Insert Time | Message |
15-Jun-2005 00:02:09 | EAST_RIVER___2 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 06/14/2005 23:59. |
15-Jun-2005 00:24:07 | Metering Authority - Consolidated Edison of NY REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/15/2005 00:00. |
15-Jun-2005 00:52:37 | ISO REQUESTS ASTORIA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/15/2005 02:00 FOR ASTORIA 2 BEING BASEPOINTED DOWN BUT ISO SHOWING ASTORIA E / COR / JAM LOAD POCKET OVER NORMAL (RTD SHOWING POCKET SOLVED BUT REAL TIME NOT SOLVING). ISO PLACING UNIT OOM TO STOP UNIT BEING BASEPOINTED DOWN.. |
15-Jun-2005 00:52:53 | ISO REQUESTS ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/15/2005 02:00 FOR AST E/COR/JAM LOAD POCKET OVER NORMAL, CON EDISON REQUESTING OOM TO KEEP UNIT FROM BEING DISPATCHED DOWN (AS WELL AS TO ALLOW FOR GT'S TO COME OFFLINE AS LOAD DROPS OFF).. |
15-Jun-2005 01:14:41 | Metering Authority - Long Island Power Authority REQUESTS BARRETT_IC_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/15/2005 01:00 FOR KEEPING UNIT ONLINE TO FACILITATE THE LOWERING OF NORTHPORT 4 (DUE TO DERATER OF NP4) DOWN TO 230.. |
15-Jun-2005 02:04:13 | ISO REQUESTS ASTORIA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/15/2005 03:00 FOR ASTORIA 2 BEING BASEPOINTED DOWN BUT ISO SHOWING ASTORIA E / COR / JAM LOAD POCKET OVER NORMAL (RTD SHOWING POCKET SOLVED BUT REAL TIME NOT SOLVING). ISO PLACING UNIT OOM TO STOP UNIT BEING BASEPOINTED DOWN.. |
15-Jun-2005 02:04:25 | ISO REQUESTS ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/15/2005 03:00 FOR AST E/COR/JAM LOAD POCKET OVER NORMAL, CON EDISON REQUESTING OOM TO KEEP UNIT FROM BEING DISPATCHED DOWN (AS WELL AS TO ALLOW FOR GT'S TO COME OFFLINE AS LOAD DROPS OFF).. |
15-Jun-2005 02:26:33 | Metering Authority - Long Island Power Authority REMOVES BARRETT_IC_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/15/2005 03:00. |
15-Jun-2005 02:35:34 | ISO REMOVES ASTORIA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/15/2005 03:00. |
15-Jun-2005 02:35:49 | ISO REMOVES ASTORIA___5 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/15/2005 03:00. |
15-Jun-2005 04:37:09 | ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/15/2005 05:00 FOR HELD ON TILL 0515 FOR ISO RELIABILITY - STAGGER PUMPS AGAINST LOAD PICKUP.. |
15-Jun-2005 08:58:41 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 22:00 FOR Modified existing OOM to accommodate SRE entry by TSA (prev code: ISO Reliability, prev comments: ASTORIA 2 BEING BASEPOINTED DOWN BUT ISO SHOWING ASTORIA E / COR / JAM LOAD POCKET OVER NORMAL (RTD SHOWING POCKET SOLVED BUT REAL TIME NOT SOLVING). ISO PLACING UNIT OOM TO STOP UNIT BEING BASEPOINTED DOWN.)(SM). |
15-Jun-2005 09:08:38 | Metering Authority - Consolidated Edison of NY UPDATES RAVENSWOOD___3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/14/2005 22:00 FOR Modified existing OOM to accommodate SRE entry by TSA (prev code: Gen Derate, prev comments: ID FAN BEARING)(SM). |
15-Jun-2005 10:29:08 | Metering Authority - Long Island Power Authority REQUESTS BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/15/2005 10:00 FOR 262 LINE CONTINGENCY.. |
15-Jun-2005 10:29:40 | Metering Authority - Long Island Power Authority REQUESTS BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/15/2005 10:00 FOR 262 LINE CONTINGENCY.. |
15-Jun-2005 10:33:57 | Metering Authority - Long Island Power Authority UPDATES BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/15/2005 10:00 FOR 262 LINE CONTINGENCY.. |
15-Jun-2005 10:34:17 | Metering Authority - Long Island Power Authority UPDATES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/15/2005 10:00 FOR 262 LINE CONTINGENCY.. |
15-Jun-2005 21:35:31 | Metering Authority - Long Island Power Authority REMOVES BARRETT___1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/15/2005 21:00. |
15-Jun-2005 21:36:14 | Metering Authority - Long Island Power Authority REMOVES BARRETT___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/15/2005 21:00. |
15-Jun-2005 23:09:36 | 06/15/2005 23:07:52 NYISO large event reserve pick-up executed. |
Insert Time | Message |
15-Jun-2005 11:51:35 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/16/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 11:51:35 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/16/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 11:51:35 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/16/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 11:51:35 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 06/16/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 11:52:46 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/16/2005 20 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 11:52:46 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/16/2005 21 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 11:52:47 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/16/2005 22 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 11:52:47 | Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/16/2005 23 Energy = 150 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 12:16:30 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 12:18:03 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 12:18:04 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:30:24 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:30:25 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:30:25 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:30:25 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:41:51 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 07 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:42:00 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 08 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:42:07 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 09 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:42:15 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 10 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:42:24 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 11 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:42:31 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 12 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:42:39 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 13 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:42:47 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 14 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:42:55 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 15 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:43:03 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 16 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:43:12 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 17 Energy = 48 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:43:20 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 18 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:43:28 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 19 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:43:35 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 20 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
15-Jun-2005 13:43:43 | Generator: SITHE___BATAVIA scheduled for local reliability in DAM market for 06/16/2005 21 Energy = 49 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
Insert Time | Message |
15-Jun-2005 15:07:51 | The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 06/07/2005 in hours (00,01,02,03,04,05,06,07,08,09,10,11,12,13,14,15,16,17,18,19,20,21,22,23) |
15-Jun-2005 15:08:05 | The Real Time Energy prices have been updated in the MIS for 06/07/2005 in hours (00,01,02,03,04,05,06,07,08,09,10,11,12,13,14,15,16,17,18,19,20,21,22,23) |
15-Jun-2005 15:08:32 | The Real Time ANCILLARY prices have been updated in the MIS for 06/07/2005 in hours (14) |
15-Jun-2005 15:58:17 | This notice has been revised to provide additional details regarding the Price Reservations for the June 10, 2005 HAM & RT markets. Please note: this notice does not modify the original hours reserved. NYISO is reserving HB 15-23 in the June 10, 2005 RT Market, encompassing Energy, Regulation and Operating Reserve prices. NYISO is reserving HB 16-23 in the June 10, 2005 HAM Market, encompassing Energy, Regulation and Operating Reserve prices. Prices in the June 11, 2005 DAM Market are correct. (msg 1 of 2) |
15-Jun-2005 15:58:43 | The NYISO and LECG have determined that the HQ proxy bus has incorrect LBMPs, thus necessitating reservations in the RT and HAM Markets for HB 18-21. This issue does not affect any other bus or calculation. Additionally, the following hours are reserved in the Real Time Market for other reasons: HB 15-18, 22 and 23. (msg 2 of 2) |
15-Jun-2005 16:07:23 | This notice has been revised to provide additional details regarding the Price Reservations for the June 11, 2005 HAM and RT markets. Note: this notice does not modify the original hours reserved. NYISO is reserving HB 3-5, 8 & 19 in the June 11, 2005 RT Market, encompassing Energy, Regulation and Operating Reserve prices. NYISO is reserving HB 3-5 & 20 in the June 11, 2005 HAM Market, encompassing Energy, Regulation and Reserve prices. Prices in the June 12, 2005 DAM Market are correct. (msg 1 of 2) |
15-Jun-2005 16:07:55 | The NYISO and LECG have determined that the NYPA_HARLEM_RVR_GT3 and NYPA_HARLEM_RVR_GT4 gen buses have incorrect LBMPs, thus necessitating reservations in the RT and HAM Markets for HB 3-5. This issue does not affect any other buses or calculations. Additionally, the following hours are reserved in the Real Time Market for other reasons: HB 8 and 19. (msg 2 of 2) |
15-Jun-2005 16:32:43 | NYISO is reserving HB 0 - 23 in the June 14, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. NYISO is reserving HB 0 - 23 in the June 14, 2005 Hour-Ahead Market, encompassing Energy, Regulation and Operating Reserve. Prices in the June 15, 2005 Day-Ahead Market are correct. |