___CT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 13:00. |
29-Nov-2005 14:20:17 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 14:00 FOR P/C LOSS OF BANK 8 AND 461 ON 262. |
29-Nov-2005 15:39:00 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 15:00 FOR P/C LOSS OF BANK 8 AND 461 ON 262. |
29-Nov-2005 16:10:58 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 16:00 FOR P/C LOSS OF BANK 8 AND 461 ON 262. |
29-Nov-2005 16:21:12 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 16:00 FOR P/C LOSS OF BANK 8 AND 461 ON 262. |
29-Nov-2005 17:24:25 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 17:00 FOR P/C LOSS OF BANK 8 AND 461 ON 262. |
29-Nov-2005 17:24:35 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 17:00 FOR P/C LOSS OF BANK 8 AND 461 ON 262. |
29-Nov-2005 19:17:30 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 19:00 FOR CON EDISON STEAM SYSTEM SECURITY - STEAM SEND OUT.. |
29-Nov-2005 19:17:52 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 19:00 FOR STEAM SENDOUT FOR CE SYSTEM. |
29-Nov-2005 19:52:02 | Metering Authority - Long Island Power Authority REMOVES FREEPORT_EQUS_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 19:00. |
29-Nov-2005 20:14:06 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 20:00 FOR CON EDISON STEAM SYSTEM SECURITY - STEAM SEND OUT.. |
29-Nov-2005 20:14:23 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/29/2005 20:00 FOR STEAM SENDOUT FOR CE SYSTEM. |
29-Nov-2005 21:11:10 | Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/30/2005 00:00 FOR CON EDISON STEAM SYSTEM SECURITY - STEAM SEND OUT.. |
29-Nov-2005 21:58:38 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/29/2005 21:00 FOR P/C LOSS OF BANK 8 AND 461 ON 262. |
Insert Time | Message |
29-Nov-2005 10:46:24 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 10:46:25 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 10:46:25 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/30/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 10:47:18 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 11/30/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 10:47:58 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 11/30/2005 22 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 10:47:58 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 11/30/2005 23 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:50 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:51 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:51 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:51 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:51 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:51 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:51 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:51 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:51 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:51 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:51 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:52 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:52 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:52 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:52 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:52 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:52 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:52 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:52 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:52 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:52 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:52 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:52 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
29-Nov-2005 11:18:52 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/30/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |