Insert Time | Message |
24-Apr-2005 11:08:46 | Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 04/25/2005 00 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:08:46 | Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 04/25/2005 01 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:08:46 | Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 04/25/2005 02 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:08:47 | Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 04/25/2005 03 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:08:47 | Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 04/25/2005 04 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:08:47 | Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 04/25/2005 05 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:08:48 | Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 04/25/2005 06 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:08:48 | Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 04/25/2005 09 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:08:48 | Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 04/25/2005 08 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:08:48 | Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 04/25/2005 07 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:08:49 | Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 04/25/2005 10 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:08:49 | Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 04/25/2005 11 Energy = 90 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:34 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 00 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:35 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 01 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:35 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 03 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:35 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 02 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:36 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 04 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:36 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:36 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:36 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:37 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:37 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:37 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:38 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:38 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:38 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:39 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:39 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:39 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:39 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:40 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:40 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:40 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:41 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:41 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:26:41 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/25/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 11:27:55 | Generator: PORT_JEFF_4 scheduled for local reliability in DAM market for 04/25/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:28 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:29 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:30 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:30 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:30 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:30 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:31 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:31 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:31 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:32 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:32 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:32 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:33 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:33 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:33 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:33 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:34 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
24-Apr-2005 12:27:34 | Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/25/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW. |
Insert Time | Message |
24-Apr-2005 13:30:58 | The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 04/18/2005 in hours (03,04,05,06,07,08,09,10,11,12,13,14,15,16,17,18,19,20,21,22,23) |
24-Apr-2005 14:15:06 | The Real Time Energy prices have been updated in the MIS for 04/18/2005 in hours (03,04,05,06,07,08,09,10,11,12,13,14,15,16,17,18,19,20,21,22,23) |
24-Apr-2005 14:15:07 | The Real Time ANCILLARY prices have been updated in the MIS for 04/18/2005 in hours (03) |
24-Apr-2005 15:14:15 | The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 04/19/2005 in hours (00) |
24-Apr-2005 15:16:58 | The Hour Ahead Market (HAM)Update of the Hour Ahead Market (HAM) LBMP prices in the MIS for 04/18/2005 resulted in no hours changing. |
24-Apr-2005 16:53:54 | NYISO is reserving hours beginning 03:00, 22:00 and 23:00 in the April 23, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. Prices in the April 23, 2005 Hour-Ahead Market, encompassing Energy, Regulation and Operating Reserve prices are correct. Prices in the April 24, 2005 Day-Ahead Market are correct. |