P-2522-Jun-2002

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
22-Jun-2002 04:18:09TP-CE REQUESTS ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/22/2002 04:00.
22-Jun-2002 06:38:28PJM initiated curtailment cut 372 MWs. PJM cut due to ramp at top of hour
22-Jun-2002 09:43:12TP-LI REQUESTS EAST HAMPTON___GT OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/22/2002 09:00.
22-Jun-2002 12:25:02TP-CH REQUESTS COXSACKIE___GT OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/22/2002 12:00.
22-Jun-2002 12:43:00ISO REQUESTS NYPA_GOWANUS_____GT5 OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 13:00.
22-Jun-2002 13:04:04ISO REQUESTS NYPA_GOWANUS_____GT6 OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 13:00.
22-Jun-2002 13:08:24TP-CE REQUESTS NYPA_GOWANUS_____GT5&6 OUT OF MERIT (DERATED TO 0) FOR ISO SECURITY. AT 13:00 06/22/02. GENERATOR COMING ONLINE WOULD CAUSE OVERLOAD ON 42231 GOWNAUS-GREENWOOD.
22-Jun-2002 13:26:53TP-LI REQUESTS WADING RIVER_IC_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/22/2002 13:00.
22-Jun-2002 14:24:38TP-CH REQUESTS SOUTH CAIRO___GT OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/22/2002 14:00.
22-Jun-2002 15:50:14TP-CE REQUESTS NARROWS_GT2_3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/22/2002 15:00.
22-Jun-2002 15:52:01ISO REQUESTS NARROWS_GT2_4 OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 15:00.
22-Jun-2002 15:55:44TP-CE REQUESTS NARROWS_GT2_3 &4 OUT OF MERIT FOR ISO SECURITY. AT 15:54 06/22/02.36311 POST CONTINGENCY FLOW FOR LOSS OF RAVENSWOOD 2 NEARING STE LEVEL. LOWERED GREENWOOD-STATEN ISLAND LOAD ZONE SCD LIMIT TO 900MW AS WELL.
22-Jun-2002 16:21:49ISO UPDATES NARROWS_GT2_4 OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 16:00.
22-Jun-2002 16:27:39TP-LI REMOVES WADING RIVER_IC_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/22/2002 16:00.
22-Jun-2002 17:04:59TP-CE REMOVES NARROWS_GT2_3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/22/2002 17:00.
22-Jun-2002 17:05:21ISO REMOVES NARROWS_GT2_4 OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 17:00.
22-Jun-2002 17:07:55TP-CE REQUESTS NARROWS_GT2_3&2_4 NO LONGER OUT OF MERIT. AT 17:00 06/22/02 HOUR AHEAD MARKET PICKED UP THESE GT'S SO THE OOM CAN BE CANCELLED
22-Jun-2002 18:24:56TP-LI REQUESTS WADING RIVER_IC_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/22/2002 18:00.
22-Jun-2002 18:42:41TP-CH REMOVES SOUTH CAIRO___GT OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/22/2002 18:00.
22-Jun-2002 19:20:03ISO REQUESTS NARROWS_GT2_3 OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 19:00.
22-Jun-2002 19:21:09ISO REQUESTS NARROWS_GT2_4 OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 19:00.
22-Jun-2002 19:22:53ISO UPDATES NARROWS_GT2_4 OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 19:00.
22-Jun-2002 19:27:58ISO REQUESTS NARROWS_GT2_3 AND 2-4 OUT OF MERIT FOR ISO SECURITY. AT 19:27 06/22/02 IN THE VERNON -GREENWOOD LOAD POCKET. 42232 OVER STE FOR THE LOSS OF RAVENSWOOD 2
22-Jun-2002 20:43:04ISO REMOVES NARROWS_GT2_3 OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 21:00.
22-Jun-2002 20:43:30ISO REMOVES NARROWS_GT2_4 OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 21:00.
22-Jun-2002 20:45:15NYISO Locational based curtailment cut 150 MWs.
22-Jun-2002 21:42:33ISO REQUESTS NYPA_VERNON_____GT3 OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 22:00.
22-Jun-2002 21:43:36ISO REQUESTS NYPA_KENT_____GT OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 22:00.
22-Jun-2002 21:45:13ISO REQUESTS NYPA_KENT GT AND NYPA VERNON 3 OUT OF MERIT FOR ISO SECURITY. AT 21:44 06/22/02. FOR THE VERNON -GREENWOOD POCKET. LOSS OF RAVENSWOOD ON THE 36311
22-Jun-2002 21:45:54ISO UPDATES NYPA_KENT_____GT OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 22:00.
22-Jun-2002 21:46:14ISO UPDATES NYPA_VERNON_____GT3 OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 22:00.
22-Jun-2002 22:02:25TP-LI REMOVES WADING RIVER_IC_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/22/2002 22:00.
22-Jun-2002 22:14:56TP-CH REMOVES COXSACKIE___GT OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/22/2002 22:00.
22-Jun-2002 22:25:01TP-LI REMOVES EAST HAMPTON___GT OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/22/2002 22:00.
22-Jun-2002 22:53:10ISO REMOVES NYPA_KENT_____GT OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 22:00.
22-Jun-2002 22:53:54ISO REMOVES NYPA_VERNON_____GT3 OUT OF MERIT FOR ISO SECURITY AT START TIME 06/22/2002 22:00.
22-Jun-2002 23:06:57TP-CE REQUESTS ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/23/2002 00:00.

Committed for Reliability

Back to top
Insert TimeMessage
22-Jun-2002 11:48:26Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 00 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 01 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:29Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 02 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:30Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 03 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:31Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 04 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:32Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 05 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:33Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 06 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:34Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 07 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:35Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 08 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:36Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 09 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:37Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 10 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:38Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 11 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:40Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 12 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:41Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 13 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:42Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 14 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:43Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 15 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:44Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 16 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:45Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 17 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:46Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 18 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:47Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 19 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:48Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 20 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:49Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 21 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:50Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 22 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 11:48:52Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 06/23/2002 23 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:10:29Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 06/23/2002 23 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:39Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:40Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:41Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:42Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:44Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:45Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:46Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:47Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:48Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:49Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:50Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:51Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:52Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:53Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:54Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:55Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:57Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:21:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:22:00Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:22:01Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:22:02Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:22:03Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:22:04Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/23/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:22:47Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/23/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:24:10Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 06/23/2002 00 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:24:11Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 06/23/2002 01 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:24:12Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 06/23/2002 02 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:24:13Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 06/23/2002 03 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:24:14Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 06/23/2002 04 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:24:15Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 06/23/2002 05 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:24:16Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 06/23/2002 06 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:24:17Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 06/23/2002 07 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
22-Jun-2002 13:24:18Generator: NORTHPORT___1 scheduled for local reliability in DAM market for 06/23/2002 08 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
22-Jun-2002 12:49:56The NYISO is reserving hour-beginning 15 in the 21 June 2002 real-time market to verify prices. The NYISO is reserving hours-beginning 0-2, 10, 16, 21, and 23 in the 21 June 2002 BME to verify locational reserves prices. The NYISO is reserving hour-beginning 21 in the 22 June 2002 Day-Ahead Market to verify prices resulting from an apparent grid configuration anomaly. Any corrections resulting from the analysis will be posted on 24 June.