P-2508-Jun-2005

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
08-Jun-2005 00:02:02EAST RIVER___6 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 06/07/2005 23:59.
08-Jun-2005 00:02:02BARRETT___1 NO LONGER COMMITED FOR ISO RELIABILITY AFTER 06/07/2005 23:59.
08-Jun-2005 01:04:0406/08/2005 01:02:45 NYISO large event reserve pick-up executed.
08-Jun-2005 06:29:54Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/08/2005 06:00 FOR Steam system security.
08-Jun-2005 06:37:44Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/08/2005 06:00 FOR Steam system security.
08-Jun-2005 07:09:1906/08/2005 07:08:19 NYISO large event reserve pick-up executed.
08-Jun-2005 09:14:2306/08/2005 09:13:27 NYISO large event reserve pick-up executed.
08-Jun-2005 09:51:39ISO REQUESTS OSWEGO___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 09:00 FOR LIMITING OSWEGO UNITS FOR OSWEGO COMPLEX STABILITY LIMITATION W/ 19 LINE O/S TO 620 TOTAL OUTPUT FROM OSWEGO'S 5 AND 6..
08-Jun-2005 09:52:11ISO UPDATES OSWEGO___6 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 09:00 FOR LIMITING OSWEGO UNITS FOR OSWEGO COMPLEX STABILITY LIMITATION W/ 19 LINE O/S TO 620 TOTAL OUTPUT FROM OSWEGO'S 5 AND 6..
08-Jun-2005 11:00:03Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/07/2005 23:00 FOR Modified existing OOM to accommodate SRE entry by TSA (prev code: Gen Derate, prev comments: HOT WELL PUMP PROBLEM)(SM).
08-Jun-2005 11:42:36ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 11:00 FOR .
08-Jun-2005 11:42:5806/08/2005 11:41:11 NYISO large event reserve pick-up executed.
08-Jun-2005 11:43:04ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 11:00 FOR ACE / POLETTI TRIP..
08-Jun-2005 11:43:23ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 11:00 FOR ACE / POLETTI TRIP..
08-Jun-2005 11:47:0306/08/2005 11:44:49 NYISO large event reserve pick-up executed.
08-Jun-2005 12:04:59ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 12:00.
08-Jun-2005 12:09:13Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 12:00 FOR changed by TSA (DB) as per directive of Eric Mitchell - originally: LOSS OF 138-888 ON 69-850, 69KV SECURITY.
08-Jun-2005 12:48:13ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 12:00 FOR ISO ACE + 275, TAKING NIAGARA OOM DOWN -300 FROM 1875 TO 1575..
08-Jun-2005 12:57:02ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 12:00.
08-Jun-2005 13:01:50Metering Authority - Consolidated Edison of NY REQUESTS 74TH STREET_GT_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/08/2005 13:00 FOR UNIT BEING HELD OFFLINE PER CON EDISON FOR SYSTEM CONDITIONS - GT'S ON MEANS CON EDISON HAS TO REMOVE A BANK FROM SERVICE, CON EDISON REQUESTS UNITS STAY OFFLINE..
08-Jun-2005 13:03:09Metering Authority - Consolidated Edison of NY REQUESTS 74TH STREET_GT_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/08/2005 13:00 FOR UNIT BEING HELD OFFLINE PER CON EDISON FOR SYSTEM CONDITIONS - GT'S ON MEANS CON EDISON HAS TO REMOVE A BANK FROM SERVICE, CON EDISON REQUESTS UNITS STAY OFFLINE..
08-Jun-2005 13:40:32ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 13:00 FOR 367 FOR THE LOSS OF 368..
08-Jun-2005 13:40:38Metering Authority - Long Island Power Authority UPDATES BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/07/2005 23:00 FOR Modified existing OOM to accommodate SRE entry by TSA (prev code: ISO Reliability, prev comment: 262 P/C FLOWS)(SM).
08-Jun-2005 13:58:50ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 13:00 FOR 367 FOR THE LOSS OF 368..
08-Jun-2005 14:55:35ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 15:00 FOR RTC SCHEDULED UNIT FOR HB15 (15 MINUTES) - ISO MARKING UNIT OOM TO 0..
08-Jun-2005 14:56:59ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 14:00 FOR RTC SCHEDULED UNIT FOR HB15 (15 MINUTES) - ISO MARKING UNIT OOM TO 0..
08-Jun-2005 14:57:15ISO REMOVES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 16:00.
08-Jun-2005 14:57:39ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 16:00 FOR RTC SCHEDULED UNIT FOR HB15 (15 MINUTES) - ISO MARKING UNIT OOM TO 0..
08-Jun-2005 14:57:46ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 16:00.
08-Jun-2005 14:58:10ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 15:00 FOR RTC SCHEDULED UNIT FOR HB15 (15 MINUTES) - ISO MARKING UNIT OOM TO 0..
08-Jun-2005 15:05:11ISO UPDATES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 15:00 FOR RTC SCHEDULED UNIT FOR HB15 (15 MINUTES) - ISO MARKING UNIT OOM TO 0..
08-Jun-2005 15:07:24ISO REMOVES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 15:00.
08-Jun-2005 15:08:08ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 15:00 FOR RTC SCHEDULED UNIT FOR HB15 (15 MINUTES) - ISO MARKING UNIT OOM TO 0..
08-Jun-2005 15:10:30ISO UPDATES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 15:00 FOR UNIT MISTAKENLY DERATED BY ISO OPERATOR (IN LIEU OF UNIT 3), OOM RAISING UNIT BASEPOINT TO MATCH INITIAL SCHEDULE..
08-Jun-2005 15:14:36ISO UPDATES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 15:00 FOR OOM FOR ISO RELIABILITY TO FULL LOAD DUE TO UNIT 2 COMING OFFLINE PER OPERATOR ERROR AND -644 ON DNI FOR HB15..
08-Jun-2005 16:11:33ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 16:00 FOR UNIT BEING HELD ON BY ISO FOR ISO RELIABILITY PER S.S. (RTC SCHEDULED SHUTDOWN OF UNIT @ 1615, HOLDING UNIT ON TILL ISO NO LONGER NEEDS UNIT)..
08-Jun-2005 16:12:09ISO UPDATES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 16:00 FOR UNIT BEING HELD ON BY ISO FOR ISO RELIABILITY PER S.S. (RTC SCHEDULED SHUTDOWN OF UNIT @ 1615, HOLDING UNIT ON TILL ISO NO LONGER NEEDS UNIT)..
08-Jun-2005 16:12:54ISO UPDATES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 16:00 FOR UNIT BEING HELD ON BY ISO FOR ISO RELIABILITY PER S.S. (RTC SCHEDULED SHUTDOWN OF UNIT @ 1615, HOLDING UNIT ON TILL ISO NO LONGER NEEDS UNIT)..
08-Jun-2005 16:23:38ISO REQUESTS BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 16:00 FOR UNIT BEING BASEPOINTED DOWN, UP AGAINST 367 FOR LOSS OF 368 AND LOAD IS STILL COMING UP..
08-Jun-2005 16:24:02ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 17:00 FOR UNIT BEING HELD ON BY ISO FOR ISO RELIABILITY PER S.S. (RTC SCHEDULED SHUTDOWN OF UNIT @ 1615, HOLDING UNIT ON TILL ISO NO LONGER NEEDS UNIT)..
08-Jun-2005 16:24:15ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 16:00.
08-Jun-2005 16:27:28ISO UPDATES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 16:00 FOR UNIT BEING HELD ON BY ISO FOR ISO RELIABILITY PER S.S. (RTC SCHEDULED SHUTDOWN OF UNIT @ 1615, HOLDING UNIT ON TILL ISO NO LONGER NEEDS UNIT). ISO TAKING UNIT OFFLINE AND PLACING IT BACK IN MERIT @ 1630 TO BE OFF BY 1640..
08-Jun-2005 16:27:40ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 17:00.
08-Jun-2005 16:34:20ISO REQUESTS GOWANUS_GT1_1 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/08/2005 16:00 FOR RTC scheduling off for HB17, keeping on per S.S..
08-Jun-2005 16:35:34ISO REQUESTS GOWANUS_GT1_2 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/08/2005 16:00 FOR RTC scheduling off for HB17, keeping on per S.S..
08-Jun-2005 16:36:21ISO REMOVES GOWANUS_GT1_1 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/08/2005 16:00.
08-Jun-2005 16:36:39ISO REMOVES GOWANUS_GT1_2 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/08/2005 16:00.
08-Jun-2005 17:17:03ISO UPDATES OSWEGO___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 17:00 FOR LIMITING OSWEGO UNITS FOR OSWEGO COMPLEX STABILITY LIMITATION W/ 19 LINE O/S TO 620 TOTAL OUTPUT FROM OSWEGO'S 5 AND 6..
08-Jun-2005 17:17:21ISO UPDATES OSWEGO___6 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 17:00 FOR LIMITING OSWEGO UNITS FOR OSWEGO COMPLEX STABILITY LIMITATION W/ 19 LINE O/S TO 620 TOTAL OUTPUT FROM OSWEGO'S 5 AND 6..
08-Jun-2005 17:19:41ISO UPDATES OSWEGO___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 17:00 FOR LIMITING OSWEGO UNITS FOR OSWEGO COMPLEX STABILITY LIMITATION W/ 19 LINE O/S TO 620 TOTAL OUTPUT FROM OSWEGO'S 5 AND 6..
08-Jun-2005 17:19:58ISO UPDATES OSWEGO___6 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 17:00 FOR LIMITING OSWEGO UNITS FOR OSWEGO COMPLEX STABILITY LIMITATION W/ 19 LINE O/S TO 620 TOTAL OUTPUT FROM OSWEGO'S 5 AND 6..
08-Jun-2005 17:41:06ISO UPDATES OSWEGO___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 17:00 FOR LIMITING OSWEGO UNITS FOR OSWEGO COMPLEX STABILITY LIMITATION W/ 19 LINE O/S TO 620 TOTAL OUTPUT FROM OSWEGO'S 5 AND 6..
08-Jun-2005 17:41:22ISO UPDATES OSWEGO___6 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 17:00 FOR LIMITING OSWEGO UNITS FOR OSWEGO COMPLEX STABILITY LIMITATION W/ 19 LINE O/S TO 620 TOTAL OUTPUT FROM OSWEGO'S 5 AND 6..
08-Jun-2005 17:48:01ISO REQUESTS SITHE_IND_GS1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 17:00 FOR 19 LINE OUT.
08-Jun-2005 17:48:43ISO REQUESTS SITHE_IND_GS2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 17:00 FOR 19 LINE OUT.
08-Jun-2005 17:56:35ISO UPDATES SITHE_IND_GS3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 17:00 FOR .
08-Jun-2005 17:56:54ISO UPDATES SITHE_IND_GS4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 17:00 FOR .
08-Jun-2005 18:01:50ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 18:00 FOR PCE+650.
08-Jun-2005 21:56:21ISO REMOVES SITHE_IND_GS1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 21:00.
08-Jun-2005 21:56:48ISO REMOVES SITHE_IND_GS2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 21:00.
08-Jun-2005 21:56:57ISO REMOVES SITHE_IND_GS4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 21:00.
08-Jun-2005 21:57:04ISO REMOVES SITHE_IND_GS3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 21:00.
08-Jun-2005 21:57:29ISO REMOVES OSWEGO___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 21:00.
08-Jun-2005 21:57:38ISO REMOVES OSWEGO___6 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 21:00.
08-Jun-2005 22:36:41ISO REMOVES OSWEGO___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 23:00.
08-Jun-2005 22:37:06ISO REMOVES OSWEGO___6 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 23:00.
08-Jun-2005 23:25:07ISO REMOVES BARRETT___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/08/2005 23:00.

Committed for Reliability

Back to top
Insert TimeMessage
08-Jun-2005 10:30:20Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/09/2005 20 Energy = 120 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 10:30:21Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/09/2005 21 Energy = 120 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 10:30:21Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/09/2005 22 Energy = 120 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 10:30:21Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/09/2005 23 Energy = 120 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 10:40:07Generator: BARRETT___1 scheduled for local reliability in DAM market for 06/09/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:11Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:12Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:13Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:14Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:14Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:14Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:14Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:15Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:15Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:15Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:16Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:16Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:16Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:17Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:18Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 11:01:18Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:26Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 08 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:26Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 09 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:27Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 10 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:27Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 12 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:27Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 13 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:27Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 11 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:28Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 14 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:28Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 15 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:28Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 16 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:28Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 17 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:29Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 18 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:29Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 20 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:29Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 21 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:29Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 19 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:30Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 22 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:16:30Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 06/09/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:49Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 07 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:50Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:50Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:50Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:51Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 11 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:51Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 12 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:51Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 14 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:51Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 13 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:52Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 15 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:52Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 17 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:52Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 16 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:53Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 18 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:53Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 20 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
08-Jun-2005 16:17:53Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/09/2005 19 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
08-Jun-2005 16:01:28NYISO is reserving HB 0-23 in the June 7, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. NYISO is reserving HB 0-23 in the June 7, 2005 Hour-Ahead Market, encompassing Energy, Regulation and Operating Reserve prices. Prices in the June 8, 2005 Day-Ahead Market are correct. (Message 1 of 3)
08-Jun-2005 16:01:46The NYISO and LECG have determined that the Carthage Paper gen bus has incorrect LBMPs, thus necessitating reservations in the RT and HAM Markets for HB 0-13; the Allegheny CoGen gen bus has incorrect LBMPs for the RT and HAM Markets for HB 0-8; and the Walden Hydro gen bus has incorrect LBMPs for the RT and HAM Markets for HB 0-23. These issues do not affect any other buses or calculations. (Message 2 of 3)
08-Jun-2005 16:02:08The NYISO and LECG have determined that there may be an incorrect calculation of LBMPs on the proxy buses necessitating the reservations in Real Time for HB 12, and 20-23. Additionally, the following hours are reserved in the Real Time Market for other reasons: HB 0, 1, 8, 9 and 12-23. (Message 3 of 3)
08-Jun-2005 16:34:00Please note that the DAM and RT Load Pocket Threshold amounts and Constrained hours contained in the Web postings of 20 April 2005 and 15 May 2005 are correct. However these postings incorrectly show Average LBMPs instead of Load Weighted LBMPs. Therefore the postings will be revised to accurately reflect Load Weighted LBMPs. The NYISO apologizes for any inconvenience this may have caused.