Insert Time | Message |
06-Feb-2002 03:49:57 | ISO REQUESTS BARRETT___1 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/06/2002 03:00. |
06-Feb-2002 03:50:50 | ISO REQUESTS BARRETT___2 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/06/2002 03:00. |
06-Feb-2002 06:18:56 | ISO REMOVES BARRETT___1 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/06/2002 06:00. |
06-Feb-2002 06:19:24 | ISO REMOVES BARRETT___2 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/06/2002 06:00. |
06-Feb-2002 06:21:03 | 02/06/2002 06:12:44 NYISO SCD reserve pick-up executed. |
06-Feb-2002 06:29:54 | ISO REMOVES BARRETT___2 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/06/2002 06:00. |
06-Feb-2002 06:48:28 | 02/06/2002 06:47:18 NYISO SCD reserve pick-up remains active. |
06-Feb-2002 06:48:55 | 02/06/2002 06:37:14 NYISO SCD reserve pick-up executed. |
06-Feb-2002 08:39:14 | TP-CH REQUESTS SOUTH CAIRO___GT OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/06/2002 08:00. |
06-Feb-2002 09:32:00 | TP-NYPA REQUESTS NIAGARA____, GILBOA, AND POLETTI OUT OF MERIT FOR T.O. COMMUNICATION FAILURE AT 09:15 02/06/02 |
06-Feb-2002 10:04:08 | TP-NYPA REQUESTS GILBOA____ NO LONGER OUT OF MERIT. AT 10:00 02/06/02 |
06-Feb-2002 10:14:49 | TP-NYPA REQUESTS NIAGARA____, AND POLETTI NO LONGER OUT OF MERIT. AT 10:14 02/06/02 |
06-Feb-2002 13:31:24 | TP-CE REQUESTS NYPA_HARLEM__RVR__GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/06/2002 14:00. |
06-Feb-2002 14:41:16 | TP-CE REQUESTS NYPA_____HELLGATE_GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/06/2002 15:00. |
06-Feb-2002 15:30:09 | TP-CH REMOVES SOUTH CAIRO___GT OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/06/2002 15:00. |
06-Feb-2002 16:35:57 | PJM initiated curtailment cut 400 MWs. |
06-Feb-2002 17:27:28 | TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/06/2002 17:00. |
06-Feb-2002 17:31:05 | ISO UPDATES BARRETT_IC_5 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/06/2002 17:00. |
06-Feb-2002 17:36:05 | TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/06/2002 17:00. |
06-Feb-2002 17:38:32 | ISO REMOVES BARRETT_IC_5 OUT OF MERIT FOR ISO SECURITY AT START TIME 02/06/2002 17:00. |
06-Feb-2002 20:23:08 | NYISO Locational based curtailment cut 100 MWs. |
06-Feb-2002 20:34:39 | HQ initiated curtailment added 100 MWs. |
06-Feb-2002 21:02:18 | TP-CE REMOVES NYPA_____HELLGATE_GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/06/2002 21:00. |
06-Feb-2002 21:02:52 | TP-CE REMOVES NYPA_HARLEM__RVR__GT1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 02/06/2002 21:00. |
Insert Time | Message |
06-Feb-2002 11:04:42 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 02/07/2002 22 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 11:04:44 | Generator: ASTORIA___3 scheduled for local reliability in DAM market for 02/07/2002 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 11:05:14 | Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/07/2002 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:00 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:02 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:03 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:04 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:05 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:07 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:08 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:09 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:10 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:11 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:12 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:13 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:14 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:15 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:16 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:17 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:18 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:20 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:21 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:22 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:23 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:24 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:25 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:05:26 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:38 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:39 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:40 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:41 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:42 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:43 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:44 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:45 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:46 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:47 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:48 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:50 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:51 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:52 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:53 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:54 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:55 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:56 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:57 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:58 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:07:59 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:08:00 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:08:01 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:08:02 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/07/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:08:59 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:00 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:01 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:02 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:03 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:04 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:05 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:06 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:07 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:08 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:09 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:10 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:11 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:12 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:13 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:15 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:16 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:17 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:18 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:19 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:20 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:21 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:22 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:23 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/07/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:51 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/07/2002 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
06-Feb-2002 14:09:52 | Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/07/2002 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |