23-Jun-2005 14:03:26Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/23/2005 14:00 FOR SUPPLYING SYSTEM STEAM.
23-Jun-2005 14:06:31Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/23/2005 14:00 FOR SUPPLYING CON ED SYSTEM STEAM.
23-Jun-2005 22:34:26Metering Authority - Consolidated Edison of NY REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/23/2005 22:00.
23-Jun-2005 23:05:45ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 06/23/2005 23:00 FOR NOX ISSUES WITH EXPECTED LOADS FOR 6/24. UNIT NEEDED TO RUN AT THIS LEVEL IN ORDER TO FULFILL NOX REQUIREMENTS WITH ASTORIA GT'S ON IN EAST YARD..
23-Jun-2005 23:06:07ISO REQUESTS ARTHUR_KILL_2 OUT OF MERIT. COMMITTED FOR ISO RESERVES AT START TIME 06/24/2005 00:00 FOR NOX ISSUES WITH EXPECTED LOADS FOR 6/24. UNIT NEEDED TO RUN AT THIS LEVEL IN ORDER TO FULFILL NOX REQUIREMENTS WITH ASTORIA GT'S ON IN EAST YARD..

Committed for Reliability

Back to top
Insert TimeMessage
23-Jun-2005 10:53:14Generator: BARRETT___1 scheduled for local reliability in DAM market for 06/24/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:53:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:53:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:53:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:53:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:53:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:00Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 05 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:00Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:00Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:00Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:01Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:01Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:01Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:02Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:02Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:02Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:03Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:03Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:03Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:04Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:04Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:04Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:05Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:05Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:05Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:45Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/24/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:46Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/24/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:54:46Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/24/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:55:26Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/24/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 10:55:26Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/24/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 11:12:29Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 06/24/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 11:13:27Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 22 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 11:13:27Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 06/24/2005 23 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 11:41:45Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/24/2005 08 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 11:41:46Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/24/2005 09 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 11:41:46Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/24/2005 10 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 11:42:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/24/2005 19 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 11:42:14Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/24/2005 20 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 11:42:14Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/24/2005 21 Energy = 63 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:40:26Generator: ONONDAGA___COGEN scheduled for local reliability in DAM market for 06/24/2005 09 Energy = 60 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:40:27Generator: ONONDAGA___COGEN scheduled for local reliability in DAM market for 06/24/2005 10 Energy = 60 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:40:27Generator: ONONDAGA___COGEN scheduled for local reliability in DAM market for 06/24/2005 12 Energy = 60 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:40:27Generator: ONONDAGA___COGEN scheduled for local reliability in DAM market for 06/24/2005 11 Energy = 60 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:40:27Generator: ONONDAGA___COGEN scheduled for local reliability in DAM market for 06/24/2005 13 Energy = 60 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:40:28Generator: ONONDAGA___COGEN scheduled for local reliability in DAM market for 06/24/2005 14 Energy = 60 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:40:28Generator: ONONDAGA___COGEN scheduled for local reliability in DAM market for 06/24/2005 15 Energy = 60 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:40:28Generator: ONONDAGA___COGEN scheduled for local reliability in DAM market for 06/24/2005 16 Energy = 60 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:40:29Generator: ONONDAGA___COGEN scheduled for local reliability in DAM market for 06/24/2005 17 Energy = 60 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:40:29Generator: ONONDAGA___COGEN scheduled for local reliability in DAM market for 06/24/2005 18 Energy = 60 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:40:29Generator: ONONDAGA___COGEN scheduled for local reliability in DAM market for 06/24/2005 19 Energy = 60 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:40:29Generator: ONONDAGA___COGEN scheduled for local reliability in DAM market for 06/24/2005 20 Energy = 60 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:40:30Generator: ONONDAGA___COGEN scheduled for local reliability in DAM market for 06/24/2005 21 Energy = 60 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:56Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:56Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:57Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:57Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:57Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:57Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:57Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:57Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:57Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:57Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:57Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:57Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:57Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:58Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:58Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:58Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:58Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:58Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:58Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:58Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:58Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:58Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:59Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 13:42:59Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/24/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 15:31:27Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/24/2005 08 Energy = 51 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 15:31:27Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/24/2005 09 Energy = 50 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 15:31:27Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/24/2005 10 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 15:32:12Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/24/2005 18 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 15:32:12Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/24/2005 19 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 15:32:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/24/2005 20 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
23-Jun-2005 15:32:13Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/24/2005 21 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
23-Jun-2005 12:13:16The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 06/15/2005 in hours (08,09,10,11,12,13,14,15,16,17,18,19,20,21,22,23)
23-Jun-2005 12:15:50The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 06/16/2005 in hours (00,01,02,03,04,05,06,07,08,09,10,11,12,13,14,15,16,17,18,19,20,21,22,23)
23-Jun-2005 12:30:25The Real Time Energy prices have been updated in the MIS for 06/16/2005 in hours (00,01,02,03,04,05,06,07,08,09,10,11,12,13,14,15,16,17,18,19,20,21,22,23)
23-Jun-2005 12:43:34The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 06/17/2005 in hours (00,01,02,03,04,05,06,07,08,09,10,11,12,13,14,15,16)
23-Jun-2005 12:49:48The Real Time Energy prices have been updated in the MIS for 06/17/2005 in hours (00,01,02,03,04,05,06,07,08,09,10,11,12,13,14,15,16)
23-Jun-2005 12:57:28The Real Time Energy prices have been updated in the MIS for 06/18/2005 in hours (03,09)
23-Jun-2005 12:57:29The Real Time ANCILLARY prices have been updated in the MIS for 06/18/2005 in hours (03)
23-Jun-2005 14:11:31The Real Time Energy prices have been updated in the MIS for 06/15/2005 in hours (08,09,10,11,12,13,14,15,16,17,18,19,20,21,22,23)
23-Jun-2005 14:14:46NYISO is reserving HB 0-15 and 22 in the June 22, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. NYISO is reserving HB 0-15 in the June 22, 2005 Hour-Ahead Market, encompassing Energy, Regulation and Operating Reserve prices. Prices in the June 23, 2005 Day-Ahead Market are correct. (message 1 of 2)
23-Jun-2005 14:15:39The NYISO and LECG have determined that the Model_City_Energy gen bus has incorrect LBMPs, thus necessitating reservations in the RT and HAM Markets for HB 0-15. This issue does not affect any other bus or calculation. Additionally, the following hours are reserved in the Real Time Market for other reasons: HB 0, 2-4, 11, 15 and 22. (message 2 of 2)
23-Jun-2005 14:32:26The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 06/13/2005 in hours (00,01,02)
23-Jun-2005 14:32:33The Real Time Energy prices have been updated in the MIS for 06/13/2005 in hours (00,01,02,03,04,10,12,13)
23-Jun-2005 14:32:39The Real Time ANCILLARY prices have been updated in the MIS for 06/13/2005 in hours (12,13)
23-Jun-2005 14:32:47The Real Time Energy prices have been updated in the MIS for 06/14/2005 in hours (13)
23-Jun-2005 15:41:47The Real Time Energy prices have been updated in the MIS for 06/19/2005 in hours (01)
23-Jun-2005 15:41:48The Real Time ANCILLARY prices have been updated in the MIS for 06/19/2005 in hours (01)