P-2514-Sep-2005

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
14-Sep-2005 00:19:33Metering Authority - Consolidated Edison of NY REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 00:00.
14-Sep-2005 01:33:44Metering Authority - Consolidated Edison of NY REMOVES ARTHUR_KILL_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 01:00.
14-Sep-2005 02:22:3109/14/2005 02:17:08 NYISO large event reserve pick-up executed.
14-Sep-2005 02:23:29ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/14/2005 02:00 FOR .
14-Sep-2005 04:26:39Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 04:00 FOR Steam System Security.
14-Sep-2005 04:27:11Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 04:00 FOR steam system security..
14-Sep-2005 04:46:30Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 04:00 FOR steam system security..
14-Sep-2005 04:46:47Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 04:00 FOR Steam System Security.
14-Sep-2005 05:36:35Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 05:00 FOR steam system security..
14-Sep-2005 05:37:09Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 05:00 FOR Steam System Security.
14-Sep-2005 05:46:04Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 05:00 FOR steam system security.
14-Sep-2005 05:50:44Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 05:00 FOR steam system security..
14-Sep-2005 05:51:13Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 05:00 FOR Steam System Security.
14-Sep-2005 08:06:02Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 08:00 FOR steam system security..
14-Sep-2005 08:39:00Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 08:00 FOR 69KV CONTINGENCIES.
14-Sep-2005 11:25:55Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 11:00 FOR steam system security.
14-Sep-2005 11:49:39Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 11:00 FOR LOSS OF 69965 ON 69889..
14-Sep-2005 17:36:54Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 17:00.
14-Sep-2005 19:19:47NYISO Locational based curtailment cut 155 MWs.
14-Sep-2005 19:35:20Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 19:00 FOR steam system security.
14-Sep-2005 19:35:45Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 19:00 FOR Steam System Security.
14-Sep-2005 19:35:58Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 19:00 FOR Steam System Security.
14-Sep-2005 19:36:13Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 19:00 FOR steam system security..
14-Sep-2005 21:06:04Metering Authority - Consolidated Edison of NY REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 21:00.
14-Sep-2005 21:26:07Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 21:00 FOR Steam System Security.
14-Sep-2005 21:26:31Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 21:00 FOR steam system security..
14-Sep-2005 21:53:00Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 21:00 FOR LOSS OF BANK 6 @ VALLEY STREAM ON 69Kv SYSTEM..
14-Sep-2005 21:56:10Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 21:00 FOR 69KV CONTINGENCIES.
14-Sep-2005 22:41:03NYISO Locational based curtailment cut 557 MWs.
14-Sep-2005 23:21:21Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 23:00.

Committed for Reliability

Back to top
Insert TimeMessage
14-Sep-2005 10:58:54Generator: POLETTI____ scheduled for local reliability in DAM market for 09/15/2005 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 10:58:54Generator: POLETTI____ scheduled for local reliability in DAM market for 09/15/2005 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 10:59:55Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/15/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 10:59:55Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/15/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 10:59:55Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/15/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:10:13Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/15/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:10:13Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/15/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:11:44Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/15/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:11:44Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/15/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:11:45Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/15/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:05Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:06Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:06Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:07Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:07Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:08Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:10Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:10Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:10Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:11Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:15Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:18Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:18Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:19Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:20Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:21Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:21Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 11:31:22Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 13:38:25Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/15/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
14-Sep-2005 13:38:26Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/15/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
14-Sep-2005 15:24:06NYISO is reserving HB 1,3 & 4 in the September 13, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. HB 1 is reserved for anomalous load fluctuations. NYISO is reserving HB 3 & 4 in the September 13, 2005 Hour-Ahead Market encompassing Energy, Regulation and Operating Reserve. Prices in the September 14, 2005 Day-Ahead Market are correct.