Insert Time | Message |
14-Feb-2002 00:23:41 | TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 00:00. |
14-Feb-2002 00:24:13 | TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 00:00. |
14-Feb-2002 02:23:33 | TP-CE REMOVES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 02:00. |
14-Feb-2002 02:47:51 | ISO REQUESTS NORTHPORT___1 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 02:00. |
14-Feb-2002 02:48:56 | ISO UPDATES NORTHPORT___1 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 02:00. |
14-Feb-2002 03:03:44 | ISO UPDATES NORTHPORT___1 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 03:00. |
14-Feb-2002 03:18:14 | ISO REQUESTS NORTHPORT___3 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 03:00. |
14-Feb-2002 05:17:29 | ISO REMOVES NORTHPORT___1 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 05:00. |
14-Feb-2002 05:31:13 | ISO REMOVES NORTHPORT___3 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 05:00. |
14-Feb-2002 06:29:56 | TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 06:00. |
14-Feb-2002 06:43:34 | 02/14/2002 06:42:24 NYISO SCD reserve pick-up remains active. |
14-Feb-2002 06:45:44 | 02/14/2002 06:32:24 NYISO SCD reserve pick-up executed. |
14-Feb-2002 07:12:01 | TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 07:00. |
14-Feb-2002 07:35:46 | TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 07:00. |
14-Feb-2002 08:15:27 | ISO REQUESTS HOLTSVILLE_IC_2 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 08:00. |
14-Feb-2002 10:16:02 | TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 10:00. |
14-Feb-2002 10:39:50 | ISO REMOVES HOLTSVILLE_IC_2 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 10:00. |
14-Feb-2002 11:19:34 | TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 11:00. |
14-Feb-2002 12:13:38 | TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 12:00. |
14-Feb-2002 14:34:38 | TP-CE REQUESTS NYPA_HARLEM__RVR__GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 15:00. |
14-Feb-2002 14:36:18 | TP-CE REQUESTS NYPA_HARLEM__RVR__GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 15:00. |
14-Feb-2002 15:50:28 | TP-CE REQUESTS NYPA_____HELLGATE_GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 16:00. |
14-Feb-2002 16:32:55 | PJM initiated curtailment cut 300 MWs. |
14-Feb-2002 17:02:36 | ISO UPDATES GILBOA___1 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 17:00. |
14-Feb-2002 17:02:56 | ISO UPDATES GILBOA___4 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 17:00. |
14-Feb-2002 17:05:41 | TP-CE REQUESTS RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 17:00. |
14-Feb-2002 17:15:14 | ISO REMOVES GILBOA___1 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 17:00. |
14-Feb-2002 17:31:23 | ISO REMOVES GILBOA___4 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 17:00. |
14-Feb-2002 17:50:01 | ISO REQUESTS GILBOA___2 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 17:00. |
14-Feb-2002 17:53:12 | TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 17:00. |
14-Feb-2002 18:57:08 | ISO REQUESTS GILBOA___4 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/14/2002 18:00. |
14-Feb-2002 21:30:47 | TP-CE REMOVES RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 21:00. |
14-Feb-2002 21:31:02 | TP-CE REMOVES NYPA_HARLEM__RVR__GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 21:00. |
14-Feb-2002 21:31:16 | TP-CE REMOVES NYPA_HARLEM__RVR__GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 22:00. |
14-Feb-2002 21:31:29 | TP-CE REMOVES NYPA_____HELLGATE_GT2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 22:00. |
14-Feb-2002 22:25:27 | TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/15/2002 00:00. |
14-Feb-2002 22:53:39 | TP-CE REMOVES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/14/2002 22:00. |
Insert Time | Message |
14-Feb-2002 12:28:34 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:37 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:38 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:39 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:40 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:41 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:42 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:43 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:44 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:45 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:46 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:48 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:49 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:50 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:28:51 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/15/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:00 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:01 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:02 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:03 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:04 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:06 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:07 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:08 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:09 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:10 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:11 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:12 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:13 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:14 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:15 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:17 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:18 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:19 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:20 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:21 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:22 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:23 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:24 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 12:30:25 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/15/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 13:36:10 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 02/15/2002 14 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 13:36:11 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 02/15/2002 15 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 13:36:12 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 02/15/2002 16 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 13:36:13 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 02/15/2002 17 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 13:36:14 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 02/15/2002 18 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 13:36:15 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 02/15/2002 19 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 13:36:16 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 02/15/2002 20 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 13:36:18 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 02/15/2002 21 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 13:36:19 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 02/15/2002 22 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 13:36:20 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 02/15/2002 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 13:36:53 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/15/2002 22 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
14-Feb-2002 13:36:54 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/15/2002 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |