| Insert Time | Message |
| 06-Oct-2005 00:02:03 | INDIAN POINT___3 NO LONGER COMMITED FOR ISO RELIABILITY AFTER 10/05/2005 23:59. |
| 06-Oct-2005 00:42:35 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 00:00 FOR SYSTEM WORK IN LOAD POCKET. |
| 06-Oct-2005 00:43:06 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 00:00 FOR SYSTEM WORK IN LOAD POCKET. |
| 06-Oct-2005 00:43:54 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 00:00 FOR SYSTEM WORK IN LOAD POCKET. |
| 06-Oct-2005 00:51:33 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 01:00 FOR SYSTEM WORK IN LOAD POCKET. |
| 06-Oct-2005 01:17:06 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 01:00. |
| 06-Oct-2005 01:17:19 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 01:00. |
| 06-Oct-2005 01:51:39 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 01:00. |
| 06-Oct-2005 02:31:38 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 02:00. |
| 06-Oct-2005 03:15:00 | NYISO Locational based curtailment cut 78 MWs. |
| 06-Oct-2005 03:36:27 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 03:00 FOR SYSTEM WORK IN LOAD POCKET. |
| 06-Oct-2005 03:37:21 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 04:00 FOR SYSTEM WORK IN LOAD POCKET. |
| 06-Oct-2005 03:38:04 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 03:00 FOR SYSTEM WORK IN LOAD POCKET. |
| 06-Oct-2005 03:39:02 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 04:00 FOR SYSTEM WORK IN LOAD POCKET. |
| 06-Oct-2005 03:41:22 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 03:00. |
| 06-Oct-2005 03:54:09 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 03:00 FOR SYSTEM WORK IN LOAD POCKET. |
| 06-Oct-2005 05:20:54 | ISO REQUESTS INDIAN POINT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/06/2005 05:00 FOR BASEPOINTS. |
| 06-Oct-2005 05:33:09 | ISO UPDATES INDIAN POINT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/06/2005 05:00 FOR BASEPOINTS. |
| 06-Oct-2005 05:39:24 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 05:00 FOR steam system security. |
| 06-Oct-2005 05:50:15 | ISO UPDATES INDIAN POINT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/06/2005 05:00 FOR BASEPOINTS. |
| 06-Oct-2005 06:05:27 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 06:00 FOR steam system security. |
| 06-Oct-2005 06:50:23 | ISO UPDATES INDIAN POINT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/06/2005 06:00 FOR BASEPOINTS. |
| 06-Oct-2005 06:51:46 | ISO UPDATES INDIAN POINT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/06/2005 06:00 FOR BASEPOINTS. |
| 06-Oct-2005 07:17:21 | ISO REQUESTS RAVENSWOOD___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/06/2005 07:00 FOR AUDIT. |
| 06-Oct-2005 07:30:58 | ISO UPDATES INDIAN POINT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/06/2005 07:00 FOR BASEPOINTS. |
| 06-Oct-2005 07:33:50 | ISO UPDATES INDIAN POINT___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/06/2005 07:00 FOR BASEPOINTS. |
| 06-Oct-2005 07:57:11 | ISO REMOVES RAVENSWOOD___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/06/2005 08:00. |
| 06-Oct-2005 10:32:17 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/05/2005 21:00 FOR Modified existing OOM to accommodate SRE entry (prev. code Derate, prev. comments: tube leak)(SJ). |
| 06-Oct-2005 12:13:31 | ISO UPDATES ROSETON___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/06/2005 12:00 FOR NYISO AUDIT. |
| 06-Oct-2005 12:24:15 | ISO REMOVES ROSETON___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/06/2005 13:00. |
| 06-Oct-2005 12:57:59 | ISO UPDATES ROSETON___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/06/2005 13:00 FOR FAILED AUDIT TEST OF UOL. |
| 06-Oct-2005 19:53:46 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 19:00 FOR steam system security. |
| 06-Oct-2005 23:21:16 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 23:00 FOR ONLINE PER CON ED REQUEST, CON ED DID NOT SRE IN ADVANCE FOR THESE HOURS.. |
| 06-Oct-2005 23:30:11 | Metering Authority - Long Island Power Authority REQUESTS BARRETT_IC_12 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/06/2005 23:00 FOR HELD ON BY LI FOR NORTHPORT 4 DERATE. |
| Insert Time | Message |
| 06-Oct-2005 10:49:16 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 10/07/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 10:49:17 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 10/07/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 10:50:09 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/07/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 10:50:10 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/07/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 10:50:10 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/07/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 13:46:08 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/07/2005 22 Energy = 180 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 13:46:08 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 10/07/2005 23 Energy = 180 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 13:48:18 | Generator: POLETTI____ scheduled for local reliability in DAM market for 10/07/2005 18 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 13:48:18 | Generator: POLETTI____ scheduled for local reliability in DAM market for 10/07/2005 19 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 13:48:19 | Generator: POLETTI____ scheduled for local reliability in DAM market for 10/07/2005 20 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 13:48:19 | Generator: POLETTI____ scheduled for local reliability in DAM market for 10/07/2005 21 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 13:48:20 | Generator: POLETTI____ scheduled for local reliability in DAM market for 10/07/2005 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 13:48:20 | Generator: POLETTI____ scheduled for local reliability in DAM market for 10/07/2005 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:20 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:21 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:21 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:21 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:21 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:21 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:21 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:21 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:21 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:21 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:21 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:21 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:22 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:22 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:22 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:22 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:22 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:22 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:22 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:22 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:23 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:23 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:23 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:01:23 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 10/07/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:17:55 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/07/2005 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:17:57 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/07/2005 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:17:57 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/07/2005 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:17:57 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/07/2005 11 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:17:58 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/07/2005 12 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:17:58 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/07/2005 13 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:17:58 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/07/2005 14 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:17:59 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/07/2005 15 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:17:59 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/07/2005 17 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:17:59 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/07/2005 16 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:18:00 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/07/2005 18 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:18:00 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/07/2005 20 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 14:18:00 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/07/2005 19 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 23:16:17 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 10/07/2005 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 23:16:18 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 10/07/2005 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 23:16:18 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 10/07/2005 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 23:16:19 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 10/07/2005 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 23:16:19 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 10/07/2005 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 23:16:19 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 10/07/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 23:16:19 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 10/07/2005 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 23:16:20 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 10/07/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 23:16:20 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 10/07/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 06-Oct-2005 23:16:20 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 10/07/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |