19-Jan-2005 00:02:14HUNTLEY___66 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 01/18/2005 23:59.
19-Jan-2005 07:48:35Metering Authority - Niagara Mohawk REQUESTS HUNTLEY___66 OUT OF MERIT. TO VOLTAGE SUPPORT AT START TIME 01/19/2005 07:00 FOR as requested by NM.
19-Jan-2005 08:09:1101/19/2005 08:01:22 NYISO SCD reserve pick-up executed.
19-Jan-2005 08:15:27ISO REQUESTS GILBOA___1 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 01/19/2005 08:00 FOR min run time.
19-Jan-2005 08:31:44ISO REMOVES GILBOA___1 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 01/19/2005 09:00.
19-Jan-2005 09:02:15GILBOA___1 NO LONGER OOM FOR ISO SECURITY AFTER 01/19/2005 08:59.
19-Jan-2005 09:09:51NYISO Locational based curtailment cut 300 MWs.
19-Jan-2005 09:13:4201/19/2005 09:12:48 NYISO SCD reserve pick-up remains active.
19-Jan-2005 09:13:4701/19/2005 09:02:46 NYISO SCD reserve pick-up executed.
19-Jan-2005 09:35:28Metering Authority - Niagara Mohawk UPDATES HUNTLEY___66 OUT OF MERIT. TO VOLTAGE SUPPORT AT START TIME 01/19/2005 09:00 FOR as requested by NM.
19-Jan-2005 09:37:16Metering Authority - Niagara Mohawk UPDATES HUNTLEY___66 OUT OF MERIT. TO VOLTAGE SUPPORT AT START TIME 01/19/2005 09:00 FOR as requested by NM.
19-Jan-2005 09:39:58Metering Authority - Central Hudson Gas and Electr REQUESTS COXSACKIE___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/19/2005 09:00 FOR for CH due to 7&8 line outage.
19-Jan-2005 11:09:00ISO REQUESTS GILBOA___3 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 01/19/2005 11:00 FOR .
19-Jan-2005 11:21:47ISO REMOVES GILBOA___3 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 01/19/2005 12:00.
19-Jan-2005 15:16:57Metering Authority - Central Hudson Gas and Electr UPDATES COXSACKIE___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/19/2005 15:00 FOR for CH due to 7&8 line outage.
19-Jan-2005 15:26:20Metering Authority - Central Hudson Gas and Electr UPDATES COXSACKIE___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/19/2005 15:00 FOR for CH due to 7&8 line outage.
19-Jan-2005 19:14:25ISO REQUESTS GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/19/2005 19:00 FOR RPU Failed Roseton 2 trip.
19-Jan-2005 19:21:53ISO REQUESTS GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/19/2005 19:00 FOR RPU Overgen.
19-Jan-2005 19:22:19ISO REQUESTS GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/19/2005 19:00 FOR RPU Overgen.
19-Jan-2005 19:24:01ISO UPDATES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/19/2005 19:00 FOR RPU Failed Roseton 2 trip.
19-Jan-2005 19:33:12ISO REMOVES GILBOA___4 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/19/2005 19:00.
19-Jan-2005 19:46:43ISO REMOVES GILBOA___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/19/2005 19:00.
19-Jan-2005 19:46:59ISO REMOVES GILBOA___3 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 01/19/2005 19:00.
19-Jan-2005 21:25:3001/19/2005 21:23:41 NYISO SCD reserve pick-up executed.
19-Jan-2005 22:27:58Metering Authority - Central Hudson Gas and Electr REQUESTS COXSACKIE___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 01/20/2005 00:00 FOR for CH due to 7&8 line outage.
19-Jan-2005 22:28:55Metering Authority - Niagara Mohawk REMOVES HUNTLEY___66 OUT OF MERIT. TO VOLTAGE SUPPORT AT START TIME 01/19/2005 22:00.
19-Jan-2005 22:33:36Metering Authority - Niagara Mohawk REQUESTS HUNTLEY___66 OUT OF MERIT. TO VOLTAGE SUPPORT AT START TIME 01/20/2005 00:00 FOR as requested by NM..

Committed for Reliability

Back to top
Insert TimeMessage
19-Jan-2005 11:07:20Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:22Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:23Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:24Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:25Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:26Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:28Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 06 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:29Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 07 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:30Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 08 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:31Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 09 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:32Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 10 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:33Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 11 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:34Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 12 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:35Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 13 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:36Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 14 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:37Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 15 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:38Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 16 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:40Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 17 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:41Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 18 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:42Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 19 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:43Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 20 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:44Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 21 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:45Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 22 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 11:07:46Generator: HUNTLEY___66 scheduled for local reliability in DAM market for 01/20/2005 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:19:18Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/20/2005 19 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:19:20Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/20/2005 20 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:19:21Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/20/2005 21 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:19:22Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/20/2005 22 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:19:23Generator: ASTORIA___5 scheduled for local reliability in DAM market for 01/20/2005 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:19:55Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/20/2005 00 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:19:56Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/20/2005 01 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:19:57Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/20/2005 02 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:19:59Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/20/2005 03 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:20:00Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/20/2005 04 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:20:01Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 01/20/2005 05 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:20:28Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 01/20/2005 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:28Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 00 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:30Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 01 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:31Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 02 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:32Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 03 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:33Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 04 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:34Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 05 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:35Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 06 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:36Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 07 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:37Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 08 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:39Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 09 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:40Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 10 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:41Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 11 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:42Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 12 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:43Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 13 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:44Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 14 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:45Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 15 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:46Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 16 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:47Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 17 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:48Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 18 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:49Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 19 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:51Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 20 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:52Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 21 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:53Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 22 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 12:47:54Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 01/20/2005 23 Energy = 67 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:14Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:15Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:16Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:17Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:19Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:20Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:21Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:22Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:23Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:24Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:25Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:26Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:27Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:28Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:29Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:30Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:32Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:33Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:34Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:35Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:36Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:37Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:38Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
19-Jan-2005 13:06:39Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 01/20/2005 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
19-Jan-2005 15:29:48Prices in the January 18, 2005 Real-Time Market are correct. NYISO is reserving hour beginning 9:00 in the January 18, 2005 Hour Ahead Market to verify Locational Reserve prices. Prices in the January 19, 2005 Day-Ahead Market are correct.
19-Jan-2005 15:34:11The Automated Mitigation Procedure (AMP) armed and mitigated in the DAM for 1/20/2005 for hour beginning 17 in the Long Island zone.
19-Jan-2005 17:58:56The Real Time prices have been updated in the MIS for 01/13/2005 in hours (17)
19-Jan-2005 18:51:13The Real Time prices have been updated in the MIS for 01/14/2005 in hours (05)