Insert Time | Message |
23-Sep-2005 00:02:10 | EAST_RIVER___1 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 09/22/2005 23:59. |
23-Sep-2005 00:02:10 | EAST_RIVER___2 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 09/22/2005 23:59. |
23-Sep-2005 00:10:28 | PJM initiated curtailment cut 683 MWs. |
23-Sep-2005 00:18:15 | 09/23/2005 00:16:42 NYISO large event reserve pick-up executed. |
23-Sep-2005 00:33:02 | ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/23/2005 00:00. |
23-Sep-2005 00:42:30 | ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/23/2005 00:00 FOR . |
23-Sep-2005 00:45:47 | ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/23/2005 01:00 FOR to give back basepoints. |
23-Sep-2005 00:49:01 | ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/23/2005 00:00 FOR . |
23-Sep-2005 00:49:20 | ISO UPDATES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/23/2005 01:00 FOR to give back basepoints. |
23-Sep-2005 02:08:17 | 09/23/2005 02:06:10 NYISO large event reserve pick-up executed. |
23-Sep-2005 03:22:43 | Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 03:00 FOR steam system security. |
23-Sep-2005 03:23:23 | Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 03:00 FOR steam system security. |
23-Sep-2005 03:57:10 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 03:00 FOR steam system security. |
23-Sep-2005 03:57:39 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 03:00 FOR steam system security. |
23-Sep-2005 04:47:12 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 04:00 FOR steam system security. |
23-Sep-2005 04:47:34 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 04:00 FOR steam system security. |
23-Sep-2005 05:11:23 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 05:00 FOR steam system security. |
23-Sep-2005 05:12:08 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 05:00 FOR steam system security. |
23-Sep-2005 05:56:57 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 05:00 FOR steam system security. |
23-Sep-2005 05:57:16 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 05:00 FOR steam system security. |
23-Sep-2005 08:31:21 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 08:31:49 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 08:32:26 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 08:33:30 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 08:34:29 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 08:34:54 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 08:35:18 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 08:37:25 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 08:37:50 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 08:38:13 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 08:39:36 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 08:39:55 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_11 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 08:40:14 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_12 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 08:40:35 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_13 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 08:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 10:13:05 | NYISO Locational based curtailment cut 55 MWs. |
23-Sep-2005 12:02:04 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/23/2005 12:00 FOR 138 CONRTINGENCIES AT BARRETT.. |
23-Sep-2005 12:56:23 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 12:57:06 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00 FOR LOSS OF FIRE PROTECTION FROM CON ED.. |
23-Sep-2005 14:42:59 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:43:15 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:43:23 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:43:38 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:44:04 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:44:17 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:44:29 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:44:41 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:44:54 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:45:04 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:45:13 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_11 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:45:26 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_12 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:45:41 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_13 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:46:08 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:46:25 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:46:37 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 14:00. |
23-Sep-2005 14:47:02 | ISO UPDATES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/23/2005 14:00 FOR 138 CONTINGENCIES AT BARRETT.. |
23-Sep-2005 14:55:19 | Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 15:00 FOR CON ED SYSTEM STEAM. |
23-Sep-2005 14:55:39 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 16:00 FOR CON ED SYSTEM STEAM. |
23-Sep-2005 16:18:16 | Metering Authority - Consolidated Edison of NY REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 16:00. |
23-Sep-2005 19:35:37 | Metering Authority - Consolidated Edison of NY REQUESTS ARTHUR_KILL_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 19:00 FOR ASTORIA NOX BUBBLE. |
23-Sep-2005 20:18:50 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 20:00 FOR steam system security. |
23-Sep-2005 20:19:15 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 20:00 FOR steam system security. |
23-Sep-2005 21:33:49 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 21:00 FOR steam system security. |
23-Sep-2005 21:34:41 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/23/2005 21:00 FOR steam system security. |
23-Sep-2005 21:59:55 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/23/2005 21:00 FOR OVERGENERATION. |
Insert Time | Message |
23-Sep-2005 10:46:28 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:29 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:29 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:30 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:30 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:31 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:31 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:32 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:32 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:32 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:33 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:33 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:33 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:34 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:34 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:34 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:35 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:35 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:35 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:36 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:36 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:37 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:37 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:46:37 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/24/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:08 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:08 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:08 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:09 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:09 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:09 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:09 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:09 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:09 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:09 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:09 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:09 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:10 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:10 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:10 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:10 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:10 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:10 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:10 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:11 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:11 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:11 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:12 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:48:12 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/24/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:49:32 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 09/24/2005 23 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:50:24 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/24/2005 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
23-Sep-2005 10:50:25 | Generator: POLETTI____ scheduled for local reliability in DAM market for 09/24/2005 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |