22-Sep-2003 05:04:33Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/22/2003 05:00 FOR LI 69KV CONTINGENCY ON 675 LINE.
22-Sep-2003 05:16:26Metering Authority - Long Island Power Authority UPDATES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/22/2003 05:00 FOR LI 69KV CONTINGENCY ON 675 LINE.
22-Sep-2003 08:44:23Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/22/2003 08:00 FOR EAST END 69KV LOADING.
22-Sep-2003 09:09:14Metering Authority - Orange and Rockland Utilities REQUESTS MONGAUP___HYD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/22/2003 09:00 FOR 69KV POST CONTINGENCY.
22-Sep-2003 10:04:10Metering Authority - Orange and Rockland Utilities UPDATES MONGAUP___HYD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/22/2003 10:00 FOR 69KV POST CONTINGENCY.
22-Sep-2003 12:00:09Metering Authority - Orange and Rockland Utilities UPDATES MONGAUP___HYD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/22/2003 12:00 FOR 69KV POST CONTINGENCY.
22-Sep-2003 13:04:51Metering Authority - Long Island Power Authority REQUESTS GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/22/2003 13:00 FOR EAST END 69KV LOADING.
22-Sep-2003 13:10:16Metering Authority - Orange and Rockland Utilities UPDATES MONGAUP___HYD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/22/2003 13:00 FOR 69KV POST CONTINGENCY.
22-Sep-2003 15:44:35Metering Authority - Orange and Rockland Utilities REQUESTS MONGAUP___HYD OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/22/2003 16:00 FOR 69KV POST CONTINGENCY.
22-Sep-2003 17:09:42Metering Authority - Long Island Power Authority UPDATES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/22/2003 17:00 FOR EAST END 69KV LOADING.
22-Sep-2003 18:02:13MONGAUP___HYD NO LONGER OOM FOR TO LOCAL SECURITY AFTER 09/22/2003 17:59.
22-Sep-2003 19:41:59Metering Authority - Long Island Power Authority REMOVES EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/22/2003 19:00.
22-Sep-2003 21:43:50Metering Authority - Long Island Power Authority REMOVES GLOBAL GREEN_PORT_GT1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/22/2003 21:00.
22-Sep-2003 22:26:18Metering Authority - Long Island Power Authority REMOVES WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 09/22/2003 22:00.

Committed for Reliability

Back to top
Insert TimeMessage
22-Sep-2003 10:47:38Generator: RAVENSWOOD___1 scheduled for local reliability in DAM market for 09/23/2003 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 10:49:04Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 09/23/2003 23 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:24:25Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 09/23/2003 00 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:24:26Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 09/23/2003 01 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:24:27Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 09/23/2003 02 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:24:29Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 09/23/2003 03 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:24:30Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 09/23/2003 04 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:25:05Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 09/23/2003 23 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:25:51Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:25:52Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:25:53Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:25:54Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:25:55Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:25:56Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:25:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:25:58Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:25:59Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:00Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:02Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:03Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:04Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:05Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:06Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:07Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:08Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:09Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:10Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:11Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:12Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:14Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:15Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:26:16Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 09/23/2003 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:28:56Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 00 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:28:57Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 01 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:28:58Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 02 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:28:59Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 03 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:01Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 04 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:02Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 05 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:03Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 06 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:04Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 07 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:05Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 08 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:06Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 09 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:07Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 10 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:08Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 11 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:09Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 12 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:10Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 13 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:11Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 14 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:12Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 15 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:13Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 16 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:15Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 17 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:16Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 18 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:17Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 19 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:18Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 20 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:19Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 21 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:20Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 22 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 11:29:21Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 09/23/2003 23 Energy = 32 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:08Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 00 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:10Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 01 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:11Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 02 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:12Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 03 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:13Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 04 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:14Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 05 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:15Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 06 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:17Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 07 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:18Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 08 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:19Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 09 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:20Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 10 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:21Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 11 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:22Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 12 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:23Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 13 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:24Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 14 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:25Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 15 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:26Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 16 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:28Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 17 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:29Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 18 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:30Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 19 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:31Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 20 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:32Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 21 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:33Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 22 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Sep-2003 13:34:34Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 09/23/2003 23 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
22-Sep-2003 13:50:04The Real Time prices have been updated in the MIS for 09/18/2003 in hours (06)
22-Sep-2003 16:16:49NYISO is reserving hours beginning 20:00 and 23:00 in the September 21, 2003 Real-Time Market. NYISO is reserving hours beginning 11:00 through 15:00 in the September 21, 2003 Hour Ahead Market to verify Locational Reserve Prices. Prices in the September 22, 2003 Day-Ahead Market are correct.
22-Sep-2003 16:41:44In addition to the original hours, NYISO is reserving HB 9 in the Sept 19,2003 RT & Hour Ahead Markets to verify Energy Prices. In summary: NYISO is reserving HB 9 in the Sept 19,2003 RT Market. NYISO is reserving HB 9 in the Sept 19,2003 Hour Ahead Market to verify Energy Prices. NYISO is reserving HB 10, 11, 12 & 13 in the Sept 19,2003 Hour Ahead Market to verify Locational Reserve Prices. Prices in the Sept 20,2003 Day-Ahead Market are correct. NYISO apologizes for any inconvenience this may cause.