Insert Time | Message |
14-Sep-2005 00:19:33 | Metering Authority - Consolidated Edison of NY REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 00:00. |
14-Sep-2005 01:33:44 | Metering Authority - Consolidated Edison of NY REMOVES ARTHUR_KILL_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 01:00. |
14-Sep-2005 02:22:31 | 09/14/2005 02:17:08 NYISO large event reserve pick-up executed. |
14-Sep-2005 02:23:29 | ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/14/2005 02:00 FOR . |
14-Sep-2005 04:26:39 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 04:00 FOR Steam System Security. |
14-Sep-2005 04:27:11 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 04:00 FOR steam system security.. |
14-Sep-2005 04:46:30 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 04:00 FOR steam system security.. |
14-Sep-2005 04:46:47 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 04:00 FOR Steam System Security. |
14-Sep-2005 05:36:35 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 05:00 FOR steam system security.. |
14-Sep-2005 05:37:09 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 05:00 FOR Steam System Security. |
14-Sep-2005 05:46:04 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 05:00 FOR steam system security. |
14-Sep-2005 05:50:44 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 05:00 FOR steam system security.. |
14-Sep-2005 05:51:13 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 05:00 FOR Steam System Security. |
14-Sep-2005 08:06:02 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 08:00 FOR steam system security.. |
14-Sep-2005 08:39:00 | Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 08:00 FOR 69KV CONTINGENCIES. |
14-Sep-2005 11:25:55 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 11:00 FOR steam system security. |
14-Sep-2005 11:49:39 | Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 11:00 FOR LOSS OF 69965 ON 69889.. |
14-Sep-2005 17:36:54 | Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 17:00. |
14-Sep-2005 19:19:47 | NYISO Locational based curtailment cut 155 MWs. |
14-Sep-2005 19:35:20 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 19:00 FOR steam system security. |
14-Sep-2005 19:35:45 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 19:00 FOR Steam System Security. |
14-Sep-2005 19:35:58 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 19:00 FOR Steam System Security. |
14-Sep-2005 19:36:13 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 19:00 FOR steam system security.. |
14-Sep-2005 21:06:04 | Metering Authority - Consolidated Edison of NY REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 21:00. |
14-Sep-2005 21:26:07 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 21:00 FOR Steam System Security. |
14-Sep-2005 21:26:31 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 21:00 FOR steam system security.. |
14-Sep-2005 21:53:00 | Metering Authority - Long Island Power Authority REQUESTS FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 21:00 FOR LOSS OF BANK 6 @ VALLEY STREAM ON 69Kv SYSTEM.. |
14-Sep-2005 21:56:10 | Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 21:00 FOR 69KV CONTINGENCIES. |
14-Sep-2005 22:41:03 | NYISO Locational based curtailment cut 557 MWs. |
14-Sep-2005 23:21:21 | Metering Authority - Long Island Power Authority REMOVES FPL FAR_ROCK_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/14/2005 23:00. |
Insert Time | Message |
14-Sep-2005 10:58:54 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/15/2005 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 10:58:54 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/15/2005 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 10:59:55 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/15/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 10:59:55 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/15/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 10:59:55 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/15/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:10:13 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/15/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:10:13 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/15/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:11:44 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/15/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:11:44 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/15/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:11:45 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/15/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:05 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:06 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:06 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:07 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:07 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:08 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:10 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:10 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:10 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:11 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:12 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:12 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:13 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:13 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:15 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:17 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:17 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:18 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:18 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:19 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:20 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:21 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:21 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 11:31:22 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/15/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 13:38:25 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/15/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Sep-2005 13:38:26 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/15/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |