Insert Time | Message |
09-Jun-2004 05:14:27 | ISO REQUESTS GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2004 05:00 FOR OFFSET HB07 SCHEDULE. |
09-Jun-2004 05:24:23 | ISO REMOVES GILBOA___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2004 05:00. |
09-Jun-2004 09:51:59 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 09:00 FOR Nox Limitation. |
09-Jun-2004 09:52:43 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 09:00 FOR NOx Limitation. |
09-Jun-2004 09:53:38 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 09:00 FOR Nox Limitation. |
09-Jun-2004 09:54:08 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 09:00 FOR NOx Limitation. |
09-Jun-2004 09:54:37 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 09:00 FOR Nox Limitation. |
09-Jun-2004 10:17:23 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 10:00 FOR Post Cont. for Voltage on Ast West bus. |
09-Jun-2004 10:17:23 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 10:00 FOR Post Cont. for Voltage on Ast West bus. |
09-Jun-2004 10:17:23 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 10:00 FOR Post Cont. for Voltage on Ast West bus. |
09-Jun-2004 10:17:23 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 10:00 FOR Post Cont. for Voltage on Ast West bus. |
09-Jun-2004 10:21:34 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 10:00 FOR Post Cont. for Voltage on Ast West bus. |
09-Jun-2004 10:21:34 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 10:00 FOR Post Cont. for Voltage on Ast West bus. |
09-Jun-2004 10:21:34 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 10:00 FOR Post Cont. for Voltage on Ast West bus. |
09-Jun-2004 10:21:34 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 10:00 FOR Post Cont. for Voltage on Ast West bus. |
09-Jun-2004 10:23:53 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 10:00 FOR Post Cont. for Voltage on Ast. West bus. |
09-Jun-2004 10:38:57 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 10:00 FOR Nox Savings. |
09-Jun-2004 10:39:38 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_11 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 10:00 FOR Nox Savings. |
09-Jun-2004 10:40:26 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_12 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 10:00 FOR Nox Savings. |
09-Jun-2004 10:41:32 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT_13 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 10:00 FOR Nox Savings. |
09-Jun-2004 11:09:38 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 11:00 FOR Post Cont. for Voltage on Ast West Bus. |
09-Jun-2004 11:09:38 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 11:00 FOR Post Cont. for Voltage on Ast West Bus. |
09-Jun-2004 11:34:35 | Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 11:00 FOR EAST LI SECURITY. |
09-Jun-2004 12:30:21 | Metering Authority - Consolidated Edison of NY REQUESTS ASTORIA___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 12:00 FOR Post Cont. for Voltage on Ast. West Bus. |
09-Jun-2004 12:32:28 | 06/09/2004 12:31:42 NYISO SCD reserve pick-up remains active. |
09-Jun-2004 12:32:33 | 06/09/2004 12:21:42 NYISO SCD reserve pick-up executed. |
09-Jun-2004 12:37:14 | ISO REQUESTS GILBOA___2 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/09/2004 12:00 FOR Reserves. |
09-Jun-2004 13:02:15 | HOLTSVILLE_IC_6 NO LONGER OOM FOR ISO SECURITY AFTER 06/09/2004 12:59. |
09-Jun-2004 13:36:10 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 13:00 FOR Post Cont. for Voltage on Ast. West Bus - VAR Support. |
09-Jun-2004 13:37:37 | ISO REQUESTS GILBOA___3 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/09/2004 13:00 FOR Reserves. |
09-Jun-2004 13:43:38 | 06/09/2004 13:32:54 NYISO SCD reserve pick-up executed. |
09-Jun-2004 13:45:21 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 13:00 FOR Post Cont. for Voltage on Ast. West bus. |
09-Jun-2004 13:55:24 | ISO REMOVES GILBOA___2 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/09/2004 13:00. |
09-Jun-2004 13:55:45 | ISO REMOVES GILBOA___3 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/09/2004 13:00. |
09-Jun-2004 14:17:40 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 14:00 FOR Post Cont volt on ast west bus. |
09-Jun-2004 14:19:42 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_11 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 14:00 FOR post cont volt on ast west bus. |
09-Jun-2004 14:20:17 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_12 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 14:00 FOR post cont volt on ast west bus. |
09-Jun-2004 14:21:05 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_13 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 14:00 FOR post cont volt on ast west bus. |
09-Jun-2004 14:43:48 | Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 14:00. |
09-Jun-2004 14:53:26 | Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 15:00 FOR Test. |
09-Jun-2004 15:56:56 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 15:00 FOR Post Cont volt on ast west bus. |
09-Jun-2004 15:57:21 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_11 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 15:00 FOR post cont volt on ast west bus. |
09-Jun-2004 15:57:57 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_12 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 15:00 FOR post cont volt on ast west bus. |
09-Jun-2004 15:58:48 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_13 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 15:00 FOR post cont volt on ast west bus. |
09-Jun-2004 16:01:46 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_13 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 16:00. |
09-Jun-2004 16:14:48 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 16:00 FOR Post Cont volt on ast west bus. |
09-Jun-2004 16:15:05 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_11 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 16:00 FOR post cont volt on ast west bus. |
09-Jun-2004 16:15:22 | Metering Authority - Consolidated Edison of NY UPDATES ASTORIA_GT_12 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 16:00 FOR post cont volt on ast west bus. |
09-Jun-2004 17:02:13 | HOLTSVILLE_IC_2 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 06/09/2004 16:59. |
09-Jun-2004 17:02:13 | ATHENS_STG_2 NO LONGER COMMITED FOR ISO RELIABILITY AFTER 06/09/2004 16:59. |
09-Jun-2004 17:13:13 | Metering Authority - Consolidated Edison of NY REQUESTS ARTHUR KILL_GT_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 17:00 FOR Staten Island Cont. |
09-Jun-2004 19:52:43 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 19:00. |
09-Jun-2004 19:53:11 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 19:00. |
09-Jun-2004 19:53:58 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 19:00. |
09-Jun-2004 19:55:19 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA___2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 19:00. |
09-Jun-2004 19:58:21 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA___4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 19:00. |
09-Jun-2004 19:58:58 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 19:00. |
09-Jun-2004 19:58:58 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 19:00. |
09-Jun-2004 19:58:58 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 19:00. |
09-Jun-2004 19:58:59 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 19:00. |
09-Jun-2004 20:00:52 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 20:00. |
09-Jun-2004 20:00:52 | Metering Authority - Consolidated Edison of NY REMOVES ASTORIA_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 20:00. |
09-Jun-2004 20:27:12 | ISO UPDATES POLETTI____ OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/09/2004 20:00 FOR 305 CONTINGENCY. |
09-Jun-2004 20:41:23 | ISO UPDATES ROSETON___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2004 20:00 FOR THUNDERSTORM CASES. |
09-Jun-2004 20:42:43 | ISO UPDATES ROSETON___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2004 20:00 FOR THUNDERSTORM CASES. |
09-Jun-2004 20:47:26 | ISO UPDATES POLETTI____ OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/09/2004 20:00 FOR 305 CONTINGENCY. |
09-Jun-2004 20:55:00 | Metering Authority - Consolidated Edison of NY REQUESTS NYPA_POUCH1_____GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 06/09/2004 21:00 FOR STATEN ISLAND CONTINGENCY. |
09-Jun-2004 21:02:16 | GILBOA___4 NO LONGER OOM FOR ISO SECURITY AFTER 06/09/2004 20:59. |
09-Jun-2004 21:11:10 | ISO REQUESTS GILBOA___1 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/09/2004 21:00 FOR THUNDER STORM ALERT. |
09-Jun-2004 21:57:09 | ISO REMOVES GILBOA___1 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/09/2004 21:00. |
09-Jun-2004 22:38:33 | ISO REMOVES ROSETON___1 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2004 22:00. |
09-Jun-2004 22:38:41 | PJM initiated curtailment cut 250 MWs. Ramp limitation at the top of the hour |
09-Jun-2004 22:38:54 | ISO REMOVES ROSETON___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 06/09/2004 22:00. |
09-Jun-2004 22:55:58 | ISO REMOVES POLETTI____ OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/09/2004 22:00. |
09-Jun-2004 22:59:16 | ISO REQUESTS NIAGARA____ OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 06/09/2004 22:00 FOR OVERGEN.. |
Insert Time | Message |
09-Jun-2004 10:56:36 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 00 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:37 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 01 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:39 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 02 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:40 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 03 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:41 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 04 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:42 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 05 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:43 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 06 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:44 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 07 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:45 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 08 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:46 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 09 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:47 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 10 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:48 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 11 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:49 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 12 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:51 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 13 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:52 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 14 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:53 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 15 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:54 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 16 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:55 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 17 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:56 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 18 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:57 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 19 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:58 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 20 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:56:59 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 21 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:57:00 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 22 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 10:57:01 | Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 06/10/2004 23 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 11:17:18 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/10/2004 18 Energy = 65 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 11:17:20 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/10/2004 19 Energy = 65 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 11:17:21 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/10/2004 20 Energy = 65 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 11:17:22 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/10/2004 21 Energy = 65 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 11:17:23 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/10/2004 22 Energy = 65 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 11:17:24 | Generator: ASTORIA___2 scheduled for local reliability in DAM market for 06/10/2004 23 Energy = 65 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 11:18:11 | Generator: POLETTI____ scheduled for local reliability in DAM market for 06/10/2004 22 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 11:18:12 | Generator: POLETTI____ scheduled for local reliability in DAM market for 06/10/2004 23 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 12:03:33 | Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 06/10/2004 23 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 12:03:56 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 06/10/2004 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:00 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 00 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:02 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 01 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:03 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 02 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:04 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 03 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:05 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 04 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:06 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 05 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:08 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 06 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:09 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 07 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:10 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 08 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:11 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 09 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:12 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 10 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:13 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 11 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:14 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 12 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:16 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 13 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:17 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 14 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:18 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 15 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:19 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 16 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:20 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 17 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:21 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 18 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:22 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 19 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:23 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 20 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:24 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 21 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:25 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 22 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
09-Jun-2004 22:29:27 | Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/10/2004 23 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |