P-2511-Jun-2005

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
11-Jun-2005 00:02:03BARRETT___2 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 06/10/2005 23:59.
11-Jun-2005 00:02:0374TH STREET_GT_1 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 06/10/2005 23:59.
11-Jun-2005 00:02:0374TH STREET_GT_2 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 06/10/2005 23:59.
11-Jun-2005 01:20:48Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 01:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 01:21:57Metering Authority - Niagara Mohawk REQUESTS DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 01:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 01:34:18Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 01:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 01:34:38Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 01:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 01:45:10Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 01:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 01:45:34Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 01:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 05:31:31Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 05:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 05:31:57Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 05:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 06:04:17Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 06:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 06:04:46Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 06:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 08:03:3906/11/2005 08:01:57 NYISO large event reserve pick-up executed.
11-Jun-2005 08:13:2406/11/2005 08:12:09 NYISO large event reserve pick-up executed.
11-Jun-2005 08:38:33Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 08:00 FOR steam security.
11-Jun-2005 09:47:39Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 09:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 09:47:57Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 09:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 10:43:40Metering Authority - Consolidated Edison of NY REQUESTS NYPA_HARLEM__RVR__GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 11:00 FOR For Con Ed feeder work.
11-Jun-2005 10:44:48Metering Authority - Consolidated Edison of NY REQUESTS NYPA_HARLEM__RVR__GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 11:00 FOR For Con Ed feeder work.
11-Jun-2005 11:12:06Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 11:00 FOR Con Ed Feeder work.
11-Jun-2005 11:12:41Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 11:00 FOR Con Ed Feeder work.
11-Jun-2005 11:13:52Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 12:00.
11-Jun-2005 11:14:24Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 11:00 FOR Con Ed Feeder work.
11-Jun-2005 11:15:04Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 11:00 FOR Con Ed Feeder work.
11-Jun-2005 11:15:42Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 11:00 FOR Con Ed Feeder work.
11-Jun-2005 11:16:20Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 11:00 FOR Con Ed Feeder work.
11-Jun-2005 11:34:48Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 11:00 FOR CE DOES NOT WANT TO START, MUST TAKE BANK O/S TO START.
11-Jun-2005 11:35:13Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 11:00 FOR CE DOES NOT WANT TO START, MUST TAKE BANK O/S TO START.
11-Jun-2005 11:35:37Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 11:00 FOR CE DOES NOT WANT TO START, MUST TAKE BANK O/S TO START.
11-Jun-2005 11:36:29Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 11:00 FOR SWAPPING TO EAST YARD, SINGLE LEG OPERATION.
11-Jun-2005 12:17:59Metering Authority - Consolidated Edison of NY UPDATES ASTORIA___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 12:00 FOR SWAPPING TO EAST YARD, SINGLE LEG OPERATION.
11-Jun-2005 12:23:31Metering Authority - Consolidated Edison of NY UPDATES NYPA_HARLEM__RVR__GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 12:00 FOR For Con Ed feeder work.
11-Jun-2005 12:29:48Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 12:00 FOR Con Ed Feeder work.
11-Jun-2005 12:33:32Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 12:00 FOR Load pocket security.
11-Jun-2005 12:34:16Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 12:00 FOR Con Ed Load Pocket security.
11-Jun-2005 12:37:39Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 12:00.
11-Jun-2005 12:38:03Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 12:00.
11-Jun-2005 12:38:15Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 12:00.
11-Jun-2005 12:46:14Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 13:00 FOR Con Ed load pocket security.
11-Jun-2005 13:07:58Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 13:00.
11-Jun-2005 13:08:25Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 13:00.
11-Jun-2005 13:29:34Metering Authority - Consolidated Edison of NY REMOVES ASTORIA___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 13:00.
11-Jun-2005 13:29:45Metering Authority - Consolidated Edison of NY REMOVES ASTORIA___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 13:00.
11-Jun-2005 13:29:58Metering Authority - Consolidated Edison of NY REMOVES ASTORIA___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 13:00.
11-Jun-2005 13:32:00Metering Authority - Consolidated Edison of NY REMOVES NYPA_HARLEM__RVR__GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 13:00.
11-Jun-2005 13:32:15Metering Authority - Consolidated Edison of NY REMOVES NYPA_HARLEM__RVR__GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 13:00.
11-Jun-2005 13:39:50Metering Authority - Consolidated Edison of NY UPDATES NYPA_HARLEM__RVR__GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 13:00 FOR Switching.
11-Jun-2005 13:40:25Metering Authority - Consolidated Edison of NY UPDATES NYPA_HARLEM__RVR__GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 13:00 FOR Switching feeders back in.
11-Jun-2005 13:41:39Metering Authority - Consolidated Edison of NY UPDATES NYPA_HARLEM__RVR__GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 14:00 FOR Switching feeders.
11-Jun-2005 13:42:45Metering Authority - Consolidated Edison of NY UPDATES NYPA_HARLEM__RVR__GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 14:00 FOR Switching feeders.
11-Jun-2005 14:18:08Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 14:00 FOR Load pocket security..
11-Jun-2005 14:18:46Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 14:00 FOR Load pocket security.
11-Jun-2005 14:46:11Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 14:00 FOR Local security for line outage.
11-Jun-2005 14:47:13Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 14:00 FOR Local security for line outage.
11-Jun-2005 14:47:51Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 14:00 FOR Loacal security for line outage.
11-Jun-2005 15:26:58Metering Authority - Niagara Mohawk UPDATES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 15:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 15:27:19Metering Authority - Niagara Mohawk UPDATES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 15:00 FOR L/O 73/74 TOWER ON 141 LINE.
11-Jun-2005 15:52:10Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT4_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 15:00 FOR Load pocket security..
11-Jun-2005 15:52:30Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT4_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 15:00 FOR Load pocket security.
11-Jun-2005 16:51:12Metering Authority - Niagara Mohawk REMOVES DUNKIRK___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 16:00.
11-Jun-2005 16:51:26Metering Authority - Niagara Mohawk REMOVES DUNKIRK___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 16:00.
11-Jun-2005 18:14:24Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 18:00.
11-Jun-2005 18:14:45Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 18:00.
11-Jun-2005 18:14:56Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 18:00.
11-Jun-2005 18:15:12Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 18:00.
11-Jun-2005 18:15:25Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/11/2005 18:00.
11-Jun-2005 19:27:2606/11/2005 19:24:13 NYISO large event reserve pick-up executed.
11-Jun-2005 22:33:49Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/12/2005 00:00 FOR steam security.

Committed for Reliability

Back to top
Insert TimeMessage
11-Jun-2005 11:46:02Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 00 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:03Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 01 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:03Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 03 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:03Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 02 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:04Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 04 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:04Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 06 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:04Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 05 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 07 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 08 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 09 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:06Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 10 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:06Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 12 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:06Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 11 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:07Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 13 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:07Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 16 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:07Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 14 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:07Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 15 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:08Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 17 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:08Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 19 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:08Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 18 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:09Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 20 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:09Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 22 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:09Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 21 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:10Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/12/2005 23 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:42Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 00 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:43Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 01 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:43Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 03 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:43Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 04 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:43Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 02 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:44Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 05 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:44Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 08 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:44Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 06 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:44Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 07 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:45Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 09 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:45Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 11 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:45Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 12 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:45Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 10 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:46Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 13 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:46Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 16 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:46Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 14 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:46Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 15 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:47Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 17 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:47Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 19 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:47Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 18 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:48Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 20 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:48Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 23 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:48Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 22 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 11:46:48Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/12/2005 21 Energy = 65 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 13:57:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 13:58:01Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 13:58:04Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 13:58:09Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 13:58:12Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 13:58:15Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 13:58:18Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 13:58:21Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 13:58:24Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 13:58:27Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 13:58:30Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 13:58:33Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 13:58:36Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
11-Jun-2005 16:47:35Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/12/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
11-Jun-2005 13:48:42NYISO is reserving HB 15 - 23 in the June 10, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. NYISO is reserving HB 16 - 23 in the June 10, 2005 Hour-Ahead Market, encompassing Energy, Regulation and Operating Reserve prices. Prices in the June 11, 2005 Day-Ahead Market are correct.
11-Jun-2005 13:50:51The Real Time ANCILLARY prices have been updated in the MIS for 06/06/2005 in hours (12,15)
11-Jun-2005 13:51:35The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 06/06/2005 in hours (09,10,11,12,13,14,15,16,17,18,19,20,21,22,23)
11-Jun-2005 13:55:31The Real Time Energy prices have been updated on OASIS for 06/06/2005 in hours (04,05,06,09,10,11,12,13,14,15,16,17,18,19,20,21,22,23)