P-2511-May-2002

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
11-May-2002 09:21:27TP-CE REQUESTS NYPA_____HELLGATE_GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 10:00.
11-May-2002 09:22:01TP-CE REQUESTS NYPA_____HELLGATE_GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 10:00.
11-May-2002 09:23:06TP-CE REQUESTS NYPA_HARLEM__RVR__GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 10:00.
11-May-2002 09:23:31TP-CE REQUESTS NYPA_HARLEM__RVR__GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 10:00.
11-May-2002 09:24:17TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 09:00.
11-May-2002 09:25:52TP-CE REMOVES NYPA_____HELLGATE_GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 12:00.
11-May-2002 15:02:28TP-CE REQUESTS RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 15:00.
11-May-2002 17:25:06TP-CE UPDATES RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 17:00.
11-May-2002 19:55:01TP-CE UPDATES NYPA_____HELLGATE_GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 20:00.
11-May-2002 19:55:18TP-CE UPDATES NYPA_____HELLGATE_GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 20:00.
11-May-2002 20:12:21TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 20:00.
11-May-2002 21:20:41TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 00:00.
11-May-2002 21:20:49TP-CE REQUESTS NYPA_HARLEM__RVR__GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 00:00.
11-May-2002 21:20:58TP-CE REQUESTS NYPA_HARLEM__RVR__GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 00:00.
11-May-2002 21:21:06TP-CE REQUESTS NYPA_____HELLGATE_GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 00:00.
11-May-2002 21:21:12TP-CE REQUESTS NYPA_____HELLGATE_GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 00:00.
11-May-2002 21:21:23TP-CE REQUESTS RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/12/2002 00:00.
11-May-2002 22:14:03TP-CE REMOVES NYPA_HARLEM__RVR__GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 22:00.
11-May-2002 22:14:40TP-CE REMOVES NYPA_____HELLGATE_GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 22:00.
11-May-2002 22:51:32TP-CE REMOVES NYPA_HARLEM__RVR__GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 22:00.
11-May-2002 22:52:11TP-CE REMOVES NYPA_____HELLGATE_GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 22:00.
11-May-2002 23:22:06TP-CE REMOVES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 23:00.
11-May-2002 23:22:46TP-CE REMOVES RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 05/11/2002 23:00.

Committed for Reliability

Back to top
Insert TimeMessage
11-May-2002 13:25:50Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:25:52Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:25:53Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:25:54Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:25:55Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:25:56Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:25:57Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:25:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:25:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:00Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:01Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:03Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:04Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:05Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:06Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:07Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:08Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:09Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:10Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:11Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:12Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:13Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:15Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:16Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 05/12/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:40Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:41Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:42Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:43Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:44Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:45Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:46Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:47Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:48Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:50Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:51Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:52Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:53Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:54Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:55Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:56Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:57Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:58Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:26:59Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:27:00Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:27:01Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:27:02Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:27:03Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
11-May-2002 13:27:04Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 05/12/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
11-May-2002 11:09:01Prices in the May 10, 2002 Real-Time Market are correct. The NYISO is reserving hours beginning 10:00 and 18:00 in the May 10, 2002 Hour-Ahead Market to verify locational reserves prices. Prices in the May 11, 2002 Day-Ahead Market are correct.