| Insert Time | Message |
| 11-Oct-2005 06:25:15 | NYISO Locational based curtailment cut 744 MWs. TLR FG100 |
| 11-Oct-2005 07:23:02 | OH initiated curtailment cut 364 MWs. |
| 11-Oct-2005 07:32:13 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/11/2005 07:00 FOR STEAM SYSTEM SECURITY.. |
| 11-Oct-2005 07:53:54 | ISO REQUESTS BOWLINE___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/11/2005 07:00 FOR Audit. |
| 11-Oct-2005 08:01:55 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/11/2005 08:00 FOR STEAM SYSTEM SECURITY.. |
| 11-Oct-2005 08:04:03 | ISO REMOVES BOWLINE___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/11/2005 08:00. |
| 11-Oct-2005 09:03:41 | The NYISO has experienced a problem with RTC posting |
| 11-Oct-2005 11:30:58 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/07/2005 00:00 FOR Modified Existing OOM to accommodate SRE entry by TSA (prev. code Gen Derate, prev comments: Tube Leak)(SJ). |
| 11-Oct-2005 11:44:55 | Metering Authority - Consolidated Edison of NY REQUESTS RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 00:00 FOR TO SRE'd unit for 10/12/05 all day and then cancelled SRE. |
| 11-Oct-2005 13:02:43 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/11/2005 13:00 FOR Switching in Astoria yard. |
| 11-Oct-2005 13:04:15 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/11/2005 13:00 FOR Switching in Astoria yard. |
| 11-Oct-2005 13:04:34 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/11/2005 13:00 FOR Switching in Astoria yard. |
| 11-Oct-2005 13:04:55 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/11/2005 14:00. |
| 11-Oct-2005 13:05:37 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/11/2005 13:00 FOR Switching in Astoria yard. |
| 11-Oct-2005 13:06:04 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/11/2005 13:00 FOR Switching in Astoria yard. |
| 11-Oct-2005 13:06:37 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/11/2005 13:00 FOR Switching in Astoria yard. |
| 11-Oct-2005 13:07:21 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/11/2005 13:00 FOR Switching in Astoria yard. |
| 11-Oct-2005 13:12:53 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/11/2005 13:00 FOR Switching in Astoria yard. |
| 11-Oct-2005 13:54:06 | Metering Authority - Long Island Power Authority UPDATES NORTHPORT___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/08/2005 22:00 FOR Modified existing OOM to accommodate SRE entry (prev code: Gen Derate, prev. comments: SILICA)(SJ). |
| 11-Oct-2005 13:59:06 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/08/2005 21:00 FOR Modified Existing OOM to accommodate SRE entry (prev code: Gen Derate, prev comments: Tube Leak)(SJ). |
| 11-Oct-2005 14:17:30 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/09/2005 21:00 FOR Modified existing OOM to accommodate SRE entry (prev code: gen derate, prev. comments: Tube Leak) (SJ). |
| 11-Oct-2005 14:50:58 | Metering Authority - Consolidated Edison of NY REMOVES RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/12/2005 00:00. |
| 11-Oct-2005 14:54:07 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/10/2005 22:00 FOR Modified existing OOM to accommodate SRE entry (prev code: Gen Derate, prev comments: Tube Leak) (SJ). |
| 11-Oct-2005 15:30:35 | Metering Authority - Niagara Mohawk UPDATES OXBOW____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/04/2005 07:00 FOR Modified Existing OOM to accommodate SRE entry (prev code: Gen Derate, prev comments: Crack in the Lube Oil System)(SJ). |
| Insert Time | Message |
| 11-Oct-2005 10:21:31 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:32 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:32 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:33 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:33 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:34 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:34 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:34 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:35 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:35 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:36 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:36 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:36 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:37 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:37 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:38 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:38 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:38 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:39 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:39 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:39 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:40 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:40 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:21:41 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/12/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:48:14 | Generator: POLETTI____ scheduled for local reliability in DAM market for 10/12/2005 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 10:48:25 | Generator: POLETTI____ scheduled for local reliability in DAM market for 10/12/2005 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:04 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:05 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:05 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:05 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:05 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:05 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:05 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:05 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:05 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:05 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:05 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:06 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:06 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:06 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:06 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:06 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:06 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:06 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:06 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:06 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:06 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:06 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:06 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:24:06 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/12/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:43 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 00 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:44 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 01 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:44 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 06 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:44 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 08 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:44 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 10 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:44 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 11 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:44 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 09 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:44 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 07 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:44 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 05 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:44 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 02 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:44 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 04 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:44 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 03 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:45 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 12 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:45 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 20 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:45 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 23 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:45 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 22 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:45 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 21 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:45 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 19 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:45 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 14 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:45 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 16 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:45 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 17 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:45 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 18 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:45 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 15 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 11-Oct-2005 11:42:45 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/12/2005 13 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |