| 03-Oct-2005 00:02:13 | DUNKIRK___4 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 10/02/2005 23:59. |
| 03-Oct-2005 00:03:07 | Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 00:00 FOR 115KV LOCAL SECURITY. |
| 03-Oct-2005 01:04:54 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 01:00 FOR 115KV LOCAL SECURITY. |
| 03-Oct-2005 05:16:10 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 05:00 FOR STEAM SYSTEM SECURITY. |
| 03-Oct-2005 06:12:48 | Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 06:00 FOR 115KV LOCAL SECURITY. |
| 03-Oct-2005 06:44:55 | Metering Authority - Niagara Mohawk REMOVES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 06:00. |
| 03-Oct-2005 07:01:33 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 07:00 FOR steam system security. |
| 03-Oct-2005 07:13:28 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 07:00 FOR STEAM SYSTEM SECURITY. |
| 03-Oct-2005 08:31:41 | Metering Authority - Niagara Mohawk REQUESTS UPPER HUDSON___HYD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 08:00 FOR EJ West and Stewarts bridge units taken oom by nimo for line outage.. |
| 03-Oct-2005 08:32:30 | Metering Authority - Niagara Mohawk UPDATES UPPER HUDSON___HYD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 08:00 FOR EJ West and Stewarts bridge units taken oom by nimo for 9 line outage.. |
| 03-Oct-2005 09:49:30 | Metering Authority - Consolidated Edison of NY UPDATES POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2005 00:00 FOR Modified existing OOM record to accommodate SRE entry (prev code: Gen Derate, prev comments: SCHEDULED Q35L OUTAGE)(SM). |
| 03-Oct-2005 10:00:07 | Metering Authority - Consolidated Edison of NY UPDATES POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/01/2005 00:00 FOR Modified existing OOM to accommodate SRE entry (prev code: Gen Derate, prev comments: Limit on BK17 XFMR)(SM). |
| 03-Oct-2005 10:12:18 | Metering Authority - Long Island Power Authority UPDATES NORTHPORT___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/02/2005 06:00 FOR Modified existing OOM to accommodate SRE entry (prev code: Gen Derate, prev comments: LATE HITTING LINE)(SM). |
| 03-Oct-2005 11:25:29 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 11:00 FOR STEAM SYSTEM SECURITY. |
| 03-Oct-2005 11:58:24 | ISO REQUESTS CARR STREET_E._SYR OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/03/2005 12:00 FOR UNIT ON EARLY - RTC NOT SCHEDULING, BUT UNIT BID IS ACCEPTIBLE FOR DISPATCH. PLACING UNIT OOM TO GET UNIT A BASEPOINT.. |
| 03-Oct-2005 12:07:55 | NYISO Locational based curtailment cut 201 MWs. |
| 03-Oct-2005 12:11:33 | Metering Authority - Niagara Mohawk REMOVES UPPER HUDSON___HYD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 12:00. |
| 03-Oct-2005 14:13:48 | ISO REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/03/2005 14:00 FOR AUDIT. |
| 03-Oct-2005 14:35:46 | ISO REMOVES FAR ROCKAWAY___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/03/2005 14:00. |
| 03-Oct-2005 15:00:55 | ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/03/2005 15:00 FOR AUDIT. |
| 03-Oct-2005 15:13:07 | ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 10/03/2005 15:00. |
| 03-Oct-2005 16:17:01 | Metering Authority - Consolidated Edison of NY REQUESTS POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 16:00 FOR CE REQUEST THE DERATE FOR WORK ON LINE 37377. |
| 03-Oct-2005 17:11:45 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 17:00 FOR steam system security. |
| 03-Oct-2005 17:32:51 | Metering Authority - Consolidated Edison of NY REMOVES POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 17:00. |
| 03-Oct-2005 17:46:01 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 17:00 FOR steam system security. |
| 03-Oct-2005 18:55:00 | Metering Authority - Consolidated Edison of NY UPDATES POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 18:00 FOR CON EDISON SWITCHING ON 37377.. |
| 03-Oct-2005 18:55:04 | Metering Authority - Consolidated Edison of NY REQUESTS POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 19:00 FOR CON EDISON SWITCHING ON 37377.. |
| 03-Oct-2005 19:18:48 | Metering Authority - Niagara Mohawk REQUESTS NIAGARA____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 19:00 FOR . |
| 03-Oct-2005 19:33:53 | Metering Authority - Niagara Mohawk UPDATES NIAGARA____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 19:00 FOR . |
| 03-Oct-2005 19:43:05 | Metering Authority - Niagara Mohawk UPDATES NIAGARA____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 19:00 FOR . |
| 03-Oct-2005 19:44:11 | Metering Authority - Niagara Mohawk UPDATES NIAGARA____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 19:00 FOR . |
| 03-Oct-2005 19:56:41 | Metering Authority - Niagara Mohawk REQUESTS NIAGARA____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 20:00 FOR . |
| 03-Oct-2005 20:09:01 | Metering Authority - Niagara Mohawk REMOVES NIAGARA____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 20:00. |
| 03-Oct-2005 21:49:46 | Metering Authority - Consolidated Edison of NY REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/03/2005 21:00. |
| Insert Time | Message |
| 03-Oct-2005 10:36:02 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 10/04/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 10:36:03 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 10/04/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 10:36:29 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 10/04/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 10:36:29 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 10/04/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 10:36:30 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 10/04/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 10:38:07 | Generator: POLETTI____ scheduled for local reliability in DAM market for 10/04/2005 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 10:38:08 | Generator: POLETTI____ scheduled for local reliability in DAM market for 10/04/2005 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:15 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 07 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:16 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 08 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:16 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 10 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:16 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 09 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:17 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 11 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:17 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 12 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:17 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 13 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:18 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 14 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:18 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 15 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:18 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 16 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:19 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 17 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:19 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 19 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:19 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 18 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:20 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 20 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 13:36:20 | Generator: OXBOW____ scheduled for local reliability in DAM market for 10/04/2005 21 Energy = 56 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:29 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 07 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:29 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:30 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:30 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 11 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:30 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:31 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 12 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:31 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 13 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:31 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 14 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:32 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 15 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:32 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 16 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:32 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 18 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:32 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 17 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:33 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 19 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:33 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 21 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:33 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 20 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
| 03-Oct-2005 14:58:34 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/04/2005 22 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |