Insert Time | Message |
07-Dec-2001 00:24:04 | ISO REQUESTS GILBOA___1 OUT OF MERIT FOR ISO SECURITY AT START TIME 12/07/2001 00:00. |
07-Dec-2001 00:27:33 | TP-LI REMOVES WADING RIVER_IC_3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 00:00. |
07-Dec-2001 01:35:04 | ISO REQUESTS GILBOA___2 OUT OF MERIT FOR ISO SECURITY AT START TIME 12/07/2001 01:00. |
07-Dec-2001 03:31:55 | ISO REMOVES GILBOA___2 OUT OF MERIT FOR ISO SECURITY AT START TIME 12/07/2001 03:00. |
07-Dec-2001 03:33:09 | ISO UPDATES GILBOA___2 OUT OF MERIT FOR ISO SECURITY AT START TIME 12/07/2001 03:00. |
07-Dec-2001 07:00:28 | TP-LI REQUESTS WADING RIVER_IC_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 07:00. |
07-Dec-2001 07:23:09 | TP-CE UPDATES PEEKSKILL____ OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 07:00. |
07-Dec-2001 07:24:01 | TP-LI UPDATES WADING RIVER_IC_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 07:00. |
07-Dec-2001 07:30:41 | TP-CE UPDATES PEEKSKILL____ OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 07:00. |
07-Dec-2001 07:34:21 | TP-CE UPDATES PEEKSKILL____ OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 07:00. |
07-Dec-2001 07:49:43 | TP-CE REQUESTS RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 07:00. |
07-Dec-2001 08:14:42 | TP-CE UPDATES RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 08:00. |
07-Dec-2001 08:17:29 | TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 08:00. |
07-Dec-2001 09:12:27 | TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 09:00. |
07-Dec-2001 09:33:48 | TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 09:00. |
07-Dec-2001 10:26:34 | TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 10:00. |
07-Dec-2001 10:33:17 | TP-CE REQUESTS ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 10:00. |
07-Dec-2001 17:00:53 | 12/07/2001 16:50:14 NYISO SCD reserve pick-up executed. |
07-Dec-2001 17:00:59 | 12/07/2001 17:00:18 NYISO SCD reserve pick-up remains active. |
07-Dec-2001 17:02:26 | 12/07/2001 17:00:00 NYISO SCD reserve pick-up executed. |
07-Dec-2001 17:12:21 | TP-CE REQUESTS ASTORIA_GT4_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 17:00. |
07-Dec-2001 17:13:51 | TP-CE REQUESTS ASTORIA_GT4_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 17:00. |
07-Dec-2001 17:15:41 | TP-LI REQUESTS WADING RIVER_IC_3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 17:00. |
07-Dec-2001 19:49:26 | TP-CE REMOVES ASTORIA_GT4_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 19:00. |
07-Dec-2001 19:49:58 | TP-CE REMOVES ASTORIA_GT4_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 19:00. |
07-Dec-2001 21:19:07 | TP-CE REMOVES ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 21:00. |
07-Dec-2001 21:35:51 | TP-CE UPDATES RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 21:00. |
07-Dec-2001 21:56:54 | TP-CE REMOVES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 21:00. |
07-Dec-2001 22:46:45 | TP-LI REMOVES WADING RIVER_IC_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 22:00. |
07-Dec-2001 22:47:38 | TP-LI UPDATES WADING RIVER_IC_3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/07/2001 22:00. |
Insert Time | Message |
07-Dec-2001 11:11:59 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/08/2001 22 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:12:01 | Generator: RAVENSWOOD___2 scheduled for local reliability in DAM market for 12/08/2001 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:06 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 00 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:07 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 01 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:08 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 02 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:09 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 03 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:11 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 04 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:12 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:13 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:14 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:15 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:16 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:17 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:18 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:19 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:20 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:21 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:22 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:23 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:25 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:26 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:27 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:28 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:29 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:30 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:19:31 | Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/08/2001 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:20:47 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:20:48 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:20:49 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:20:50 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:20:51 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:20:52 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:20:53 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:20:54 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:20:56 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:20:57 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:20:58 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:20:59 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:00 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:01 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:02 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:03 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:04 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:05 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:06 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:07 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:09 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:10 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:11 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:12 | Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/08/2001 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:39 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:40 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:41 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:42 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:43 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:45 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:46 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:47 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:48 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:49 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:50 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:51 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:52 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:53 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:54 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:55 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:57 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:58 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:21:59 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:22:00 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:22:01 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:22:02 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:22:03 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:22:04 | Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/08/2001 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:36 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 00 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:37 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 01 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:38 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 02 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:40 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 03 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:41 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 04 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:42 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 05 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:43 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 06 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:44 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 07 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:45 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 08 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:46 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 09 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:47 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 10 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:48 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 11 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:49 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 12 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:50 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 13 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:51 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 14 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:52 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 15 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:54 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 16 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:55 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 17 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:56 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 18 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:57 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 19 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:58 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 20 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:24:59 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 21 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:25:00 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 22 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:25:01 | Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 12/08/2001 23 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |
07-Dec-2001 11:25:27 | Generator: BARRETT___2 scheduled for local reliability in DAM market for 12/08/2001 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW. |