| Insert Time | Message |
| 12-Oct-2005 05:07:03 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 05:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 07:53:55 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 07:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 07:55:38 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 07:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 08:45:11 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 08:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 08:52:17 | ISO UPDATES ATHENS_STG_3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/12/2005 09:00 FOR UNIT AUDIT.. |
| 12-Oct-2005 09:07:00 | 10/12/2005 09:04:13 NYISO large event reserve pick-up executed. |
| 12-Oct-2005 09:17:51 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 09:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 09:19:52 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 09:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 09:23:26 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 09:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 09:24:04 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 09:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 09:25:43 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 09:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 09:28:16 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 09:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 09:32:22 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/11/2005 00:00 FOR Modified Existing OOM to accommodate SRE entry (prev code: Gen Derate, prev. comments: Tube Leak) (SJ). |
| 12-Oct-2005 09:45:31 | ISO REQUESTS HUNTLEY___65 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/12/2005 09:00 FOR UNIT AUDIT.. |
| 12-Oct-2005 09:49:45 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 09:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 09:52:20 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 09:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 09:53:20 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 09:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 09:58:41 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 09:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 10:06:09 | ISO UPDATES RAVENSWOOD___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/12/2005 10:00 FOR (UNIT DERATED FOR TUBE LEAK) - UNIT AUDIT.. |
| 12-Oct-2005 11:01:49 | ISO REQUESTS LOVETT___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/12/2005 11:00 FOR UNIT AUDIT.. |
| 12-Oct-2005 11:21:18 | ISO REMOVES LOVETT___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/12/2005 11:00. |
| 12-Oct-2005 11:59:22 | Metering Authority - Consolidated Edison of NY REMOVES RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 12:00. |
| 12-Oct-2005 12:42:52 | Metering Authority - Consolidated Edison of NY REMOVES RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 13:00. |
| 12-Oct-2005 13:38:48 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 14:00 FOR Ravenswoods Faciity maintenance. |
| 12-Oct-2005 13:39:30 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 13:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 14:53:48 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 14:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 16:01:16 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 16:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 16:19:36 | NYISO Locational based curtailment cut 300 MWs. |
| 12-Oct-2005 16:58:14 | Metering Authority - Consolidated Edison of NY REQUESTS NYPA_HARLEM__RVR__GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 16:00 FOR 34051 TRIPPED - LINE RETURNED TO SERVICE, BUT CON EDISON KEEPING BRKR THAT GOES WITH THESE UNITS O/S TO DO ANALYSIS. NYPA AND CON EDISON INFORMED OF OOM.. |
| 12-Oct-2005 16:58:28 | Metering Authority - Consolidated Edison of NY REQUESTS NYPA_HARLEM__RVR__GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 16:00 FOR 34051 TRIPPED - LINE RETURNED TO SERVICE, BUT CON EDISON KEEPING BRKR THAT GOES WITH THESE UNITS O/S TO DO ANALYSIS. NYPA AND CON EDISON INFORMED OF OOM.. |
| 12-Oct-2005 18:32:23 | Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 18:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 20:27:06 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 20:00 FOR STEAM SYSTEM SECURITY.. |
| 12-Oct-2005 23:20:14 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/12/2005 23:00 FOR . |
| 12-Oct-2005 23:52:02 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/12/2005 23:00. |
| Insert Time | Message |
| 12-Oct-2005 11:01:25 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 10/13/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 11:02:27 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/13/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 11:02:27 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/13/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 11:16:40 | Generator: POLETTI____ scheduled for local reliability in DAM market for 10/13/2005 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:02 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 00 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:02 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 01 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:02 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 04 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:02 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 06 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:02 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 08 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:02 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 10 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:02 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 09 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:02 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 07 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:02 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 05 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:02 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 03 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:02 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 02 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:03 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 11 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:03 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 16 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:03 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 18 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:03 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 20 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:03 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 23 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:03 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 22 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:03 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 21 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:03 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 19 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:03 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 17 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:03 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 15 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:03 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 12 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:03 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 13 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 12-Oct-2005 13:46:03 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/13/2005 14 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |