P-2506-Jun-2005

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
06-Jun-2005 00:02:12EAST RIVER___6 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 06/05/2005 23:59.
06-Jun-2005 07:59:24Metering Authority - Rochester Gas and Electric REQUESTS GINNA____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 07:00 FOR LRR TOWER CONTINGENCY 911/912 MUST REDUCE UNIT OUTPUT TO 100MW FOR CONTINGENCY.
06-Jun-2005 08:01:30Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 08:00 FOR STEAM SENDOUT.
06-Jun-2005 09:04:02Metering Authority - Rochester Gas and Electric REMOVES GINNA____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 09:00.
06-Jun-2005 09:10:47HQ initiated curtailment cut 80 MWs.
06-Jun-2005 09:24:10HQ initiated curtailment cut 200 MWs.
06-Jun-2005 09:25:58HQ initiated curtailment cut 200 MWs.
06-Jun-2005 11:14:39Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 11:00 FOR FOR LOSS OF 138-888 ON 69-850, 69KV SECURITY.
06-Jun-2005 11:26:32Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 11:00 FOR LOSS OF 138-888 ON 69-850, 69KV SECURITY.
06-Jun-2005 11:27:05Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 11:00 FOR UNIT NOT STARTING.
06-Jun-2005 11:30:01Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/03/2005 16:00 FOR Modified existing OOM to accommodate SRE entry by TSA (prev code: Gen derate, prev comments: lube oil pump problem)(SM).
06-Jun-2005 11:31:43Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/03/2005 08:00 FOR Modified existing OOM to accommodate SRE entry by TSA (prev code: Gen Derate, prev comments: Unit not due on until about 10:00)(SM).
06-Jun-2005 12:21:56Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 12:00 FOR STEAM SENDOUT.
06-Jun-2005 12:24:31Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 12:00 FOR UNIT COMING OFF FORCED.
06-Jun-2005 12:37:52ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/06/2005 12:00 FOR SAR W/ PJM FOR LOSS OF SUSQUEHANNA #2 @ 1118.
06-Jun-2005 12:40:0106/06/2005 12:38:43 NYISO large event reserve pick-up executed.
06-Jun-2005 12:43:38NPX initiated curtailment cut 87 MWs.
06-Jun-2005 12:50:00ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/06/2005 12:00.
06-Jun-2005 13:11:39Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 13:00 FOR LOSS OF 138-888 ON 69-850, 69KV SECURITY.
06-Jun-2005 13:27:53Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 13:00 FOR OVERLOADING 69KV BANKS.
06-Jun-2005 13:40:31Metering Authority - Long Island Power Authority UPDATES HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 14:00 FOR OVERLOADING 69KV BANK.
06-Jun-2005 13:40:55Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 13:00 FOR OVERLOADING 69KV BANK.
06-Jun-2005 13:49:08Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 13:00 FOR OVERLOAD ON 69KV BANK.
06-Jun-2005 14:02:5306/06/2005 13:59:19 NYISO large event reserve pick-up executed.
06-Jun-2005 14:22:33ISO UPDATES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/06/2005 14:00 FOR UNIT KEPT AT CURRENT OUTPUT DURING RESERVE PICKUP, SCHEDULED OFF, KEPT ON @ 36MW.
06-Jun-2005 14:22:42ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/06/2005 14:00.
06-Jun-2005 14:23:44Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 14:00.
06-Jun-2005 14:44:07Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 14:00 FOR OVERLOAD ON 69KV BANK.
06-Jun-2005 15:02:21Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 15:00 FOR OVERLOAD ON 69KV BANK.
06-Jun-2005 15:28:34ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/06/2005 15:00 FOR UNIT REQUESTED DOWN TO 2000 FROM 2380MW.
06-Jun-2005 15:36:16ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/06/2005 15:00.
06-Jun-2005 16:36:23Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 16:00 FOR STEAM SENDOUT.
06-Jun-2005 16:36:48Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 16:00 FOR STEAM SENDOUT.
06-Jun-2005 16:58:57Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT1_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 16:59:20Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00.
06-Jun-2005 16:59:47Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:00:22Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:00:46Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:01:18Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:01:41Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:02:00Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:02:22Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:02:40Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:03:37Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:04:01Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:05:38Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:06:06Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:06:58Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:07:27Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:08:38Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:09:02Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:16:36Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:20:20Metering Authority - Consolidated Edison of NY UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR SILICA & LOAD POCKET SECURITY.
06-Jun-2005 17:30:10Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:30:40Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:31:05Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:31:35Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:31:58Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT4_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:39:34Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR FOR TSA.
06-Jun-2005 17:39:57Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR FOR TSA.
06-Jun-2005 17:40:29Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR FOR TSA.
06-Jun-2005 17:40:54Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:41:27Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:42:16Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:42:56Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_13 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:43:28Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_12 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00 FOR FOR TSA.
06-Jun-2005 17:44:53Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR FOR TSA.
06-Jun-2005 17:45:27Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR FOR TSA.
06-Jun-2005 17:45:48Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR FOR TSA.
06-Jun-2005 17:46:12Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR FOR TSA.
06-Jun-2005 17:46:39Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR FOR TSA.
06-Jun-2005 17:47:13Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR FOR TSA.
06-Jun-2005 17:50:54Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR FOR TSA.
06-Jun-2005 17:52:19Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_11 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR FOR TSA.
06-Jun-2005 17:54:16Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR FOR TSA.
06-Jun-2005 17:54:46Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR FOR TSA.
06-Jun-2005 17:55:15Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 17:55:37Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 17:56:50Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00.
06-Jun-2005 17:57:03Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00.
06-Jun-2005 17:57:12Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00.
06-Jun-2005 17:57:23Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00.
06-Jun-2005 17:57:33Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00.
06-Jun-2005 17:57:42Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00.
06-Jun-2005 17:57:51Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00.
06-Jun-2005 17:58:01Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 17:00.
06-Jun-2005 18:00:50Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:01:06Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:01:16Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:01:26Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:01:35Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:01:45Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:01:53Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:02:06Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:03:03Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:03:22Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:03:39Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:03:53Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:04:07Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:09:16Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:09:25Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:09:37Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:09:46Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:09:57Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:10:07Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:10:23Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:10:34Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:13:54Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_13 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:14:06Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_12 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:14:17Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_11 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:14:30Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:23:45Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT4_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:23:55Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:24:03Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00.
06-Jun-2005 18:28:03Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR . Record deleted in current hour..
06-Jun-2005 18:28:28Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR . Record deleted in current hour..
06-Jun-2005 18:28:55Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR . Record deleted in current hour..
06-Jun-2005 18:29:14Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR . Record deleted in current hour..
06-Jun-2005 18:29:37Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR . Record deleted in current hour..
06-Jun-2005 18:29:55Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR . Record deleted in current hour..
06-Jun-2005 18:30:16Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR . Record deleted in current hour..
06-Jun-2005 18:31:13Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 18:00 FOR . Record deleted in current hour..
06-Jun-2005 19:18:28Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 19:18:28Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 19:18:28Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 19:19:14Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 19:19:14Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 19:19:14Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 19:19:38Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00 FOR OFF LAST HOUR.
06-Jun-2005 19:20:53Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 19:21:16Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 19:21:38Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 19:21:54Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 19:22:14Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT3_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 19:48:51Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00.
06-Jun-2005 19:49:06Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 19:00.
06-Jun-2005 20:02:58Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 20:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 20:03:25Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 20:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 20:03:50Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 20:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 20:04:54Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 20:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 20:05:12Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 20:00 FOR . Record deleted in evaluating hour..
06-Jun-2005 20:05:31Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/06/2005 20:00 FOR . Record deleted in evaluating hour..

Committed for Reliability

Back to top
Insert TimeMessage
06-Jun-2005 08:55:19Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/06/2005 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 08:55:20Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/06/2005 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 08:55:20Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/06/2005 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 08:55:21Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/06/2005 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 08:55:21Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/06/2005 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 08:55:21Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/06/2005 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 08:55:21Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/06/2005 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 08:55:22Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/06/2005 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 08:55:22Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/06/2005 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 08:55:22Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/06/2005 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 08:55:22Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/06/2005 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 08:55:23Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/06/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 08:55:24Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/06/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 10:52:29Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/07/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:16:44Generator: BARRETT___1 scheduled for local reliability in DAM market for 06/07/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:47Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 00 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:48Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 01 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:48Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 02 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:48Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 04 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:48Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 03 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:49Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 05 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:49Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 07 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:49Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 06 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:49Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 08 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:50Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 09 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:50Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 10 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:50Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 11 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:51Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 12 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:51Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 13 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:51Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 15 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:51Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 14 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:52Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 16 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:52Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 19 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:52Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 18 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:52Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 17 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:53Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:53Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:53Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
06-Jun-2005 11:55:54Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/07/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
06-Jun-2005 14:02:18NYISO is reserving HB 0, 5, 8, 9, 16-19, 22 and 23 in the June 5, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. NYISO is reserving HB 9, 12, 13, 16-20, 22 and 23 in the June 5, 2005 Hour-Ahead Market, encompassing Energy, Regulation and Operating Reserve prices. Prices in the June 6, 2005 Day-Ahead Market are correct. (message 1 of 3)
06-Jun-2005 14:02:41The NYISO and LECG have determined that the Linden CoGen generator bus has incorrectly calculated LBMPs on this one specific bus, thus necessitating the reservations in the Real-Time and Hour-Ahead Markets for HB 9. This issue does not affect any other bus or calculation. The NYISO and LECG have determined that there may be an incorrect calculation of LBMPs on the proxy buses necessitating the reservations in Real Time for HB 0. (message 2 of 3)
06-Jun-2005 14:02:57Additionally, the following subset of hours are reserved in the Real Time Market for other reasons: HB 5, 8, 16-19, 22 and 23. (message 3 of 3)