Insert Time | Message |
14-Jun-2005 00:02:16 | ASTORIA___2 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 06/13/2005 23:59. |
14-Jun-2005 00:02:16 | ASTORIA___5 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 06/13/2005 23:59. |
14-Jun-2005 00:02:16 | ASTORIA_GT_8 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 06/13/2005 23:59. |
14-Jun-2005 00:02:16 | ASTORIA_GT_7 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 06/13/2005 23:59. |
14-Jun-2005 00:54:59 | Metering Authority - Consolidated Edison of NY REMOVES ARTHUR_KILL_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 00:00. |
14-Jun-2005 00:55:17 | Metering Authority - Consolidated Edison of NY REMOVES ARTHUR_KILL_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 00:00. |
14-Jun-2005 04:40:36 | ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/14/2005 05:00 FOR PUMP BEING HELD ON TILL 0515 FOR ISO RELIABILITY - (2 PUMPS SCHEDULED OFF @ 0500 WITH -132 DNI). ISO HOLDING PUMP ON TO ALLOW FOR LOAD PICKUP TO CATCH UP TO PUMP COMING OFFLINE.. |
14-Jun-2005 05:04:53 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 05:00 FOR STEAM SENDOUT TO 155. |
14-Jun-2005 06:38:15 | ISO REQUESTS ASTORIA_GT2_3 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 06:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 06:39:25 | ISO REQUESTS ASTORIA_GT2_4 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 06:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 06:40:46 | ISO REQUESTS ASTORIA_GT4_1 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 06:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 06:45:32 | ISO REQUESTS ASTORIA_GT2_2 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 06:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 06:46:21 | ISO UPDATES ASTORIA_GT2_1 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 06:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 06:57:22 | ISO REQUESTS ASTORIA_GT4_1 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 07:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 06:57:31 | ISO REQUESTS ASTORIA_GT4_3 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 07:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 06:57:39 | ISO REQUESTS ASTORIA_GT4_4 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 07:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 06:57:42 | ISO REQUESTS ASTORIA_GT4_2 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 07:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 07:10:14 | 06/14/2005 07:08:58 NYISO large event reserve pick-up executed. |
14-Jun-2005 07:24:07 | ISO REQUESTS ASTORIA_GT3_1 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 07:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 07:24:14 | ISO REQUESTS ASTORIA_GT3_2 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 07:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 07:24:21 | ISO REQUESTS ASTORIA_GT3_3 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 07:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 07:24:25 | ISO REQUESTS ASTORIA_GT3_4 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 07:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 07:36:40 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 07:36:59 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 07:37:13 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 07:38:47 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 07:39:06 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 07:39:21 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 07:39:37 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 07:39:53 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:02:26 | ISO REQUESTS ASTORIA_GT4_2 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 08:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 08:04:52 | ISO REQUESTS ASTORIA_GT3_4 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 08:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 08:05:01 | ISO REQUESTS ASTORIA_GT3_2 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 08:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 08:05:13 | ISO REQUESTS ASTORIA_GT3_3 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 08:00 FOR ASTORIA EAST LOAD POCKET. |
14-Jun-2005 08:11:44 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:12:01 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:13:40 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:13:53 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:14:05 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:14:20 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:14:33 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:14:45 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:54:14 | ISO REMOVES LINDEN COGEN____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:57:53 | Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:58:20 | Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:58:37 | Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:59:04 | Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:59:20 | Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 08:59:41 | Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 08:00. |
14-Jun-2005 09:00:06 | Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 09:00. |
14-Jun-2005 09:00:28 | Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 09:00. |
14-Jun-2005 09:31:56 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/13/2005 23:00 FOR Modified existing OOM record to accommodate SRE entry by TSA (prev code: Gen Derate, prev comments: . Record deleted in evaluating hour)(SM). |
14-Jun-2005 09:46:31 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 09:00 FOR SUPPLYING STEAM TO CON ED SYSTEM. |
14-Jun-2005 14:15:31 | NPX initiated curtailment cut 783 MWs. |
14-Jun-2005 14:25:44 | Metering Authority - Consolidated Edison of NY REQUESTS ARTHUR_KILL_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 14:00 FOR NOX. |
14-Jun-2005 14:26:09 | Metering Authority - Consolidated Edison of NY UPDATES ARTHUR_KILL_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 14:00 FOR NOX. |
14-Jun-2005 14:29:28 | NPX initiated curtailment cut 333 MWs. |
14-Jun-2005 14:31:05 | NPX initiated curtailment cut 483 MWs. |
14-Jun-2005 14:51:04 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_11 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 14:00 FOR CON ED SECURITY AT ASTORIA. |
14-Jun-2005 14:51:25 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 14:00 FOR CON ED SECURITY AT ASTORIA. |
14-Jun-2005 14:52:41 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_12 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 14:00 FOR CON ED SECURITY AT ASTORIA. |
14-Jun-2005 14:53:15 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_13 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 14:00 FOR CON ED SECURITY AT ASTORIA. |
14-Jun-2005 14:58:44 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD_GT_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 15:00 FOR CON ED SECURITY AT ASTORIA. |
14-Jun-2005 14:59:13 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD_GT_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 15:00 FOR CON ED SECURITY AT ASTORIA. |
14-Jun-2005 15:39:22 | Metering Authority - Consolidated Edison of NY UPDATES ARTHUR_KILL_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 15:00 FOR NOX. |
14-Jun-2005 15:45:40 | ISO REQUESTS WADING RIVER_IC_1 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 15:00 FOR RTC NOT SENDING BASEPOINT.. |
14-Jun-2005 15:46:14 | ISO REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/14/2005 15:00 FOR RTC NOT SENDING BASEPOINT. |
14-Jun-2005 16:19:14 | Metering Authority - Consolidated Edison of NY REQUESTS RAVENSWOOD_GT_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 16:00 FOR CON ED SECURITY DUE TO HIGH SYSTEM LOAD. |
14-Jun-2005 16:19:58 | Metering Authority - Consolidated Edison of NY REMOVES RAVENSWOOD_GT_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 16:00. |
14-Jun-2005 16:23:42 | Metering Authority - Consolidated Edison of NY REQUESTS RAVENSWOOD_GT_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 16:00 FOR CON ED SECURITY DUE TO HIGH LOAD. |
14-Jun-2005 17:51:44 | Metering Authority - Consolidated Edison of NY REMOVES RAVENSWOOD_GT_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 18:00. |
14-Jun-2005 18:36:22 | NYISO Locational based curtailment cut 92 MWs. |
14-Jun-2005 20:47:23 | ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/14/2005 21:00 FOR UNIT SCHEDULED OFF @ 2100, ALONG WITH ANOTHER GILBOA. ISO HOLDING UNIT 4 ON OOM TILL 2115 TO BETTER MANAGE AGAINST LOAD DROP-OFF.. |
14-Jun-2005 21:57:12 | ISO REQUESTS ASTORIA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/14/2005 21:00 FOR ASTORIA 2 BEING BASEPOINTED DOWN BUT ISO SHOWING ASTORIA E / COR / JAM LOAD POCKET OVER NORMAL (RTD SHOWING POCKET SOLVED BUT REAL TIME NOT SOLVING). ISO PLACING UNIT OOM TO STOP UNIT BEING BASEPOINTED DOWN.. |
14-Jun-2005 22:08:12 | Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 22:00 FOR STEAM SENDOUT TO 155 (ISO DERATING TO ACTUAL OF 111).. |
14-Jun-2005 22:35:44 | ISO REQUESTS ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/14/2005 22:00 FOR AST E/COR/JAM LOAD POCKET OVER NORMAL, CON EDISON REQUESTING OOM TO KEEP UNIT FROM BEING DISPATCHED DOWN (AS WELL AS TO ALLOW FOR GT'S TO COME OFFLINE AS LOAD DROPS OFF).. |
14-Jun-2005 22:41:17 | ISO UPDATES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/14/2005 22:00 FOR AST E/COR/JAM LOAD POCKET OVER NORMAL, CON EDISON REQUESTING OOM TO KEEP UNIT FROM BEING DISPATCHED DOWN (AS WELL AS TO ALLOW FOR GT'S TO COME OFFLINE AS LOAD DROPS OFF).. |
14-Jun-2005 23:42:21 | Metering Authority - Consolidated Edison of NY REQUESTS NYPA_____HELLGATE_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/15/2005 00:00 FOR CON EDISON REQUESTING NYPA HARLEM RIVER GT'S 1 AND 2, AND HELLGATE 1 AND 2 STAY ON OOM FOR CON ED LOCAL SECURITY DUE TO HIGH LOADS, AND FOR CON EDISON TO ALLOW FOR ASTORIA GT'S TO COME OFFLINE.. |
14-Jun-2005 23:42:46 | Metering Authority - Consolidated Edison of NY REQUESTS NYPA_____HELLGATE_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 23:00 FOR CON EDISON REQUESTING NYPA HARLEM RIVER GT'S 1 AND 2, AND HELLGATE 1 AND 2 STAY ON OOM FOR CON ED LOCAL SECURITY DUE TO HIGH LOADS, AND FOR CON EDISON TO ALLOW FOR ASTORIA GT'S TO COME OFFLINE.. |
14-Jun-2005 23:43:06 | Metering Authority - Consolidated Edison of NY REQUESTS NYPA_HARLEM__RVR__GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 23:00 FOR CON EDISON REQUESTING NYPA HARLEM RIVER GT'S 1 AND 2, AND HELLGATE 1 AND 2 STAY ON OOM FOR CON ED LOCAL SECURITY DUE TO HIGH LOADS, AND FOR CON EDISON TO ALLOW FOR ASTORIA GT'S TO COME OFFLINE.. |
14-Jun-2005 23:43:29 | Metering Authority - Consolidated Edison of NY REQUESTS NYPA_____HELLGATE_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/15/2005 00:00 FOR CON EDISON REQUESTING NYPA HARLEM RIVER GT'S 1 AND 2, AND HELLGATE 1 AND 2 STAY ON OOM FOR CON ED LOCAL SECURITY DUE TO HIGH LOADS, AND FOR CON EDISON TO ALLOW FOR ASTORIA GT'S TO COME OFFLINE.. |
14-Jun-2005 23:43:38 | Metering Authority - Consolidated Edison of NY REMOVES NYPA_____HELLGATE_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 23:00. |
14-Jun-2005 23:43:52 | Metering Authority - Consolidated Edison of NY REQUESTS NYPA_HARLEM__RVR__GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/15/2005 00:00 FOR CON EDISON REQUESTING NYPA HARLEM RIVER GT'S 1 AND 2, AND HELLGATE 1 AND 2 STAY ON OOM FOR CON ED LOCAL SECURITY DUE TO HIGH LOADS, AND FOR CON EDISON TO ALLOW FOR ASTORIA GT'S TO COME OFFLINE.. |
14-Jun-2005 23:43:59 | Metering Authority - Consolidated Edison of NY REMOVES NYPA_HARLEM__RVR__GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 23:00. |
14-Jun-2005 23:44:24 | Metering Authority - Consolidated Edison of NY REQUESTS NYPA_HARLEM__RVR__GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/15/2005 00:00 FOR CON EDISON REQUESTING NYPA HARLEM RIVER GT'S 1 AND 2, AND HELLGATE 1 AND 2 STAY ON OOM FOR CON ED LOCAL SECURITY DUE TO HIGH LOADS, AND FOR CON EDISON TO ALLOW FOR ASTORIA GT'S TO COME OFFLINE.. |
14-Jun-2005 23:49:36 | ISO REQUESTS ASTORIA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/15/2005 00:00 FOR ASTORIA 2 BEING BASEPOINTED DOWN BUT ISO SHOWING ASTORIA E / COR / JAM LOAD POCKET OVER NORMAL (RTD SHOWING POCKET SOLVED BUT REAL TIME NOT SOLVING). ISO PLACING UNIT OOM TO STOP UNIT BEING BASEPOINTED DOWN.. |
14-Jun-2005 23:49:55 | ISO REQUESTS ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/15/2005 00:00 FOR AST E/COR/JAM LOAD POCKET OVER NORMAL, CON EDISON REQUESTING OOM TO KEEP UNIT FROM BEING DISPATCHED DOWN (AS WELL AS TO ALLOW FOR GT'S TO COME OFFLINE AS LOAD DROPS OFF).. |
Insert Time | Message |
14-Jun-2005 11:39:46 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/15/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 11:39:47 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/15/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 11:40:37 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/15/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 11:40:37 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/15/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 11:40:38 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/15/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 11:40:38 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/15/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 11:41:20 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/15/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 11:41:20 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/15/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 11:41:21 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/15/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 11:41:21 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/15/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 11:41:50 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/15/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 11:41:50 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/15/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:36 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:37 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:37 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:38 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:38 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:38 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:39 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:39 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:39 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:40 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:40 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:40 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:41 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:41 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:42 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:42 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:43 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:43 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:43 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:44 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:44 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:44 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:45 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 12:25:45 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/15/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:15:56 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/14/2005 18 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:15:56 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/14/2005 19 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:15:56 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/14/2005 20 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:15:56 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/14/2005 21 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:15:56 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/14/2005 23 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:15:56 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/14/2005 22 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:19 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 07 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:19 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:20 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:21 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:22 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 11 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:22 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:23 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:23 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:23 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:23 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:24 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 17 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:25 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 18 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:25 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 19 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:25 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 20 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:26 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 21 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 13:35:26 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/15/2005 22 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 14:31:41 | Generator: NSINS_S._GLNS_FALLS scheduled for local reliability in DAM market for 06/15/2005 07 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 14:31:41 | Generator: NSINS_S._GLNS_FALLS scheduled for local reliability in DAM market for 06/15/2005 09 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 14:31:41 | Generator: NSINS_S._GLNS_FALLS scheduled for local reliability in DAM market for 06/15/2005 08 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 14:31:41 | Generator: NSINS_S._GLNS_FALLS scheduled for local reliability in DAM market for 06/15/2005 10 Energy = 46 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 14:32:16 | Generator: NSINS_S._GLNS_FALLS scheduled for local reliability in DAM market for 06/15/2005 17 Energy = 46 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 14:32:16 | Generator: NSINS_S._GLNS_FALLS scheduled for local reliability in DAM market for 06/15/2005 18 Energy = 46 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 14:32:16 | Generator: NSINS_S._GLNS_FALLS scheduled for local reliability in DAM market for 06/15/2005 20 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
14-Jun-2005 14:32:16 | Generator: NSINS_S._GLNS_FALLS scheduled for local reliability in DAM market for 06/15/2005 19 Energy = 47 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |