P-2509-Apr-2005

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
09-Apr-2005 05:58:58Metering Authority - Niagara Mohawk REMOVES LOWER___HUDSON OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/09/2005 05:00.
09-Apr-2005 15:23:54ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 04/09/2005 15:00 FOR Y-50 Over Normal.
09-Apr-2005 16:14:14ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 04/09/2005 16:00 FOR Y-50 Over Normal.
09-Apr-2005 21:25:26ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 04/09/2005 21:00.

Committed for Reliability

Back to top
Insert TimeMessage
09-Apr-2005 12:50:49Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:50Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:50Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:50Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:51Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:51Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:51Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:52Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:52Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:52Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:53Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:53Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:53Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:53Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:54Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:54Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:54Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:55Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:55Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:55Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:56Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:56Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:56Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:50:56Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/10/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:51:58Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:51:59Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:51:59Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:51:59Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:51:59Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:00Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:00Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:00Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:01Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:01Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:01Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:02Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:02Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:03Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:04Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:04Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:04Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:05Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:05Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:05Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:05Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:06Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:06Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 12:52:06Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/10/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:09Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:09Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:09Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:09Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:09Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:09Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:09Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:09Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:10Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:10Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:10Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:10Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:10Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:10Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:10Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:10Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
09-Apr-2005 21:13:10Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/10/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
09-Apr-2005 14:52:50NYISO is reserving hours beginning 11:00, 13:00, 14:00, 17:00, 22:00, and 23:00 in the April 8, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. NYISO is reserving hours beginning 13:00 and 14:00 in the April 8, 2005 Hour-Ahead Market, encompassing Energy, Regulation and Operating Reserve prices. Prices in the April 9, 2005 Day-Ahead Market are correct.