NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
03-Jun-2002 00:07:40TP-CE REMOVES ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 00:00.
03-Jun-2002 00:08:41TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 00:00.
03-Jun-2002 01:32:30TP-CE REMOVES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 01:00.
03-Jun-2002 01:33:03TP-CE REMOVES RAVENSWOOD___1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 01:00.
03-Jun-2002 06:14:04TP-CE REQUESTS ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 06:00.
03-Jun-2002 06:50:28TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 06:00.
03-Jun-2002 07:06:32TP-CE UPDATES ASTORIA___4 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 07:00.
03-Jun-2002 07:07:17TP-CE UPDATES ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 07:00.
03-Jun-2002 07:31:18TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 07:00.
03-Jun-2002 07:31:50TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 07:00.
03-Jun-2002 07:54:15TP-CE UPDATES ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 07:00.
03-Jun-2002 07:54:49TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 07:00.
03-Jun-2002 08:16:37TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 08:00.
03-Jun-2002 09:09:46TP-CE UPDATES ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 09:00.
03-Jun-2002 09:10:39TP-CE REQUESTS RAVENSWOOD___1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 09:00.
03-Jun-2002 09:11:09TP-CE UPDATES ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 09:00.
03-Jun-2002 10:24:55TP-CE REMOVES ASTORIA___4 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 10:00.
03-Jun-2002 10:31:33TP-CE REMOVES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 10:00.
03-Jun-2002 10:43:21TP-CE REMOVES ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 10:00.
03-Jun-2002 10:54:57TP-CE REMOVES RAVENSWOOD___1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 10:00.
03-Jun-2002 12:16:00The NYISO has experienced a problem with the HAM posting for 06/03/2002 13:00. We are currently working on the problem and expect to have schedules posted no later than 10 minutes before the hour.
03-Jun-2002 16:56:29TP-LI REQUESTS NORTHPORT___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 16:00.
03-Jun-2002 16:57:50TP-LI REQUESTS NORTHPORT___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 16:00.
03-Jun-2002 17:09:15TP-LI UPDATES HOLTSVILLE_IC_5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 17:00.
03-Jun-2002 17:10:14TP-LI REQUESTS HOLTSVILLE_IC_8 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 17:00.
03-Jun-2002 18:02:39TP-LI REMOVES HOLTSVILLE_IC_5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 18:00.
03-Jun-2002 18:02:57TP-LI REMOVES HOLTSVILLE_IC_8 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 18:00.
03-Jun-2002 18:03:21TP-LI REMOVES NORTHPORT___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 18:00.
03-Jun-2002 18:03:44TP-LI REMOVES NORTHPORT___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/03/2002 18:00.

Committed for Reliability

Back to top
Insert TimeMessage
03-Jun-2002 12:34:21Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 00 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:23Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 01 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:24Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 02 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:25Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 03 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:26Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 04 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:27Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 05 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:28Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 06 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:29Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 07 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:30Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 08 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:32Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 09 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:33Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 10 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:34Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 11 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:35Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 12 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:36Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 13 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:37Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 14 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:38Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 15 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:39Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 16 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:40Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 17 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:41Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 18 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:42Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 19 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:44Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 20 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:45Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 21 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:46Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 22 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:34:47Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 06/04/2002 23 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:35:48Generator: BARRETT___1 scheduled for local reliability in DAM market for 06/04/2002 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:36:18Generator: BARRETT___1 scheduled for local reliability in DAM market for 06/04/2002 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 12:37:39Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/04/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:12:51Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 00 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:12:53Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 01 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:12:54Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 02 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:12:55Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 03 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:12:56Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 04 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:12:57Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 05 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:12:59Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 06 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:00Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 07 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:01Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 08 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:02Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 09 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:04Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 10 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:05Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 11 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:06Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 12 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:07Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 13 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:08Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 14 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:09Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 15 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:10Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 16 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:11Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 17 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:13Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 18 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:14Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 19 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:15Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 20 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:16Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 21 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:17Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 22 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
03-Jun-2002 14:13:18Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/04/2002 23 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
03-Jun-2002 11:49:41The LBMP missing intervals for 18:12:08, 18:13:38, 18:18:38, 18:23:38, 18:29:50, 18:31:20, 18:36:20, 18:37:50, 18:42:50, 18:45:20 GMT on 6/1 were recovered and reposted to the MIS after the fact.
03-Jun-2002 15:29:55The NYISO is reserving hours beginning 00:00, 09:00 and 23:00 in the June 02, 2002 Real-Time Market. Prices in the June 02, 2002 Hour-Ahead Market are correct. The NYISO is also reserving hours beginning 00:00-23:00 in the June 03, 2002 Day-Ahead Market.
03-Jun-2002 15:56:35Please note the following update for the Day-Ahead Market: There are no hours to be reserved. The reservations for today should read: The NYISO is reserving hours beginning 00:00, 09:00 and 23:00 in the June 02, 2002 Real-Time Market. Prices in the June 02, 2002 Hour-Ahead Market are correct. Prices in the June 03, 2002 Day-Ahead Market are correct. We apologize for any inconvenience this may have caused.
03-Jun-2002 17:04:31This for the Ham Update: **** Update Real Time prices in the MIS for 05/31/2002 resulted in no hours changing. ****
03-Jun-2002 17:26:02The Real Time prices have been updated in the MIS for 05/31/2002 in hours (08)
03-Jun-2002 17:55:32The Average Real Time prices have been updated in the MIS for 05/31/2002 in hours (08)
03-Jun-2002 19:56:43The Real Time prices have been updated in the MIS for 06/01/2002 in hours (10,12,14)