P-2510-Oct-2004

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
10-Oct-2004 01:20:54Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/10/2004 01:00.
10-Oct-2004 01:21:13Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/10/2004 01:00.
10-Oct-2004 02:01:44Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/10/2004 02:00.
10-Oct-2004 02:02:04Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/10/2004 02:00.
10-Oct-2004 02:02:23Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/10/2004 02:00.
10-Oct-2004 02:02:48Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/10/2004 02:00.
10-Oct-2004 02:03:50Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/10/2004 02:00.
10-Oct-2004 02:04:44Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 10/10/2004 02:00.
10-Oct-2004 11:35:41NYISO Locational based curtailment cut 615 MWs.
10-Oct-2004 11:52:5910/10/2004 11:45:30 NYISO SCD reserve pick-up executed.
10-Oct-2004 12:18:2710/10/2004 12:10:42 NYISO SCD reserve pick-up executed.
10-Oct-2004 13:02:14GILBOA___4 NO LONGER COMMITED FOR ISO RELIABILITY AFTER 10/10/2004 12:59.
10-Oct-2004 20:47:10NYISO Locational based curtailment cut 585 MWs. Due to TLR

Committed for Reliability

Back to top
Insert TimeMessage
10-Oct-2004 11:23:24Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 10/11/2004 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:23Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:24Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:25Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:26Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:27Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:28Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:29Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:30Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:31Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:32Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:33Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:35Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:36Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:37Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:38Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:39Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:40Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:41Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:24:42Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/11/2004 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:27:54Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 00 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:27:56Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 01 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:27:57Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 02 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:27:58Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 03 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:27:59Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 04 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:00Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 05 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:01Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 06 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:02Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 07 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:03Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 08 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:05Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 09 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:06Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 10 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:07Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 11 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:08Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 12 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:09Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 13 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:10Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 14 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:11Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 15 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:12Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 16 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:13Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 17 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:14Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 18 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:16Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 19 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:17Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 20 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:18Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 21 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:19Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 22 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:28:20Generator: ASTORIA___4 scheduled for local reliability in DAM market for 10/11/2004 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:19Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 00 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:20Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 01 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:21Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 02 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:22Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 03 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:23Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 04 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:25Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 05 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:26Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 06 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:27Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 07 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:28Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 08 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:29Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 09 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:30Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 10 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:31Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 11 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:32Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 12 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:33Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 13 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:34Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 14 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:35Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 15 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:37Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 16 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:38Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 17 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:39Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 18 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:40Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 19 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:41Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 20 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:42Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 21 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:43Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 22 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:29:44Generator: EAST RIVER___7 scheduled for local reliability in DAM market for 10/11/2004 23 Energy = 60 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:30:13Generator: ASTORIA___5 scheduled for local reliability in DAM market for 10/11/2004 21 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:30:14Generator: ASTORIA___5 scheduled for local reliability in DAM market for 10/11/2004 22 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:30:15Generator: ASTORIA___5 scheduled for local reliability in DAM market for 10/11/2004 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 11:30:41Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 10/11/2004 23 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:36Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 07 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:38Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 08 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:39Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 09 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:40Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 10 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:41Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 11 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:42Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 12 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:43Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 13 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:44Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 14 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:45Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 15 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:46Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 16 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:48Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 17 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:49Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 18 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:50Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 19 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 12:57:51Generator: INDECK___CORINTH scheduled for local reliability in DAM market for 10/11/2004 20 Energy = 129 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:16Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:17Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:18Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:19Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:20Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:21Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:23Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:24Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:25Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:26Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:27Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:28Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:29Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:30Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:31Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:32Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:33Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Oct-2004 13:11:34Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/11/2004 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
10-Oct-2004 14:36:48NYISO is reserving hours beginning 12:00 and 16:00 in the October 09, 2004 Real-Time Market. Prices in the October 09, 2004 Hour-Ahead Market are correct. Prices in the October 10, 2004 Day-Ahead Market are correct.