| Insert Time | Message |
| 31-Oct-2005 00:49:46 | ISO REQUESTS DUNKIRK___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 00:00 FOR basepoints. |
| 31-Oct-2005 00:51:32 | ISO REQUESTS DUNKIRK___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 01:00 FOR basepoints. |
| 31-Oct-2005 04:21:40 | NYISO Locational based curtailment cut 300 MWs. NYISO OVER |
| 31-Oct-2005 04:27:09 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 04:00 FOR Overgeneration. |
| 31-Oct-2005 04:27:24 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 04:00. |
| 31-Oct-2005 04:39:20 | ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 04:00 FOR ISO Overgeneration. |
| 31-Oct-2005 04:43:29 | ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 04:00 FOR ISO Overgeneration. |
| 31-Oct-2005 04:43:38 | ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 05:00 FOR ISO Overgeneration. |
| 31-Oct-2005 05:16:00 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 05:00. |
| 31-Oct-2005 05:27:17 | Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 05:00 FOR East End contingencies due to 138-879 OOS. |
| 31-Oct-2005 05:30:39 | ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 05:00 FOR ISO Overgeneration. |
| 31-Oct-2005 05:48:03 | ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 05:00 FOR Overgeneration. |
| 31-Oct-2005 05:52:16 | ISO REQUESTS NY STATE OUT OF MERIT AT 05:51 10/31/05 |
| 31-Oct-2005 05:53:29 | ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 05:00. |
| 31-Oct-2005 05:58:55 | ISO REMOVES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 05:00. |
| 31-Oct-2005 06:09:15 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 06:00 FOR steam sendout, actual. |
| 31-Oct-2005 06:28:19 | NYISO CANCELS STATE OUT OF MERIT AT 06:27 10/31/05 |
| 31-Oct-2005 06:56:57 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 06:00 FOR 18001 & 18002 O/S. |
| 31-Oct-2005 06:57:14 | Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 06:00. |
| 31-Oct-2005 06:57:55 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 06:00 FOR 18001 & 18002 O/S. |
| 31-Oct-2005 06:58:20 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 06:00 FOR 18001 & 18002 O/S. |
| 31-Oct-2005 06:58:48 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 06:00 FOR 18001 & 18002 O/S. |
| 31-Oct-2005 06:59:18 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 06:00 FOR 18001 & 18002 O/S. |
| 31-Oct-2005 06:59:47 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 06:00 FOR 18001 & 18002 O/S. |
| 31-Oct-2005 07:00:40 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 07:00 FOR 18001 & 18002 O/S. |
| 31-Oct-2005 07:01:17 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 07:00 FOR 18001 & 18002 O/S. |
| 31-Oct-2005 07:01:44 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 07:00 FOR 18001 & 18002 O/S. |
| 31-Oct-2005 07:23:03 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 07:00. |
| 31-Oct-2005 07:30:38 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 07:00. |
| 31-Oct-2005 07:43:35 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 07:00. |
| 31-Oct-2005 07:43:44 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 07:00. |
| 31-Oct-2005 07:43:52 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 07:00. |
| 31-Oct-2005 07:44:00 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 07:00. |
| 31-Oct-2005 07:44:08 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 07:00. |
| 31-Oct-2005 07:44:19 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 07:00. |
| 31-Oct-2005 08:01:12 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT4_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 08:00 FOR CE NO LONGER NEEDS UNIT FOR LOCAL SECURITY. |
| 31-Oct-2005 08:01:38 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 08:00 FOR CE NO LONGER NEEDS UNIT FOR LOCAL SECURITY. |
| 31-Oct-2005 08:02:14 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 08:00 FOR CE NO LONGER NEEDS UNIT FOR LOCAL SECURITY. |
| 31-Oct-2005 08:02:39 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 08:00 FOR CE NO LONGER NEEDS UNIT FOR LOCAL SECURITY. |
| 31-Oct-2005 08:04:04 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 08:00 FOR CE NO LONGER NEEDS UNIT FOR LOCAL SECURITY. |
| 31-Oct-2005 08:04:34 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 08:00 FOR CE NO LONGER NEEDS UNIT FOR LOCAL SECURITY. |
| 31-Oct-2005 08:29:17 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 08:00 FOR CE NO LONGER NEEDS UNIT FOR LOCAL SECURITY. |
| 31-Oct-2005 08:53:18 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 08:00 FOR CE NO LONGER NEEDS UNIT FOR LOCAL SECURITY. |
| 31-Oct-2005 09:10:01 | ISO REQUESTS ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 09:00 FOR CONTROLING LOAD AND GENERATION DUE TO 18001 & 18002 BOTH O/S. |
| 31-Oct-2005 09:10:41 | ISO REQUESTS ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 09:00 FOR CONTROLING LOAD AND GENERATION DUE TO 18001 & 18002 BOTH O/S. |
| 31-Oct-2005 09:39:31 | ISO UPDATES ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 09:00 FOR CONTROLING LOAD AND GENERATION DUE TO 18001 & 18002 BOTH O/S. |
| 31-Oct-2005 10:11:51 | Metering Authority - Long Island Power Authority REQUESTS BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 10:00 FOR LI POST CONT ON 138462. |
| 31-Oct-2005 10:12:28 | Metering Authority - Long Island Power Authority UPDATES BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/28/2005 22:00 FOR Modified existing OOM to accommodate SRE Entry (Previous Code: Committed for ISO Reliability, Previous Comments: Record deleted in current hour). Entered by TSA (SJ). |
| 31-Oct-2005 10:12:31 | Metering Authority - Long Island Power Authority REQUESTS BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 10:00 FOR LI SHOWING POST CONT ON 138462. |
| 31-Oct-2005 10:12:49 | Metering Authority - Long Island Power Authority UPDATES BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 10:00 FOR LI SHOWING POST CONT ON 138462. |
| 31-Oct-2005 10:19:23 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 10:00 FOR LI SHOWING POST CONT ON 138462 & 461 OVER NORMAL. |
| 31-Oct-2005 10:19:40 | ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 10:00 FOR LI SHOWING POST CONT ON 138462 & 461 OVER NORMAL. |
| 31-Oct-2005 10:22:11 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 10:00 FOR steam sendout, actual. |
| 31-Oct-2005 10:22:29 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 10:00 FOR LI SHOWING POST CONT ON 138462 & 461 OVER NORMAL. |
| 31-Oct-2005 10:22:43 | ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 10:00 FOR LI SHOWING POST CONT ON 138462 & 461 OVER NORMAL. |
| 31-Oct-2005 11:24:44 | ISO UPDATES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 11:00 FOR CONTROLING LOAD AND GENERATION DUE TO 18001 & 18002 BOTH O/S. |
| 31-Oct-2005 12:22:54 | ISO REQUESTS LINDEN COGEN____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 12:00 FOR AS PER TECH BULLETIN #72 THE UNIT HAS A DAM AND MISSED AN RTC RUN. |
| 31-Oct-2005 12:34:11 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 12:00 FOR steam sendout, actual. |
| 31-Oct-2005 12:48:00 | ISO REQUESTS INDIAN POINT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 12:00 FOR POST CONT ON THE W97 IS BEING IMPACTED BY THIS UNITS OVER GEN. |
| 31-Oct-2005 13:22:00 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 13:00 FOR LI SHOWING POST CONT ON 138462 & 461 OVER NORMAL. |
| 31-Oct-2005 13:49:25 | ISO REMOVES INDIAN POINT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 13:00. |
| 31-Oct-2005 14:51:12 | ISO UPDATES ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 14:00 FOR CONTROLING LOAD AND GENERATION DUE TO 18001 & 18002 BOTH O/S. |
| 31-Oct-2005 15:32:37 | ISO REMOVES ASTORIA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 15:00. |
| 31-Oct-2005 15:32:55 | ISO REMOVES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 15:00. |
| 31-Oct-2005 17:05:00 | ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 17:00. |
| 31-Oct-2005 17:05:10 | ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 17:00. |
| 31-Oct-2005 17:18:04 | 10/31/2005 17:15:57 NYISO large event reserve pick-up executed. |
| 31-Oct-2005 18:05:21 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 18:00 FOR ACE GREATER THAN +500MW. |
| 31-Oct-2005 18:14:16 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 18:00. |
| 31-Oct-2005 19:08:58 | ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 19:00 FOR 461 OVER NORMAL. |
| 31-Oct-2005 19:09:29 | ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 19:00 FOR 461 LINE OVER NORMAL. |
| 31-Oct-2005 19:43:49 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 19:00 FOR FOR SWITCHING TO RESTORE NEWBRIDGE BREAKER. 461 WILL GO OVER NORMAL. |
| 31-Oct-2005 19:44:27 | ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 19:00 FOR FOR SWITCHING TO RESTORE NEWBRIDGE BREAKER. 461 LINE WILL GO OVER NORMAL. |
| 31-Oct-2005 20:42:23 | ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 20:00. |
| 31-Oct-2005 20:42:30 | ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/31/2005 20:00. |
| 31-Oct-2005 21:24:24 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/31/2005 21:00 FOR steam sendout, actual. |
| Insert Time | Message |
| 31-Oct-2005 11:14:30 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/01/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:14:31 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/01/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:14:32 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 11/01/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:06 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:07 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:07 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:08 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:09 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:10 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:10 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:10 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:11 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:11 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:11 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:12 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:12 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:12 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:13 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:13 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:13 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:14 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:14 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:14 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:15 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:15 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:15 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:16 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 11/01/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:59 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:15:59 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:00 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:00 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:00 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:01 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:01 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:01 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:02 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:02 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:02 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:03 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:03 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:03 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:04 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:04 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:04 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:05 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:05 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:05 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:06 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:06 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:06 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:16:07 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 11/01/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:42:44 | Generator: POLETTI____ scheduled for local reliability in DAM market for 11/01/2005 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:42:45 | Generator: POLETTI____ scheduled for local reliability in DAM market for 11/01/2005 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:42:45 | Generator: POLETTI____ scheduled for local reliability in DAM market for 11/01/2005 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 31-Oct-2005 11:45:36 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 11/01/2005 23 Energy = 190 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |