NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
02-Jul-2003 00:02:13NARROWS_GT1_7 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 07/01/2003 23:59.
02-Jul-2003 00:02:13NARROWS_GT1_8 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 07/01/2003 23:59.
02-Jul-2003 00:02:13NARROWS_GT2_1 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 07/01/2003 23:59.
02-Jul-2003 00:02:13NARROWS_GT2_5 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 07/01/2003 23:59.
02-Jul-2003 00:02:13NARROWS_GT2_7 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 07/01/2003 23:59.
02-Jul-2003 05:30:11Metering Authority - Long Island Power Authority REQUESTS PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 05:00 FOR stuck breaker on 871.
02-Jul-2003 05:30:46ISO REQUESTS PORT_JEFF_3 OUT OF MERIT. OOM FOR ISO SECURITY AT START TIME 07/02/2003 05:00 FOR stuck breaker on 871.
02-Jul-2003 05:31:20Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 05:00 FOR .
02-Jul-2003 05:31:57Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 05:00 FOR stuck breaker on 871.
02-Jul-2003 07:02:04Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 07:00 FOR stuck breaker on 871.
02-Jul-2003 07:02:42Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 07:00 FOR stuck breaker on 871.
02-Jul-2003 07:03:02Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 07:00 FOR stuck breaker on 871.
02-Jul-2003 08:29:49Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 08:00 FOR stuck breaker on 871.
02-Jul-2003 08:30:06Metering Authority - Long Island Power Authority UPDATES PORT_JEFF_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 08:00 FOR stuck breaker on 871.
02-Jul-2003 08:47:49Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 08:00 FOR 69kv contingency flows.
02-Jul-2003 08:48:35Metering Authority - Long Island Power Authority REQUESTS MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 08:00 FOR east end security.
02-Jul-2003 09:05:04Metering Authority - Long Island Power Authority REQUESTS SOUTHOLD___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 09:00 FOR LI LOCAL FOR EAST END SECURITY.
02-Jul-2003 09:42:39Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 09:00 FOR loss of 881/882 tower.
02-Jul-2003 10:28:22Metering Authority - Long Island Power Authority REQUESTS WADING RIVER_IC_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 10:00 FOR loss of 881/882 on 69kv system.
02-Jul-2003 11:15:36Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 11:00 FOR loss of 881/882 on 69kv system.
02-Jul-2003 11:23:39Metering Authority - Long Island Power Authority REQUESTS EAST HAMPTON___GT OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 11:00 FOR loss of 881/882 on 69kv system.
02-Jul-2003 11:24:01Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 11:00.
02-Jul-2003 11:25:28Metering Authority - Long Island Power Authority REQUESTS HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 11:00 FOR loss of 881/882 on 69kv system .
02-Jul-2003 15:06:09Metering Authority - Long Island Power Authority REQUESTS SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR east end loading.
02-Jul-2003 15:45:10Metering Authority - Long Island Power Authority REQUESTS EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR east end security.
02-Jul-2003 15:48:09Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore Bank 3 freshkils.
02-Jul-2003 15:48:10Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore Bank 3 freshkils.
02-Jul-2003 15:48:11Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore Bank 3 freshkils.
02-Jul-2003 15:48:11Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore Bank 3 freshkils.
02-Jul-2003 15:48:11Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore Bank 3 freshkils.
02-Jul-2003 15:48:11Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore Bank 3 freshkils.
02-Jul-2003 15:48:11Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore Bank 3 freshkils.
02-Jul-2003 15:48:12Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT3_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore Bank 3 freshkils.
02-Jul-2003 15:49:01Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT4_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore bank 3 foxhils.
02-Jul-2003 15:49:01Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT4_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore bank 3 foxhils.
02-Jul-2003 15:49:01Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT4_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore bank 3 foxhils.
02-Jul-2003 15:49:01Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT4_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore bank 3 foxhils.
02-Jul-2003 15:49:01Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT4_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore bank 3 foxhils.
02-Jul-2003 15:49:01Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT4_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore bank 3 foxhils.
02-Jul-2003 15:49:02Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT4_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore bank 3 foxhils.
02-Jul-2003 15:49:02Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT4_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 15:00 FOR switching to restore bank 3 foxhils.
02-Jul-2003 16:06:39Metering Authority - Consolidated Edison of NY REQUESTS ARTHUR_KILL_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 16:00 FOR switching to restore foxhills bank 3.
02-Jul-2003 16:28:30Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 16:00 FOR restoring foxhills bank 3.
02-Jul-2003 16:28:30Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 16:00 FOR restoring foxhills bank 3.
02-Jul-2003 16:28:30Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 16:00 FOR restoring foxhills bank 3.
02-Jul-2003 16:28:30Metering Authority - Consolidated Edison of NY REQUESTS GOWANUS_GT2_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 16:00 FOR restoring foxhills bank 3.
02-Jul-2003 16:29:20Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 16:00 FOR to restore foxhills bank 3.
02-Jul-2003 16:30:00Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 16:00 FOR to restore foxhills bank 3.
02-Jul-2003 16:30:27Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT2_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 16:00 FOR to restore foxhills bank 3.
02-Jul-2003 16:30:54Metering Authority - Consolidated Edison of NY UPDATES GOWANUS_GT2_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 16:00 FOR to restore foxhills bank 3.
02-Jul-2003 17:29:30PJM initiated curtailment cut 100 MWs. PJM TLR3A - Taking out at half past per PJM request.
02-Jul-2003 17:41:07Metering Authority - Long Island Power Authority REMOVES MONTAUK___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 17:00.
02-Jul-2003 18:04:09Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:04:09Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:04:09Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:04:09Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:04:09Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:04:09Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:04:09Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:04:09Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT3_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:04:42Metering Authority - Long Island Power Authority REMOVES SOUTHOLD___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:06:03Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT4_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:06:03Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT4_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:06:04Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT4_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:06:04Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT4_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:06:04Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT4_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:06:04Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT4_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:06:04Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT4_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:06:04Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT4_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:16:19Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood Staten Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:16:19Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood Staten Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:16:19Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood Staten Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:16:19Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood Staten Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:16:19Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood Staten Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:16:19Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood Staten Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:16:19Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood Staten Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:16:19Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood Staten Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:17:58Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood - Stat Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:17:58Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood - Stat Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:17:58Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood - Stat Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:17:58Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood - Stat Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:17:58Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood - Stat Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:17:59Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood - Stat Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:17:59Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood - Stat Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:17:59Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00 FOR Greenwood - Stat Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 18:29:36Metering Authority - Long Island Power Authority REMOVES EAST_HAMPTON___DIESEL OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:50:21Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:50:21Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:50:22Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:50:22Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:50:22Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:50:22Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:50:22Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:50:22Metering Authority - Consolidated Edison of NY REMOVES GOWANUS_GT2_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:51:37Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:52:04Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:52:04Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:52:04Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:52:04Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:52:04Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:52:04Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:52:05Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:52:48Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:53:30Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:53:30Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:53:30Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:53:30Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:53:30Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:53:30Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_8 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 18:53:30Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT2_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 18:00.
02-Jul-2003 19:06:16Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT1_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 21:00 FOR Greenwood Staten Island load pocket anticipated to go over normal as the Gowanus GT's are shut down. Foxhills switching complete..
02-Jul-2003 19:07:14Metering Authority - Consolidated Edison of NY REMOVES NARROWS_GT1_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 21:00.
02-Jul-2003 20:58:50Metering Authority - Consolidated Edison of NY REMOVES ARTHUR_KILL_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 20:00.
02-Jul-2003 21:02:15NARROWS_GT1_3 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 07/02/2003 20:59.
02-Jul-2003 21:02:15NARROWS_GT2_3 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 07/02/2003 20:59.
02-Jul-2003 21:02:15NARROWS_GT2_4 NO LONGER OOM FOR TO LOCAL SECURITY AFTER 07/02/2003 20:59.
02-Jul-2003 21:09:46Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_1 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 21:00 FOR POST CONT ON 36311.
02-Jul-2003 21:09:46Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_2 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 21:00 FOR POST CONT ON 36311.
02-Jul-2003 21:09:46Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 21:00 FOR POST CONT ON 36311.
02-Jul-2003 21:09:46Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_4 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 21:00 FOR POST CONT ON 36311.
02-Jul-2003 21:09:46Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_5 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 21:00 FOR POST CONT ON 36311.
02-Jul-2003 21:09:46Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 21:00 FOR POST CONT ON 36311.
02-Jul-2003 21:09:46Metering Authority - Consolidated Edison of NY REQUESTS NARROWS_GT2_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 21:00 FOR POST CONT ON 36311.
02-Jul-2003 21:40:44Metering Authority - Long Island Power Authority REMOVES SOUTH HAMPTN___IC OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 21:00.
02-Jul-2003 22:23:59PJM initiated curtailment cut 75 MWs.
02-Jul-2003 22:53:05Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_7 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 22:00.
02-Jul-2003 22:53:23Metering Authority - Long Island Power Authority REMOVES HOLTSVILLE_IC_3 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 07/02/2003 22:00.

Committed for Reliability

Back to top
Insert TimeMessage
02-Jul-2003 11:40:45Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 07/03/2003 22 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:40:46Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 07/03/2003 23 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:41:09Generator: ASTORIA___5 scheduled for local reliability in DAM market for 07/03/2003 20 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:41:10Generator: ASTORIA___5 scheduled for local reliability in DAM market for 07/03/2003 21 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:41:13Generator: ASTORIA___5 scheduled for local reliability in DAM market for 07/03/2003 22 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:41:14Generator: ASTORIA___5 scheduled for local reliability in DAM market for 07/03/2003 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:41:38Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 07/03/2003 23 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:15Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 00 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:16Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 01 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:17Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 02 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:18Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 03 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:19Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 04 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:20Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 05 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:22Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 06 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:23Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 07 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:24Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 08 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:25Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 09 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:26Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 10 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:27Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 11 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:28Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 12 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:29Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 13 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:30Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 14 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:31Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 15 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:32Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 16 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:33Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 17 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:35Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 18 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:36Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 19 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:37Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 20 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:38Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 21 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:39Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 22 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 11:42:40Generator: POLETTI____ scheduled for local reliability in DAM market for 07/03/2003 23 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:32Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:34Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:35Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:36Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:37Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:38Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:39Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:40Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:42Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:43Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:44Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:45Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:46Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:47Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:48Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:49Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:50Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:51Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:52Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:53Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:54Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:56Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:57Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:27:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 07/03/2003 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:28:21Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/03/2003 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:28:22Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/03/2003 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
02-Jul-2003 15:28:23Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 07/03/2003 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
02-Jul-2003 11:30:20The Real Time prices have been updated in the MIS for 06/26/2003 in hours (23)
02-Jul-2003 14:58:23The Real Time prices have been updated in the MIS for 06/30/2003 in hours (17,18)
02-Jul-2003 16:07:25NYISO is reserving hours beginning 17:00 and 18:00 in the July 01, 2003 Real-Time Market. Prices in the July 01, 2003 Hour-Ahead Market are correct. Prices in the July 02, 2003 Day-Ahead Market are correct.