NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
10-Jun-2005 05:52:53Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 05:00 FOR steam security.
10-Jun-2005 06:05:58Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 06:00 FOR steam security.
10-Jun-2005 06:48:10Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 06:00 FOR steam security.
10-Jun-2005 08:21:43Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 08:00 FOR Steam system.
10-Jun-2005 08:31:05Metering Authority - Consolidated Edison of NY UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 08:00 FOR Steam system.
10-Jun-2005 08:31:20Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 09:00 FOR Steam system.
10-Jun-2005 08:52:44Metering Authority - Long Island Power Authority UPDATES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 08:00 FOR 69KV SECURITY.
10-Jun-2005 09:18:09Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 09:00 FOR STEAM SENDOUT.
10-Jun-2005 09:29:1006/10/2005 09:27:41 NYISO large event reserve pick-up executed.
10-Jun-2005 09:30:00ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/10/2005 09:00 FOR RSV P-U.
10-Jun-2005 09:32:49ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/10/2005 09:00 FOR SPEED NO LOAD.
10-Jun-2005 09:39:40Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT1_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 09:00 FOR FOR UNIT LOSS.
10-Jun-2005 09:39:42Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT1_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 09:00 FOR FOR UNIT LOSS.
10-Jun-2005 09:39:44Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT1_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 09:00 FOR FOR UNIT LOSS.
10-Jun-2005 09:39:46Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT1_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 09:00 FOR FOR UNIT LOSS.
10-Jun-2005 09:43:19Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT1_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 09:00 FOR FOR UNIT LOSS.
10-Jun-2005 09:44:08Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 09:00 FOR FOR UNIT LOSS.
10-Jun-2005 09:44:15Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 09:00 FOR FOR UNIT LOSS.
10-Jun-2005 09:44:21Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 09:00 FOR FOR UNIT LOSS.
10-Jun-2005 09:44:27Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 09:00 FOR FOR UNIT LOSS.
10-Jun-2005 09:44:33Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 09:00 FOR FOR UNIT LOSS.
10-Jun-2005 09:45:02ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/10/2005 09:00.
10-Jun-2005 09:45:20ISO UPDATES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/10/2005 09:00 FOR SPEED NO LOAD.
10-Jun-2005 09:59:29Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 10:00 FOR STEAM SECURITY.
10-Jun-2005 10:10:11Metering Authority - Long Island Power Authority UPDATES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 10:00 FOR 69KV SECURITY.
10-Jun-2005 10:34:51Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 10:00 FOR steam security.
10-Jun-2005 11:24:33ISO UPDATES OSWEGO___6 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/10/2005 11:00 FOR FOR OSWEGO COMPLEX STABILITY.
10-Jun-2005 11:49:11Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 11:00.
10-Jun-2005 11:49:40Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 11:00.
10-Jun-2005 11:49:55Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 11:00.
10-Jun-2005 11:50:10Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 11:00.
10-Jun-2005 11:51:25Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 11:00.
10-Jun-2005 11:51:59Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 11:00.
10-Jun-2005 11:52:09Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 11:00.
10-Jun-2005 12:03:43Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 12:00.
10-Jun-2005 12:04:03Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 12:00.
10-Jun-2005 12:04:21Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 12:00.
10-Jun-2005 13:26:01Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 13:00 FOR local security, to secure feeders.
10-Jun-2005 13:39:30Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 13:00 FOR Local security to secure feeders.
10-Jun-2005 13:39:52Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 13:00 FOR local security, to secure feeders.
10-Jun-2005 17:24:17Metering Authority - Consolidated Edison of NY REMOVES EAST_RIVER___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 17:00.
10-Jun-2005 17:26:28Metering Authority - Consolidated Edison of NY REMOVES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 17:00.
10-Jun-2005 18:06:18Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 18:00 FOR Local security to secure feeders.
10-Jun-2005 18:09:25HQ initiated curtailment cut 1669 MWs.
10-Jun-2005 20:14:0506/10/2005 20:12:43 NYISO large event reserve pick-up executed.
10-Jun-2005 20:15:52ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/10/2005 20:00 FOR KINTIGH RUNBACK.
10-Jun-2005 20:17:43ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/10/2005 20:00 FOR KINTIGH RUNBACK.
10-Jun-2005 20:23:49ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/10/2005 20:00.
10-Jun-2005 20:40:28ISO REMOVES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/10/2005 20:00.
10-Jun-2005 22:04:46ISO REMOVES OSWEGO___6 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/10/2005 22:00.
10-Jun-2005 22:11:06Metering Authority - Long Island Power Authority UPDATES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/10/2005 22:00 FOR FEEDWATER CONTROL VALVE.

Committed for Reliability

Back to top
Insert TimeMessage
10-Jun-2005 11:17:22Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 00 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:22Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 01 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:22Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 02 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:23Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 03 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:23Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 05 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:23Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 04 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:24Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 06 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:24Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 07 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:24Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 08 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:25Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 09 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:25Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 10 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:25Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 11 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:26Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 12 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:26Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 15 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:26Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 14 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:26Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 13 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:27Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 16 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:27Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 17 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:27Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 18 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:27Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 19 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:28Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 20 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:28Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 23 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:28Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 22 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:17:28Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/11/2005 21 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:18:24Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/11/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:18:24Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/11/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 11:18:52Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/11/2005 23 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:01Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 08 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:02Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 09 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:02Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 10 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:02Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 11 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:03Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 12 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:03Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 13 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:03Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 14 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:04Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 15 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:04Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 17 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:04Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 16 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:05Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 18 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:05Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 19 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:05Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:05Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:06Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:31:06Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 06/11/2005 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:33:42Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/11/2005 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:33:42Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/11/2005 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:33:43Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/11/2005 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:33:43Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/11/2005 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:33:43Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/11/2005 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:33:43Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/11/2005 05 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:33:44Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/11/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:33:44Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/11/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:33:44Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/11/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:33:44Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/11/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
10-Jun-2005 13:33:45Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/11/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
10-Jun-2005 13:25:09The Real Time Energy prices have been updated on OASIS for 06/02/2005 in hours (4,6,22,23)
10-Jun-2005 13:25:31The Real TimeUpdate of the Real time Ancillary prices in the MIS for 06/02/2005 resulted in no hours changing.
10-Jun-2005 16:18:04The Hour Ahead Market (HAM) ANCILLARY prices have been updated in the MIS for 06/03/2005 in hours (12,13)
10-Jun-2005 16:19:22The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 06/03/2005 in hours (6,11,12,13)
10-Jun-2005 16:20:13The Real Time Energy prices have been updated in the MIS for 06/01/2005 in hours (07,08,09,10,11,12,13,21,22)
10-Jun-2005 16:20:29The Real Time ANCILLARY prices have been updated in the MIS for 06/01/2005 in hours (10,13,21)
10-Jun-2005 16:23:47The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 06/05/2005 in hours (00,09)
10-Jun-2005 16:41:06NYISO is reserving hours beginning 4, 9, 11, 12, and 15-18 in the June 9, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. NYISO is reserving hours beginning 0, 7, 9, 13-15, 17 and 19-23 in the June 9, 2005 Hour-Ahead Market, encompassing Energy, Regulation and Operating Reserve prices. Prices in the June 10, 2005 Day-Ahead Market are correct.
10-Jun-2005 16:45:18The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 06/04/2005 in hours (06,07,08,09)
10-Jun-2005 16:45:56The Real Time Energy prices have been updated in the MIS for 06/04/2005 in hours (00,02,04,06,07,08,09,17,20,22,23)
10-Jun-2005 16:46:08The Real Time ANCILLARY prices have been updated in the MIS for 06/04/2005 in hours (07,09,22)
10-Jun-2005 16:50:58Correction- The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 06/05/2005 in hour (09) .
10-Jun-2005 16:52:57The Real Time Energy prices have been updated on OASIS for 06/05/2005 in hours (00,09)
10-Jun-2005 17:06:51Correction- The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 06/03/2005 in hours (11,12,13).
10-Jun-2005 17:08:02The Real Time Energy prices have been updated on Oasis for 06/03/2005 in hours (06,08).
10-Jun-2005 17:08:35The Real Time ANCILLARY prices have been updated in the MIS for 06/03/2005 in hours (08).