P-2513-May-2002

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
13-May-2002 06:39:58PJM initiated curtailment cut 150 MWs. PJM cut due to ramp at top
13-May-2002 08:30:26TP-CE REQUESTS NYPA_HARLEM__RVR__GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 09:00.
13-May-2002 08:30:50TP-CE UPDATES NYPA_____HELLGATE_GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 09:00.
13-May-2002 08:44:47NYISO Locational based curtailment cut 300 MWs.
13-May-2002 09:41:49TP-CE REQUESTS RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 09:00.
13-May-2002 10:11:49TP-NYSEG UPDATES GREENIDGE___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 10:00.
13-May-2002 10:12:12TP-NYSEG UPDATES GREENIDGE___4 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 10:00.
13-May-2002 10:26:58TP-NYSEG REMOVES GREENIDGE___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 10:00.
13-May-2002 10:27:21TP-NYSEG REMOVES GREENIDGE___4 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 10:00.
13-May-2002 12:39:03TP-CE REQUESTS NYPA_____HELLGATE_GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 13:00.
13-May-2002 13:29:26NYISO Locational based curtailment cut 100 MWs.
13-May-2002 18:47:34ISO REQUESTS BARRETT___1 OUT OF MERIT FOR ISO SECURITY AT START TIME 05/13/2002 18:00.
13-May-2002 19:00:09TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 18:00.
13-May-2002 19:08:11TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 19:00.
13-May-2002 21:26:20ISO REMOVES BARRETT___1 OUT OF MERIT FOR ISO SECURITY AT START TIME 05/13/2002 21:00.
13-May-2002 21:27:38TP-CE REMOVES NYPA_____HELLGATE_GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 21:00.
13-May-2002 21:33:24TP-CE REQUESTS RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/14/2002 00:00.
13-May-2002 21:33:38TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/14/2002 00:00.
13-May-2002 21:46:38TP-CE REMOVES NYPA_____HELLGATE_GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 21:00.
13-May-2002 21:47:10TP-CE REMOVES NYPA_HARLEM__RVR__GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 21:00.
13-May-2002 23:26:30TP-CE REMOVES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 23:00.
13-May-2002 23:26:43TP-CE REMOVES RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/13/2002 23:00.

Committed for Reliability

Back to top
Insert TimeMessage
13-May-2002 12:37:04Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:06Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:07Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:08Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:09Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:10Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:11Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:12Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:13Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:15Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:16Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:17Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:18Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:19Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:20Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:21Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:22Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:23Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:24Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:26Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:27Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:28Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:29Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:30Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/14/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:55Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:56Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:58Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:37:59Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:00Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:01Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:02Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:03Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:04Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:05Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:07Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:08Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:09Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:10Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:11Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:12Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:13Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:14Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:15Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:16Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:17Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:18Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:38:19Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/14/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:40:53Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 00 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:40:54Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 01 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:40:55Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 02 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:40:56Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 03 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:40:57Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 04 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:40:59Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 05 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:00Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 06 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:01Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 07 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:02Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 08 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:03Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 09 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:04Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 10 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:05Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 11 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:06Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 12 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:07Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 13 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:08Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 14 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:09Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 15 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:10Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 16 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:11Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 17 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:13Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 18 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:14Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 19 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:15Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 20 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:16Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 21 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:17Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 22 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:41:18Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 05/14/2002 23 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 12:42:05Generator: BARRETT___1 scheduled for local reliability in DAM market for 05/14/2002 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:19Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 00 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:20Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 01 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:21Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 02 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:22Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 03 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:23Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 04 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:24Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 05 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:25Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 06 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:27Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 07 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:28Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 08 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:29Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 09 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:30Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 10 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:31Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 11 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:32Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 12 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:33Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 13 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:34Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 14 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:35Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 15 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:36Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 16 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:37Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 17 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:38Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 18 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:40Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 19 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:41Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 20 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:42Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 21 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:43Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 22 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
13-May-2002 13:01:44Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 05/14/2002 23 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
13-May-2002 12:29:07The Real Time prices have been updated in the MIS for 05/09/2002 in hours (15)
13-May-2002 13:06:50The Average Real Time prices have been updated in the MIS for 05/09/2002 in hours (15)
13-May-2002 15:27:54The NYISO is reserving hour beginning 08:00 in the May 12, 2002 Real-Time Market. In addition, the NYISO is reserving hours beginning 02:00, 05:00 and 06:00 in the May 12, 2002 Hour-Ahead Market to verify locational reserves prices. Prices in the May 13, 2002 Day-Ahead Market are correct.
13-May-2002 16:22:11The Real Time prices have been updated in the MIS for 05/11/2002 in hours (06,17,23)
13-May-2002 16:44:07The Average Real Time prices have been updated in the MIS for 05/11/2002 in hours (06,17,23)