P-2510-Sep-2005

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
10-Sep-2005 00:02:03GILBOA___3 NO LONGER COMMITED FOR ISO RELIABILITY AFTER 09/09/2005 23:59.
10-Sep-2005 00:05:42ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 09/10/2005 00:00 FOR NOX.
10-Sep-2005 00:23:45ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 09/10/2005 00:00 FOR NOX.
10-Sep-2005 00:59:26ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 09/10/2005 00:00 FOR NOX.
10-Sep-2005 01:44:42ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 09/10/2005 01:00 FOR NOX.
10-Sep-2005 03:09:29ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 09/10/2005 03:00.
10-Sep-2005 03:19:57ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 09/10/2005 03:00 FOR NOX.
10-Sep-2005 03:20:12ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 09/10/2005 04:00 FOR NOX.
10-Sep-2005 03:23:02ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 09/10/2005 05:00 FOR NOX.
10-Sep-2005 06:52:41Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/10/2005 06:00 FOR STEAM SYSTEM SECURITY.
10-Sep-2005 06:53:09Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/10/2005 06:00 FOR STEAM SYSTEM SECURITY.
10-Sep-2005 06:54:18Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/10/2005 06:00 FOR STEAM SYSTEM SECURITY.
10-Sep-2005 06:56:00Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/10/2005 06:00 FOR STEAM SYSTEM SECURITY.
10-Sep-2005 07:04:06NPX initiated curtailment cut 200 MWs.
10-Sep-2005 07:53:56PJM initiated curtailment cut 500 MWs.
10-Sep-2005 07:56:12PJM initiated curtailment cut 529 MWs.
10-Sep-2005 08:03:37Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/10/2005 08:00 FOR STEAM SYSTEM SECURITY.
10-Sep-2005 08:04:2409/10/2005 08:01:43 NYISO large event reserve pick-up executed.
10-Sep-2005 08:22:1109/10/2005 08:20:11 NYISO large event reserve pick-up executed.
10-Sep-2005 08:28:43ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 09/10/2005 08:00 FOR NOX - DERATED TO 260 PER CON EDISON FOR RIVER WATER TEMPERATURE..
10-Sep-2005 08:32:0409/10/2005 08:29:55 NYISO large event reserve pick-up executed.
10-Sep-2005 10:17:11Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/10/2005 10:00 FOR 69KV SECURITY BK6.
10-Sep-2005 10:57:15ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 09/10/2005 10:00 FOR NOX - DERATED TO 280 PER CON EDISON FOR RIVER WATER TEMPERATURE..
10-Sep-2005 11:29:01ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 09/10/2005 11:00 FOR NOX - DERATED TO 280 PER CON EDISON FOR RIVER WATER TEMPERATURE..
10-Sep-2005 15:38:01Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/10/2005 15:00 FOR 69KV SECURITY BK6.
10-Sep-2005 20:03:51ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 09/10/2005 20:00 FOR NOX - DERATED TO 280 PER CON EDISON FOR RIVER WATER TEMPERATURE..
10-Sep-2005 22:20:23Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/10/2005 22:00 FOR 69KV SECURITY BK6.
10-Sep-2005 22:29:59Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/10/2005 22:00 FOR LOSS OF BK 4 ON 69669..
10-Sep-2005 22:30:34Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/10/2005 22:00 FOR LOSS OF BK 4 ON 69669.

Committed for Reliability

Back to top
Insert TimeMessage
10-Sep-2005 04:11:19Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/10/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 04:11:19Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/10/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 04:11:20Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/10/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 04:11:20Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/10/2005 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 04:11:20Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/10/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:43:58Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:43:58Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:43:59Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:43:59Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:43:59Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:00Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:00Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:00Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:01Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:01Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:01Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:02Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:02Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:02Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:03Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:03Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:03Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:04Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:04Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:04Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:05Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:05Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:05Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:06Generator: BARRETT___1 scheduled for local reliability in DAM market for 09/11/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:25Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:25Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:26Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:26Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:26Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:26Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:27Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:27Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:27Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:28Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:28Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:28Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:29Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:29Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:29Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:30Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:30Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:30Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:31Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:31Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:31Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:32Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:32Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:32Generator: BARRETT___2 scheduled for local reliability in DAM market for 09/11/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:49Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:50Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:50Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:50Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:51Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:51Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:51Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:52Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:52Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:52Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:53Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:53Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:53Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:53Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:54Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:54Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:54Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:55Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:55Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:55Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:56Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:56Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:56Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 11:44:57Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/11/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:14Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 06 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:15Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 07 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:15Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 08 Energy = 52 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:16Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 09 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:16Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 10 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:17Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 11 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:18Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 12 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:18Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 13 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:19Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 14 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:19Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 15 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:19Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 16 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:19Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 17 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:20Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 18 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:20Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 20 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:20Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 19 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:21Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 21 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 13:21:22Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/11/2005 22 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:36:46Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/10/2005 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:36:46Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/10/2005 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:36:46Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/10/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:36:47Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/10/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:48:59Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:00Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:00Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:00Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:00Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:01Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:01Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:01Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:02Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:02Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:02Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:03Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:03Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:03Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:03Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:04Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:04Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:04Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:05Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:05Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:05Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:06Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:06Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Sep-2005 18:49:06Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/11/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
10-Sep-2005 15:19:04NYISO is reserving HB 4 and 5 in the September 9, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices for potential ECA end-state problems at NPX. NYISO is reserving HB 3, 4 and 5 in the September 9, 2005 Hour-Ahead Market. Prices in the September 10, 2005 Day-Ahead Market are correct.