P-2515-Jun-2002

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
15-Jun-2002 05:22:38PJM initiated curtailment cut 200 MWs. ramp limitations
15-Jun-2002 11:25:25PJM initiated curtailment cut 350 MWs. PJM cut for HB12 ramp
15-Jun-2002 13:15:17TP-LI REQUESTS NORTHPORT___4 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/15/2002 13:00.
15-Jun-2002 22:24:22TP-LI REMOVES NORTHPORT___4 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/15/2002 22:00.

Committed for Reliability

Back to top
Insert TimeMessage
15-Jun-2002 12:18:05Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:06Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:07Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:08Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:10Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:11Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:12Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:13Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:14Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:15Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:16Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:17Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:18Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:19Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:21Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:22Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:23Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:24Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:25Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:26Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:27Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:28Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:29Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:18:30Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 06/16/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:19:53Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:19:54Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:19:55Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:19:56Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:19:57Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:19:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:19:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:01Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:02Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:03Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:04Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:05Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:06Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:07Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:08Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:09Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:10Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:11Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:12Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:13Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:15Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:16Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:17Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:18Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/16/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:38Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:39Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:40Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:41Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:42Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:43Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:45Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:46Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:47Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:48Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:49Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:50Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:51Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:52Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:53Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:54Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:55Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:56Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:20:58Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:21:00Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:21:01Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:21:02Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 12:21:03Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/16/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:21Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 00 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:22Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 01 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:23Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 02 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:24Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 03 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:25Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 04 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:27Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 05 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:28Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 06 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:29Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 07 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:30Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 08 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:31Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 09 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:32Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 10 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:33Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 11 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:34Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 12 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:35Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 13 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:36Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 14 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:37Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 15 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:38Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 16 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:40Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 17 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:41Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 18 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:42Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 19 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:43Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 20 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:44Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 21 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:45Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 22 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 13:55:46Generator: ASTORIA___4 scheduled for local reliability in DAM market for 06/16/2002 23 Energy = 110 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:20Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 00 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:22Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 01 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:23Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 02 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:24Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 03 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:25Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 04 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:26Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 05 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:27Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 06 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:28Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 07 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:29Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 08 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:30Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 09 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:31Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 10 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:32Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 11 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:33Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 12 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:35Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 13 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:36Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 14 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:37Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 15 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:38Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 16 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:39Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 17 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:40Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 18 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:41Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 19 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:42Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 20 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:43Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 21 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:44Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 22 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Jun-2002 14:24:45Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/16/2002 23 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
15-Jun-2002 13:39:14Prices in the June 14, 2002 Real-Time Market are correct. Prices in the June 15, 2002 Day-Ahead Market are correct. This e-mail information is a copy of the official posting which can be found at the following address of our website: http://mis.nyiso.com/public/htm/OperMessages/CurrentOperMessages.htm#mm