P-2505-Apr-2005

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
05-Apr-2005 03:14:08Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/05/2005 03:00.
05-Apr-2005 05:08:59Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/05/2005 05:00 FOR SRE'd by LI HB00-23 on 4/4/05 for 4/5/05.
05-Apr-2005 05:09:39Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/05/2005 05:00 FOR SRE'd by on 4/4/05 for HB00-23 on 4/5/05.
05-Apr-2005 05:14:40Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/05/2005 05:00 FOR SRE'd by LI on 4/4/05 for HB00-23 on 4/5/05.
05-Apr-2005 06:06:5304/05/2005 06:04:39 NYISO large event reserve pick-up executed.
05-Apr-2005 07:03:04Metering Authority - Long Island Power Authority REMOVES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/05/2005 10:00.
05-Apr-2005 07:11:22ISO UPDATES EAST_RIVER___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 04/05/2005 07:00 FOR Test unit not following basepoints.
05-Apr-2005 07:12:57Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/05/2005 07:00 FOR TO PRODUCE STEAM.
05-Apr-2005 09:59:22ISO REQUESTS SITHE___OGDNSBRG OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 04/05/2005 09:00 FOR problem with mis evaluating bids.
05-Apr-2005 10:10:07ISO REMOVES SITHE___OGDNSBRG OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 04/05/2005 10:00.
05-Apr-2005 11:28:1504/05/2005 11:27:19 NYISO large event reserve pick-up executed.
05-Apr-2005 11:31:23ISO UPDATES EAST_RIVER___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 04/05/2005 11:00 FOR Test unit not following basepoints.
05-Apr-2005 11:32:12Metering Authority - Consolidated Edison of NY UPDATES BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/01/2005 15:00 FOR placed OOM by TSA per Operational Announcements (DB).
05-Apr-2005 11:48:29ISO REMOVES EAST_RIVER___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 04/05/2005 11:00.
05-Apr-2005 13:15:51ISO REQUESTS EAST_RIVER___2 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 04/05/2005 15:00 FOR unit not commercial, testing.
05-Apr-2005 13:22:5004/05/2005 13:21:35 NYISO large event reserve pick-up executed.
05-Apr-2005 13:53:46ISO UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 04/05/2005 14:00 FOR unit not commercial, testing.
05-Apr-2005 15:05:03ISO UPDATES EAST_RIVER___2 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 04/05/2005 15:00 FOR unit not commercial, testing.
05-Apr-2005 18:12:44ISO REMOVES EAST_RIVER___2 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 04/05/2005 18:00.
05-Apr-2005 18:45:37Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/05/2005 18:00 FOR 261 OOS.
05-Apr-2005 20:09:15Metering Authority - Long Island Power Authority UPDATES FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/05/2005 20:00 FOR 261 OOS.
05-Apr-2005 21:01:42Metering Authority - Consolidated Edison of NY REQUESTS BROOKLYN_NAVY_YARD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/06/2005 00:00 FOR TO PRODUCE STEAM.
05-Apr-2005 21:02:25Metering Authority - Consolidated Edison of NY REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/06/2005 00:00 FOR SUPPLYING STEAM.
05-Apr-2005 21:02:46Metering Authority - Long Island Power Authority REQUESTS FAR ROCKAWAY___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 04/06/2005 00:00 FOR 261 OOS.
05-Apr-2005 22:18:16ISO REQUESTS NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 04/05/2005 22:00 FOR iso overgen.
05-Apr-2005 22:24:12ISO UPDATES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 04/05/2005 22:00 FOR iso overgen.
05-Apr-2005 22:41:08ISO REMOVES NIAGARA____ OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 04/05/2005 22:00.
05-Apr-2005 23:17:5404/05/2005 23:16:17 NYISO large event reserve pick-up executed.

Committed for Reliability

Back to top
Insert TimeMessage
05-Apr-2005 07:02:12Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 07:02:13Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 07:02:13Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 07:02:13Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 07:02:14Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 07:02:14Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 07:02:14Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 07:02:15Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 07:02:15Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 07:02:16Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 07:02:16Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 07:02:17Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 07:02:17Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 07:02:17Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/05/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 11:42:01Generator: POLETTI____ scheduled for local reliability in DAM market for 04/06/2005 22 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 11:42:01Generator: POLETTI____ scheduled for local reliability in DAM market for 04/06/2005 23 Energy = 140 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 11:50:30Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/06/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 11:50:30Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 04/06/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:17:41Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 04/06/2005 12 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:17:42Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 04/06/2005 13 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:17:42Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 04/06/2005 14 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:17:43Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 04/06/2005 15 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:17:43Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 04/06/2005 17 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:17:43Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 04/06/2005 16 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:17:44Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 04/06/2005 21 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:17:44Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 04/06/2005 20 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:17:44Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 04/06/2005 19 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:17:44Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 04/06/2005 18 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:17:45Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 04/06/2005 22 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:17:45Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 04/06/2005 23 Energy = 100 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:26:13Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/06/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:26:13Generator: BARRETT___2 scheduled for local reliability in DAM market for 04/06/2005 23 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:33Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 00 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:33Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 02 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:33Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 01 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:34Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 03 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:34Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 05 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:34Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 06 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:34Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 04 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:35Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 07 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:35Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 09 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:35Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 08 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:36Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 10 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:36Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 11 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:36Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 13 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:36Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 12 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:37Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 14 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:37Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 15 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:37Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 16 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:38Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 17 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:38Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 20 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:38Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 18 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:38Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 19 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:39Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 21 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:39Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 22 Energy = 40 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:28:39Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 04/06/2005 23 Energy = 20 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:29:58Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 00 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:29:58Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 02 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:29:58Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 01 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:29:59Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 03 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:29:59Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 05 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:29:59Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 04 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:00Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 06 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:00Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 07 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:01Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 08 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:01Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 10 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:01Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 09 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:02Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 11 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:02Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 13 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:02Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 14 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:02Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 12 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:03Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 15 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:03Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 17 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:03Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 16 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:04Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 18 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:04Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 19 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:04Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 20 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:05Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 21 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:05Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 22 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.
05-Apr-2005 12:30:05Generator: ASTORIA___3 scheduled for local reliability in DAM market for 04/06/2005 23 Energy = 75 MW. Regulation = 0 MW. Min10 Spinning = 0 MW. Min10 Nonsynch = 0 MW. Min30 Spinning = 0 MW. Min30 Nonsynch = 0 MW. Operating Cap = 0 MW.

Market Monitor Notices

Back to top
Insert TimeMessage
05-Apr-2005 11:56:31The Real Time Energy prices have been updated in the MIS for 03/30/2005 in hours (01,04)
05-Apr-2005 15:27:35NYISO is reserving hours beginning 0:00 through 23:00 in the April 4, 2005 Real-Time Market, encompassing Energy, Regulation and Operating Reserve prices. NYISO is reserving hours beginning 0:00 through 23:00 in the April 4, 2005 Hour-Ahead Market, encompassing Energy, Regulation and Operating Reserve prices. Prices in the April 5, 2005 Day-Ahead Market are correct. (Message 1 of 3)
05-Apr-2005 15:28:37The NYISO and LECG have determined that due to transmission outages affecting the Indian Point 3 generator bus, that this specific modeling scenario has resulted in the incorrect calculation of LBMPs on this one specific generator bus, thus necessitating the reservations in Real Time and Hour ahead Markets. This issue does not affect any other bus or calculation. (Message 2 of 3)
05-Apr-2005 15:29:23Additionally,the following subset of the above reservations are also reserved for other reasons: The following hours are reserved in Real Time for additional reasons: HB 2:00, 3:00, 8:00, 9:00, 10:00, 14:00 and 20:00 EST. The following hours are also reserved in Hour Ahead Market for additional reasons: HB 1:00, 3:00, 6:00, 7:00, 10:00 and 14:00. (Message 3 of 3)
05-Apr-2005 20:57:33The Hour Ahead Market (HAM) Energy prices have been updated in the MIS for 03/31/2005 in hours (04,05,14,15,16,17,18,19)
05-Apr-2005 21:20:03The Real Time Energy prices have been updated in the MIS for 03/31/2005 in hours (04,14,15,16,17,18,19,22,23)