P-2530-Sep-2003

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
30-Sep-2003 01:09:55NPX initiated curtailment cut 175 MWs.
30-Sep-2003 08:09:24Metering Authority - Long Island Power Authority REQUESTS BARRETT_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 08:00 FOR NORTHPORT 3 TRIPPED.
30-Sep-2003 08:09:24Metering Authority - Long Island Power Authority REQUESTS BARRETT_IC_11 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 08:00 FOR NORTHPORT 3 TRIPPED.
30-Sep-2003 08:09:24Metering Authority - Long Island Power Authority REQUESTS BARRETT_IC_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 08:00 FOR NORTHPORT 3 TRIPPED.
30-Sep-2003 08:09:24Metering Authority - Long Island Power Authority REQUESTS BARRETT_IC_12 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 08:00 FOR NORTHPORT 3 TRIPPED.
30-Sep-2003 09:05:14Metering Authority - Long Island Power Authority REMOVES BARRETT_IC_9 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 09:00.
30-Sep-2003 09:05:14Metering Authority - Long Island Power Authority REMOVES BARRETT_IC_12 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 09:00.
30-Sep-2003 09:05:14Metering Authority - Long Island Power Authority REMOVES BARRETT_IC_11 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 09:00.
30-Sep-2003 09:05:14Metering Authority - Long Island Power Authority REMOVES BARRETT_IC_10 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 09:00.
30-Sep-2003 17:31:31Metering Authority - Long Island Power Authority REQUESTS PPL PILGRIM_ST_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 17:00 FOR 69KV LINE CONTINGENCY.
30-Sep-2003 17:32:28Metering Authority - Long Island Power Authority REQUESTS PPL PILGRIM_ST_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 17:00 FOR 69KV LINE CONTINGENCY.
30-Sep-2003 17:35:15Metering Authority - Long Island Power Authority UPDATES PPL PILGRIM_ST_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 17:00 FOR 69KV LINE CONTINGENCY.
30-Sep-2003 17:35:38Metering Authority - Long Island Power Authority UPDATES PPL PILGRIM_ST_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 17:00 FOR 69KV LINE CONTINGENCY.
30-Sep-2003 17:39:45Metering Authority - Long Island Power Authority UPDATES PPL PILGRIM_ST_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 17:00 FOR 69KV LINE CONTINGENCY.
30-Sep-2003 17:48:41Metering Authority - Long Island Power Authority UPDATES PPL PILGRIM_ST_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 17:00 FOR 69KV LINE CONTINGENCY.
30-Sep-2003 17:49:07Metering Authority - Long Island Power Authority UPDATES PPL PILGRIM_ST_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 17:00 FOR 69KV LINE CONTINGENCY.
30-Sep-2003 17:50:21Metering Authority - Long Island Power Authority UPDATES PPL PILGRIM_ST_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 17:00 FOR 69KV LINE CONTINGENCY.
30-Sep-2003 17:50:50Metering Authority - Long Island Power Authority UPDATES PPL PILGRIM_ST_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 17:00 FOR 69KV LINE CONTINGENCY.
30-Sep-2003 17:51:42Metering Authority - Long Island Power Authority UPDATES PPL PILGRIM_ST_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 17:00 FOR 69KV LINE CONTINGENCY.
30-Sep-2003 17:52:16Metering Authority - Long Island Power Authority UPDATES PPL PILGRIM_ST_GT2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/30/2003 17:00 FOR 69KV LINE CONTINGENCY.
30-Sep-2003 18:29:21ISO REQUESTS BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/30/2003 18:00 FOR 262 LINE CONT..
30-Sep-2003 19:04:37ISO UPDATES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/30/2003 19:00 FOR 262 LINE CONT..
30-Sep-2003 22:11:02ISO REMOVES BARRETT___2 OUT OF MERIT. COMMITED FOR ISO RELIABILITY AT START TIME 09/30/2003 22:00.

Committed for Reliability

Back to top
Insert TimeMessage
30-Sep-2003 11:19:03Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:05Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:06Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:07Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:08Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:09Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:10Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:11Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:12Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:13Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:14Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:16Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:17Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:18Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:19Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:20Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:21Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:22Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:23Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:24Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:25Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:26Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:28Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:19:29Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 10/01/2003 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:42Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:43Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:44Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:45Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:46Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:47Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:48Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:49Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:51Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:52Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:53Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:54Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:55Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:56Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:58Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:20:59Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 11:21:00Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 10/01/2003 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 12:54:10Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/01/2003 08 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 12:54:12Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/01/2003 09 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 12:54:13Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/01/2003 10 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 12:54:14Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/01/2003 11 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 12:54:15Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/01/2003 12 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 12:54:16Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/01/2003 13 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 12:54:18Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/01/2003 14 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 12:54:19Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/01/2003 15 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 12:54:20Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/01/2003 16 Energy = 63 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 12:58:24Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/01/2003 05 Energy = 6 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 12:58:25Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/01/2003 06 Energy = 26 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
30-Sep-2003 12:58:26Generator: INDECK___OLEAN scheduled for local reliability in DAM market for 10/01/2003 07 Energy = 56 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
30-Sep-2003 10:19:53The Real Time prices have been updated in the MIS for 09/27/2003 in hours (23)
30-Sep-2003 15:08:52NYISO is reserving hours beginning 5:00 and 10:00 in the September 29, 2003 Real-Time Market. NYISO is reserving hours beginning 8:00, 9:00, 10:00 and 19:00 in the September 29, 2003 Hour-Ahead Market to verify locational reserve prices. Prices in the September 30, 2003 Day-Ahead Market are correct.
30-Sep-2003 20:54:01ISO REQUESTS ALL GENERATION OUT OF MERIT AT 20:43 09/30/03 DUE TO AGC PACKAGE ERROR, LOSS OF 6 SECOND BASEPOINTS.
30-Sep-2003 20:54:38ISO REQUESTS ALL GENERATION NO LONGER OUT OF MERIT. AT 20:52 09/30/03 DUE TO AGC PACKAGE ERROR, LOSS OF 6 SECOND BASEPOINTS.