Insert Time | Message |
20-Jun-2005 01:14:00 | ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 01:00 FOR FOR OVERGEN. |
20-Jun-2005 01:26:49 | ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 01:00. |
20-Jun-2005 03:14:44 | Metering Authority - Consolidated Edison of NY REQUESTS EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 03:00 FOR SUPPLYING STEAM TO CON ED SYSTEM. |
20-Jun-2005 04:13:51 | Metering Authority - Consolidated Edison of NY REMOVES EAST_RIVER___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 04:00. |
20-Jun-2005 04:44:33 | ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 05:00 FOR HELD ON FOR OVERGEN. |
20-Jun-2005 05:06:51 | ISO REMOVES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 05:00. |
20-Jun-2005 07:48:29 | Metering Authority - Long Island Power Authority UPDATES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/17/2005 23:00 FOR Modified existing OOM to accommodate SRE entry by TSA (prev code: Committed for ISO Reliability, prev comments: . Record deleted in current hour.)(SM). |
20-Jun-2005 07:50:28 | Metering Authority - Consolidated Edison of NY UPDATES POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/17/2005 22:00 FOR Modified existing OOM to accommodate SRE entry by TSA (prev code: Gen Derate, prev comments: . Record deleted in current hour.)(SM). |
20-Jun-2005 10:33:18 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 10:00 FOR To balance the Nox bubble caused by Astoria Gts being on line. The Gts are needed until Astoria steam becomes firm.. |
20-Jun-2005 10:33:39 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 10:00 FOR To balance the Nox bubble caused by Astoria Gts being on line. The Gts are needed until Astoria steam becomes firm.. |
20-Jun-2005 10:45:26 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 10:00 FOR To balance the Nox bubble caused by Astoria Gts being on line. The Gts are needed until Astoria steam becomes firm.. |
20-Jun-2005 11:02:53 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 11:00 FOR To balance the Nox bubble caused by Astoria Gts being on line. The Gts are needed until Astoria steam becomes firm.. |
20-Jun-2005 11:13:50 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 11:00 FOR To balance the Nox bubble caused by Astoria Gts being on line. The Gts are needed until Astoria steam becomes firm.. |
20-Jun-2005 11:24:26 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 11:00 FOR To balance the Nox bubble caused by Astoria Gts being on line. The Gts are needed until Astoria steam becomes firm.. |
20-Jun-2005 11:31:12 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 11:00 FOR Local security until Ast 3 Firm. |
20-Jun-2005 11:31:46 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 11:00 FOR Local security until Ast 3 Firm. |
20-Jun-2005 11:32:34 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 11:00 FOR Local security until Ast 3 Firm. |
20-Jun-2005 11:33:35 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 11:00 FOR Local security until Ast 3 Firm. |
20-Jun-2005 11:34:15 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 11:00 FOR Local security until Ast 3 Firm. |
20-Jun-2005 11:34:57 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 11:00 FOR Local security until Ast 3 Firm. |
20-Jun-2005 11:35:28 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 11:00 FOR Local security until Ast 3 Firm. |
20-Jun-2005 11:36:11 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 11:00 FOR Local security until Ast 3 Firm. |
20-Jun-2005 11:39:54 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 11:00 FOR To balance the Nox bubble caused by Astoria Gts being on line. The Gts are needed until Astoria steam becomes firm.. |
20-Jun-2005 11:55:39 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 11:00 FOR Local security until Ast 3 Firm. |
20-Jun-2005 12:53:11 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 12:00 FOR To balance the Nox bubble caused by Astoria Gts being on line. The Gts are needed until Astoria steam becomes firm.. |
20-Jun-2005 13:08:24 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 13:00. |
20-Jun-2005 13:08:33 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 13:00. |
20-Jun-2005 13:08:42 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 13:00. |
20-Jun-2005 13:08:54 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 13:00. |
20-Jun-2005 13:09:04 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 13:00. |
20-Jun-2005 13:09:14 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 13:00. |
20-Jun-2005 13:09:25 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 13:00. |
20-Jun-2005 13:09:34 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 13:00. |
20-Jun-2005 13:09:44 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 13:00. |
20-Jun-2005 13:12:39 | ISO REMOVES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 13:00. |
20-Jun-2005 13:19:12 | ISO UPDATES ARTHUR_KILL_2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 13:00 FOR Nox. |
20-Jun-2005 15:05:27 | ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 15:00 FOR ISO Overgen. |
20-Jun-2005 15:07:19 | Metering Authority - Consolidated Edison of NY REQUESTS RAVENSWOOD___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 15:00 FOR M52 over normal. |
20-Jun-2005 15:10:34 | ISO UPDATES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 15:00 FOR ISO Overgen. |
20-Jun-2005 15:13:20 | Metering Authority - Consolidated Edison of NY REQUESTS POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 15:00 FOR M52 over Normal. |
20-Jun-2005 15:39:29 | Metering Authority - Consolidated Edison of NY UPDATES POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 15:00 FOR M52 over Normal. |
20-Jun-2005 15:39:47 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 15:00 FOR M52 over normal. |
20-Jun-2005 15:47:50 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 15:00 FOR M52 over normal. |
20-Jun-2005 15:48:27 | Metering Authority - Consolidated Edison of NY REMOVES POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 15:00. |
20-Jun-2005 15:48:47 | Metering Authority - Consolidated Edison of NY REMOVES RAVENSWOOD___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/20/2005 15:00. |
20-Jun-2005 16:05:16 | ISO REMOVES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/20/2005 16:00. |
20-Jun-2005 17:08:10 | 06/20/2005 17:06:05 NYISO large event reserve pick-up executed. |
Insert Time | Message |
20-Jun-2005 11:17:40 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/20/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 11:17:51 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/20/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 11:18:00 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/20/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 11:18:13 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/20/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 11:18:23 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/20/2005 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 11:18:32 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/20/2005 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 11:18:40 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/20/2005 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 11:18:47 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/20/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 11:18:58 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/20/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 11:19:13 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/20/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 11:19:26 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/20/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:04 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:04 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:04 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:04 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:04 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:05 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:06 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:06 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:06 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:06 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:16:06 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/21/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:56:35 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/21/2005 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:56:44 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/21/2005 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:56:53 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/21/2005 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:57:01 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/21/2005 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:57:19 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/21/2005 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
20-Jun-2005 14:57:31 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/21/2005 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
Insert Time | Message |
20-Jun-2005 08:44:31 | The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 06/10/2005 in hours (19,20,21,22) |
20-Jun-2005 11:44:06 | The Real Time Energy prices have been updated in the MIS for 06/12/2005 in hours (21) |
20-Jun-2005 13:26:08 | The Real Time Energy prices have been updated in the MIS for 06/10/2005 in hours (15,16,18,19,20,21) |
20-Jun-2005 13:26:09 | The Real Time ANCILLARY prices have been updated in the MIS for 06/10/2005 in hours (15,16) |
20-Jun-2005 15:54:08 | NYISO is reserving hours beginning 1:00 thru 6:00, 18:00 and 21:00 in the March 19, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. Prices in the March 19, 2005 Hour-Ahead Market, encompassing Energy, Regulation and Operating Reserve are correct. Prices in the March 20, 2005 Day-Ahead Market are correct.
|
20-Jun-2005 16:18:28 | Please disregard the previous message. The correct reservations are as follows: NYISO is reserving hours beginning 1:00 thru 6:00, 18:00 and 21:00 in the June 19, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. Prices in the June 19, 2005 Hour-Ahead Market, encompassing Energy, Regulation and Operating Reserve are correct. Prices in the June 20, 2005 Day-Ahead Market are correct. |