P-2511-Sep-2005

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
11-Sep-2005 00:02:11PORT_JEFF_3 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 09/10/2005 23:59.
11-Sep-2005 00:02:11PORT_JEFF_4 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 09/10/2005 23:59.
11-Sep-2005 00:02:11FAR ROCKAWAY___4 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 09/10/2005 23:59.
11-Sep-2005 00:46:10Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 00:00 FOR LOSS OF 138-881 AND 138-882 ON 69-675.
11-Sep-2005 00:47:46Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 00:00 FOR LOSS OF 138-881 AND 138-882 ON 69-675.
11-Sep-2005 00:58:48Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 00:00 FOR STEAM SYSTEM SECURITY.
11-Sep-2005 01:02:59Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 02:00.
11-Sep-2005 02:04:53Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 02:00 FOR STEAM SYSTEM SECURITY.
11-Sep-2005 02:19:15HQ initiated curtailment cut 95 MWs. SMD
11-Sep-2005 02:26:00ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 09/11/2005 02:00.
11-Sep-2005 03:35:16Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 03:00 FOR LOSS OF 138-881 AND 138-882 ON 69-675.
11-Sep-2005 03:35:46Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 05:00.
11-Sep-2005 04:25:27Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 04:00 FOR LOSS OF 138-881 AND 138-882 ON 69-675.
11-Sep-2005 04:25:53ISO REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 09/11/2005 04:00 FOR LOSS OF 138-881 AND 138-882 ON 69-675.
11-Sep-2005 04:27:29Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 04:00 FOR LOSS OF 138-881 AND 138-882 ON 69-675.
11-Sep-2005 05:07:11ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/11/2005 05:00 FOR CONTROL ERROR.
11-Sep-2005 06:46:03ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/11/2005 07:00 FOR PUMP HELD ON OOM FOR ISO RELIABILITY - CPS/ACE W/ LOW LOAD PICKUP..
11-Sep-2005 06:48:00Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 06:00 FOR STEAM SYSTEM SECURITY.
11-Sep-2005 07:14:39Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 07:00 FOR STEAM SYSTEM SECURITY.
11-Sep-2005 07:15:43Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 07:00 FOR STEAM SYSTEM SECURITY.
11-Sep-2005 07:16:07Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 07:00 FOR STEAM SYSTEM SECURITY.
11-Sep-2005 07:53:27Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 07:00 FOR LOSS OF 138-881 AND 138-882 ON 69-675.
11-Sep-2005 07:53:45Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 07:00 FOR LOSS OF 138-881 AND 138-882 ON 69-675.
11-Sep-2005 07:55:52Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 08:00 FOR STEAM SYSTEM SECURITY.
11-Sep-2005 08:20:05Metering Authority - Consolidated Edison of NY REMOVES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 08:00.
11-Sep-2005 09:01:37Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 09:00.
11-Sep-2005 09:01:54Metering Authority - Long Island Power Authority REMOVES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 09:00.
11-Sep-2005 12:02:23Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 12:00 FOR STEAM SYSTEM SECURITY.
11-Sep-2005 16:25:18Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 16:00 FOR LOSS OF BANK 6 ON 69 361, 356..
11-Sep-2005 16:25:30Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 16:00 FOR LOSS OF BANK 6 ON 69Kv 361, 356..
11-Sep-2005 20:11:57Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 20:00 FOR LOSS OF BANK 6 ON 69Kv 361, 356..
11-Sep-2005 21:52:21Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 21:00 FOR LOSS OF BANK 6 ON 69Kv 361, 356..
11-Sep-2005 21:52:33Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/12/2005 00:00.
11-Sep-2005 22:33:52Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/11/2005 22:00.

Committed for Reliability

Back to top
Insert TimeMessage
11-Sep-2005 11:19:36Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/12/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:19:37Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 09/12/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:26:46Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/12/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:26:47Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/12/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:16Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:17Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:17Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:17Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:18Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:18Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:18Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:18Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:19Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:19Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:19Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:19Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:20Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:20Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:20Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:21Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:21Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 11:28:21Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 09/12/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:04Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 06 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:04Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 07 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:04Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 08 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:05Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 09 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:05Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 10 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:05Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 11 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:06Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 12 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:06Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 13 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:06Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 14 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:07Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 15 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:07Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 16 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:07Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 17 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:08Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 18 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:08Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 19 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:08Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 20 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:09Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 21 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:44:09Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 09/12/2005 22 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:23Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:23Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:23Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:24Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:24Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:24Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:25Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:25Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:25Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:26Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:26Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:27Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:27Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:27Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:28Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:28Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:28Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Sep-2005 15:52:29Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/12/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
11-Sep-2005 12:10:11Prices in the September 10, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve are correct. Prices in the September 10, 2005 Hour-Ahead Market are correct. Prices in the September 11, 2005 Day-Ahead Market are correct.