P-2512-May-2002

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
12-May-2002 01:27:46TP-CE REQUESTS POLETTI____ OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 01:00.
12-May-2002 01:30:14TP-CE UPDATES POLETTI____ OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 01:00.
12-May-2002 03:45:35TP-NM REQUESTS HQ_GEN_CEDARS OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 03:00.
12-May-2002 09:31:48TP-CE REQUESTS NYPA_____HELLGATE_GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 10:00.
12-May-2002 09:32:11TP-CE REQUESTS NYPA_____HELLGATE_GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 10:00.
12-May-2002 09:32:42TP-CE REQUESTS NYPA_HARLEM__RVR__GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 10:00.
12-May-2002 09:33:08TP-CE REQUESTS NYPA_HARLEM__RVR__GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 10:00.
12-May-2002 18:24:06TP-CE REMOVES NYPA_HARLEM__RVR__GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 20:00.
12-May-2002 21:33:46TP-CE REQUESTS NYPA_HARLEM__RVR__GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 00:00.
12-May-2002 21:33:54TP-CE REQUESTS NYPA_____HELLGATE_GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 00:00.
12-May-2002 21:34:01TP-CE REQUESTS NYPA_____HELLGATE_GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 00:00.
12-May-2002 21:39:29TP-CE REMOVES NYPA_____HELLGATE_GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 21:00.
12-May-2002 21:43:29TP-CE REMOVES NYPA_HARLEM__RVR__GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 21:00.
12-May-2002 21:44:03TP-CE REMOVES NYPA_____HELLGATE_GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 21:00.

Committed for Reliability

Back to top
Insert TimeMessage
12-May-2002 12:06:29Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:30Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:31Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:32Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:33Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:34Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:35Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:37Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:38Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:39Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:40Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:41Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:42Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:43Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:44Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:45Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:46Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:47Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:48Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:50Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:51Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:52Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:53Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:06:54Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/13/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 12:07:24Generator: BARRETT___1 scheduled for local reliability in DAM market for 05/13/2002 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:29:22Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/13/2002 19 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:29:23Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/13/2002 20 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:29:24Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/13/2002 21 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:29:25Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/13/2002 22 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:29:26Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/13/2002 23 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:08Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 03 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:09Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 04 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:10Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 05 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:11Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 06 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:12Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 07 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:13Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 08 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:14Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 09 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:15Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 10 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:16Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 11 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:17Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 12 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:18Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 13 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:19Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 14 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:20Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 15 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:22Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 16 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:23Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 17 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:24Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 18 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:25Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 19 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:26Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 20 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:27Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 21 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:28Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 22 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
12-May-2002 13:30:29Generator: RAVENSWOOD___3 scheduled for local reliability in DAM market for 05/13/2002 23 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
12-May-2002 10:33:44The NYISO is reserving hours beginning 5:00 - 6:00, 17:00, 20:00 and 23:00 in the May 11, 2002 Real-Time Market. Prices in the May 12, 2002 Day-Ahead Market are correct.