Insert Time | Message |
02-Apr-2005 09:17:55 | PJM initiated curtailment cut 150 MWs. pjm conjestion. |
02-Apr-2005 11:52:40 | Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT1_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 11:00 FOR TO MATCH CON ED. |
02-Apr-2005 11:52:44 | Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT1_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 11:00 FOR TO MATCH CON ED. |
02-Apr-2005 11:53:10 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 11:00. |
02-Apr-2005 11:54:41 | Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 11:00 FOR TO MATCH CON ED. |
02-Apr-2005 11:54:44 | Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 11:00 FOR TO MATCH CON ED. |
02-Apr-2005 11:56:16 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 11:00. |
02-Apr-2005 12:12:37 | Metering Authority - Consolidated Edison of NY REQUESTS POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 12:00 FOR BY CON ED DUE TO TRANSMISSION LOSS ON SYSTEM.. |
02-Apr-2005 12:14:28 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 12:00 FOR WATERSIDE. |
02-Apr-2005 12:21:58 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 12:00. |
02-Apr-2005 12:34:42 | Metering Authority - Consolidated Edison of NY REMOVES POLETTI____ OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 12:00. |
02-Apr-2005 12:49:15 | Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 12:00 FOR TRANSMISSION OUTAGE. |
02-Apr-2005 12:49:44 | Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 12:00 FOR TO MATCH CON ED. |
02-Apr-2005 12:53:00 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 12:00. |
02-Apr-2005 13:02:41 | Metering Authority - Consolidated Edison of NY REQUESTS NYPA_____HELLGATE_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 13:00 FOR WATERSIDE OUTAGE. |
02-Apr-2005 13:30:31 | Metering Authority - Consolidated Edison of NY REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 13:00. |
02-Apr-2005 13:38:19 | Metering Authority - Consolidated Edison of NY REMOVES NYPA_____HELLGATE_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 14:00. |
02-Apr-2005 15:05:40 | Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT1_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 15:00 FOR TO MATCH CON ED. |
02-Apr-2005 15:18:28 | PJM initiated curtailment cut 50 MWs. |
02-Apr-2005 16:00:43 | Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 16:00 FOR SUPPLYING STEAM. |
02-Apr-2005 17:27:29 | Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 17:00 FOR TO MATCH CON ED. |
02-Apr-2005 19:04:17 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 19:00. |
02-Apr-2005 19:27:44 | Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT1_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 19:00 FOR TO MATCH CON ED. |
02-Apr-2005 19:42:57 | Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT1_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/02/2005 19:00. |
Insert Time | Message |
02-Apr-2005 01:29:14 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:14 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:15 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:15 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:15 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:15 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:15 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:15 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:15 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:15 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:15 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:15 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:15 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:15 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:15 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:16 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:16 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:16 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:16 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:16 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 01:29:16 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 04/02/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:41 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:41 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:42 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:42 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:42 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:43 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:43 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:43 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:43 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:44 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:44 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:44 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:45 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:45 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:45 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:46 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:46 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:46 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:47 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:47 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:47 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:48 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 15:21:48 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/03/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:30 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:31 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:31 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:32 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:32 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:32 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:33 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:33 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:34 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:34 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:34 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:35 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:35 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:35 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:36 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:36 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:36 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:37 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:37 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:37 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:38 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:38 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:17:38 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 04/03/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
02-Apr-2005 16:18:45 | Generator: RAVENSWOOD___4 scheduled for local reliability in DAM market for 04/03/2005 23 Energy = 160 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |