P-2515-Jan-2005

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage

Committed for Reliability

Back to top
Insert TimeMessage
15-Jan-2005 11:17:09Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:11Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:12Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:13Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:14Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:15Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:16Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 06 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:17Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 07 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:18Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 08 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:19Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 09 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:21Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 10 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:22Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 11 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:23Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 12 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:24Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 13 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:25Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 14 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:26Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 15 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:27Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 16 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:28Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 17 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:29Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 18 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:30Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 19 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:31Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 20 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:33Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 21 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:34Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 22 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:17:35Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/16/2005 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:01Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 00 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:02Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 01 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:03Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 02 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:04Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 03 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:06Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 04 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:07Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 05 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:08Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 06 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:09Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 07 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:10Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 08 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:11Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 09 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:12Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 10 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:13Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 11 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:14Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 12 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:15Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 13 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:16Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 14 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:18Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 15 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:19Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 16 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:20Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 17 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 18 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:22Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 19 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:23Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 20 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:24Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 21 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:25Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 22 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:28:26Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/16/2005 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:29:00Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/16/2005 00 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:29:01Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/16/2005 01 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:29:02Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/16/2005 02 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:29:03Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/16/2005 03 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:29:04Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/16/2005 04 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:29:06Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/16/2005 05 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:29:07Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/16/2005 06 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:29:08Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/16/2005 07 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:29:09Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/16/2005 08 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 11:29:10Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/16/2005 09 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:38Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:39Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:41Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:42Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:43Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:44Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:45Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:46Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:47Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:48Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:49Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:50Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:51Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:52Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:53Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:55Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:56Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:57Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:00:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:01:00Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:01:01Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:01:02Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jan-2005 12:01:03Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/16/2005 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
15-Jan-2005 15:17:55NYISO is reserving hours beginning 5:00, 21:00, 22:00 & 23:00 in the January 14, 2005 Real-Time Market. NYISO is reserving hours beginning 21:00, 22:00 & 23:00 in the January 14, 2005 Hour Ahead Market to verify energy prices. NYISO is reserving hours beginning 21:00, 22:00 & 23:00 in the January 14, 2005 Hour Ahead Market to verify locational reserve prices. Prices in the January 15, 2005 Day-Ahead Market are correct.