P-2503-Feb-2003

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
03-Feb-2003 11:14:36PJM initiated curtailment cut 233 MWs. transmission
03-Feb-2003 13:50:30TP-CE REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/03/2003 13:00 FOR OOM FOR CE FOR 61 CONTINGENCY.
03-Feb-2003 13:51:26TP-CE REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/03/2003 13:00.
03-Feb-2003 14:08:50TP-CE REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/03/2003 16:00 FOR OOM FOR CE FOR 61 CONTINGENCY..
03-Feb-2003 15:20:42TP-CE UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/03/2003 15:00 FOR OOM FOR CE FOR 61 CONTINGENCY..
03-Feb-2003 15:25:14TP-CE REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/03/2003 15:00.
03-Feb-2003 15:27:24TP-CE REQUESTS EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/03/2003 16:00 FOR OOM FOR CE FOR 61 CONTINGECY.
03-Feb-2003 15:32:07TP-CE UPDATES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/03/2003 15:00 FOR OOM FOR CE FOR 61 CONTINGECY.
03-Feb-2003 16:21:37TP-CE REMOVES EAST RIVER___6 OUT OF MERIT. OOM FOR TO LOCAL SECURITY AT START TIME 02/03/2003 16:00.

Committed for Reliability

Back to top
Insert TimeMessage
03-Feb-2003 12:02:47Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 00 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:02:49Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 01 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:02:50Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 02 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:02:51Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 03 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:02:53Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 04 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:02:54Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:02:55Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:02:56Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:02:57Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:02:58Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:02:59Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:03:00Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:03:01Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:03:03Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:03:04Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:03:05Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:03:06Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:03:07Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:03:08Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:03:09Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:03:10Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:03:11Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:03:12Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:03:13Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/04/2003 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:43Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:44Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:45Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:46Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:48Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:49Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:50Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:51Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:52Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:53Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:54Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:55Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:56Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:57Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:58Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:04:59Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:01Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:02Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:03Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:04Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:05Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:06Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:07Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:08Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/04/2003 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:52Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 00 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:53Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 01 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:54Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 02 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:55Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 03 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:56Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 04 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:58Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:05:59Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:00Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:01Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:02Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:03Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:04Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:06Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:07Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:08Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:09Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:10Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:11Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:12Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:13Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:14Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:15Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Feb-2003 12:06:16Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/04/2003 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
03-Feb-2003 15:49:42Prices in the February 2, 2003 Real-Time Market are correct. NYISO is reserving hour beginning 7:00 in the February 2, 2003 Hour-Ahead Market to verify locational reserve prices. Prices in the February 3, 2003 Day-Ahead Market are correct.
03-Feb-2003 17:49:45The Real Time prices have been updated in the MIS for 01/31/2003 in hours (10,11,21)
03-Feb-2003 18:47:22The Real Time prices have been updated in the MIS for 02/01/2003 in hours (01)