NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
09-Dec-2001 00:34:37TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 00:00.
09-Dec-2001 00:35:11TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 00:00.
09-Dec-2001 01:38:14TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 01:00.
09-Dec-2001 01:54:28TP-CE UPDATES RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 01:00.
09-Dec-2001 02:34:52TP-CE UPDATES RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 02:00.
09-Dec-2001 04:48:23TP-CE REMOVES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 04:00.
09-Dec-2001 05:22:27PJM initiated curtailment cut 200 MWs. PJM Ramp considerations
09-Dec-2001 08:32:56TP-CE UPDATES RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 08:00.
09-Dec-2001 08:33:57TP-CE UPDATES RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 08:00.
09-Dec-2001 13:16:45TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 13:00.
09-Dec-2001 13:18:14TP-CE REQUESTS ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 12:00.
09-Dec-2001 13:21:26TP-CE UPDATES ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 13:00.
09-Dec-2001 14:56:21TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 14:00.
09-Dec-2001 14:58:02TP-CE UPDATES ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 14:00.
09-Dec-2001 14:58:25TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 14:00.
09-Dec-2001 15:01:32TP-CE REQUESTS ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 15:00.
09-Dec-2001 15:07:32TP-LI REQUESTS WADING RIVER_IC_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 15:00.
09-Dec-2001 15:17:38TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 15:00.
09-Dec-2001 15:52:01TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 15:00.
09-Dec-2001 16:50:1412/09/2001 16:40:33 NYISO SCD reserve pick-up executed.
09-Dec-2001 17:17:15TP-LI REQUESTS WADING RIVER_IC_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 17:00.
09-Dec-2001 17:48:49TP-CE UPDATES ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 17:00.
09-Dec-2001 17:50:09TP-CE REQUESTS ASTORIA_GT3_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 17:00.
09-Dec-2001 17:52:10TP-CE REQUESTS ASTORIA_GT2_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 17:00.
09-Dec-2001 17:52:38TP-CE REQUESTS ASTORIA_GT2_3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 17:00.
09-Dec-2001 17:53:06TP-CE REQUESTS ASTORIA_GT2_4 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 17:00.
09-Dec-2001 18:01:32TP-CE UPDATES ASTORIA_GT3_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 18:00.
09-Dec-2001 18:03:08TP-CE UPDATES ASTORIA_GT3_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 18:00.
09-Dec-2001 20:13:06TP-CE REMOVES ASTORIA_GT2_3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 20:00.
09-Dec-2001 20:19:06TP-CE REMOVES ASTORIA_GT3_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 20:00.
09-Dec-2001 20:24:11TP-CE REMOVES ASTORIA_GT2_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 20:00.
09-Dec-2001 20:24:36TP-CE REMOVES ASTORIA_GT2_4 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 20:00.
09-Dec-2001 21:23:10TP-CE REMOVES ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 21:00.
09-Dec-2001 21:26:40TP-CE UPDATES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 21:00.
09-Dec-2001 21:50:26TP-CE REMOVES ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 21:00.
09-Dec-2001 22:14:24TP-LI REMOVES WADING RIVER_IC_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/09/2001 22:00.
09-Dec-2001 22:33:37TP-CE REQUESTS RAVENSWOOD___2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 12/10/2001 00:00.

Committed for Reliability

Back to top
Insert TimeMessage
09-Dec-2001 10:35:12Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/10/2001 00 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 10:35:14Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/10/2001 01 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 10:35:15Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/10/2001 02 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 10:35:16Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/10/2001 03 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 10:35:17Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/10/2001 04 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 10:35:18Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/10/2001 05 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 10:35:19Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/10/2001 06 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 10:35:20Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/10/2001 07 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 10:35:22Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/10/2001 08 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 10:35:56Generator: ASTORIA___5 scheduled for local reliability in DAM market for 12/10/2001 21 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 10:35:57Generator: ASTORIA___5 scheduled for local reliability in DAM market for 12/10/2001 22 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 10:35:58Generator: ASTORIA___5 scheduled for local reliability in DAM market for 12/10/2001 23 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:40:58Generator: BARRETT___2 scheduled for local reliability in DAM market for 12/10/2001 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:41:22Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/10/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:41:23Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/10/2001 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:41:54Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:41:55Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:41:56Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:41:57Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:41:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:41:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:01Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:02Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:03Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:04Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:05Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:06Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:07Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:08Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:09Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:11Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:12Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:13Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:14Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:15Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:16Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:17Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:19Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 12:42:20Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/10/2001 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 13:15:17Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/09/2001 15 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 13:15:18Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/09/2001 16 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 13:15:20Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/09/2001 17 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 13:15:21Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/09/2001 18 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 13:15:22Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/09/2001 19 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 13:15:23Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/09/2001 20 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 13:15:24Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/09/2001 21 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 13:15:25Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/09/2001 22 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
09-Dec-2001 13:15:26Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/09/2001 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
09-Dec-2001 11:11:53The NYISO is reserving the following hours in the December 8, 2001 Real-Time Market per ECA20010908B to verify prices: HQ: 6:00, 23:00 OH: 6:00, 23:00 NE: 6:00, 23:00 PJM: 6:00, 23:00 All other prices in the December 8, 2001 Real-Time Market are correct. In addition, the NYISO is reserving all locational reserve prices for hours beginning 9:00, 13:00-15:00, and 19:00-21:00 of the December 8, 2001 Hour-Ahead Market. Prices in the December 9, 2001 Day-Ahead Market are correct.