P-2505-Nov-2005

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
05-Nov-2005 00:02:13PORT_JEFF_4 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 11/04/2005 23:59.
05-Nov-2005 00:45:35Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 00:00 FOR steam sendout, actual.
05-Nov-2005 01:50:44Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 01:00 FOR steam sendout, actual.
05-Nov-2005 03:48:45ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 03:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE.
05-Nov-2005 03:49:18ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 03:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE.
05-Nov-2005 03:52:57ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 03:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE.
05-Nov-2005 03:56:59ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 03:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE.
05-Nov-2005 04:00:03ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 03:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE.
05-Nov-2005 04:00:23ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 04:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE.
05-Nov-2005 04:00:52ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 04:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE.
05-Nov-2005 04:01:14ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 04:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE.
05-Nov-2005 05:54:50Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 05:00 FOR steam sendout, actual.
05-Nov-2005 06:02:48Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 06:00 FOR steam sendout, actual.
05-Nov-2005 06:15:40ISO REQUESTS NORTHPORT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 06:00 FOR POST CONT 462 FOR THE LOSS OF 463 AND THE 463 FOR THE LOSS OF THE 462 OVER LTE.
05-Nov-2005 06:59:20ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 07:00.
05-Nov-2005 06:59:31ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 07:00.
05-Nov-2005 06:59:45ISO REMOVES NORTHPORT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 07:00.
05-Nov-2005 07:25:31Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 07:00 FOR steam sendout, actual.
05-Nov-2005 07:49:50Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 07:00 FOR steam sendout, actual.
05-Nov-2005 09:09:3011/05/2005 09:08:40 NYISO large event reserve pick-up executed.
05-Nov-2005 10:35:12Metering Authority - Long Island Power Authority REQUESTS BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 10:00 FOR L/O VALLEY STREAM BK ON 33KV SYSTEM.
05-Nov-2005 10:35:38Metering Authority - Long Island Power Authority REQUESTS BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 10:00 FOR L/O VALLEY STREAM BK ON 33KV SYSTEM.
05-Nov-2005 11:01:25Metering Authority - Long Island Power Authority UPDATES BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 11:00 FOR L/O 138-561 138-562 ON 69KV SYSTEM.
05-Nov-2005 11:01:42Metering Authority - Long Island Power Authority UPDATES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 11:00 FOR L/O 138-561 138-562 ON 69KV SYSTEM.
05-Nov-2005 12:58:27Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 12:00 FOR steam sendout, actual.
05-Nov-2005 13:55:24ISO REQUESTS RUSSELL___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 13:00 FOR AUDIT.
05-Nov-2005 14:25:37ISO REMOVES RUSSELL___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 11/05/2005 14:00.
05-Nov-2005 16:54:03Metering Authority - Long Island Power Authority UPDATES BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 16:00 FOR L/O 138-561 138-562 ON 69KV SYSTEM.
05-Nov-2005 16:54:15Metering Authority - Long Island Power Authority UPDATES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 16:00 FOR L/O 138-561 138-562 ON 69KV SYSTEM.
05-Nov-2005 17:53:52Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 17:00 FOR steam sendout, actual.
05-Nov-2005 21:00:00Metering Authority - Long Island Power Authority REMOVES BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 20:00.
05-Nov-2005 21:00:10Metering Authority - Long Island Power Authority REMOVES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 11/05/2005 21:00.

Committed for Reliability

Back to top
Insert TimeMessage
05-Nov-2005 11:24:20Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:20Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:22Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:22Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:22Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:23Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:23Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:23Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:24Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:24Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:24Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:25Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:25Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:25Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:26Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:26Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:26Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:26Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:27Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:27Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:24:27Generator: ASTORIA___5 scheduled for local reliability in DAM market for 11/06/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:25:06Generator: POLETTI____ scheduled for local reliability in DAM market for 11/06/2005 20 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:25:06Generator: POLETTI____ scheduled for local reliability in DAM market for 11/06/2005 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:25:07Generator: POLETTI____ scheduled for local reliability in DAM market for 11/06/2005 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:25:07Generator: POLETTI____ scheduled for local reliability in DAM market for 11/06/2005 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:43:59Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:00Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:01Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:01Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:01Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:02Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:03Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:04Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:04Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:04Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:05Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:05Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:05Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:06Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:06Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:06Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:07Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:07Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:07Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:08Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:08Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:08Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:09Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Nov-2005 11:44:09Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/06/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
05-Nov-2005 15:37:20NYISO is reserving HB 09 and HB 16-18 in the November 04, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. NYISO is reserving HB 09 and HB 16-18 in the November 04, 2005 Hour-Ahead Market. Prices in the November 05, 2005 Day-Ahead Market are correct.