P-2508-Jun-2001

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices

Dispatcher Notices

Back to top
Insert TimeMessage
08-Jun-2001 00:17:35TP-CE REMOVES ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 01:00.
08-Jun-2001 00:28:15TP-CE REMOVES RAVENSWOOD___1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 00:00.
08-Jun-2001 07:02:58TP-LI REQUESTS EAST_HAMPTON___DIESEL AND MONTALK DIESEL NO LONGER OUT OF MERIT. AT 06:58 06/08/01
08-Jun-2001 07:44:16TP-LI REQUESTS SOUTH HAMPTN___IC NO LONGER OUT OF MERIT. AT 07:44 06/08/01
08-Jun-2001 11:40:54TP-CE REQUESTS RAVENSWOOD_GT_6 OUT OF MERIT ABOVE OPCAP DMNC TEST. AT 09:00 06/08/01
08-Jun-2001 11:41:19TP-CE REQUESTS RAVENSWOOD_GT_6 NO LONGER OUT OF MERIT. AT 10:00 06/08/01
08-Jun-2001 12:26:19PJM initiated curtailment cut 100 MWs.
08-Jun-2001 12:35:30TP-CE REQUESTS ASTORIA_GT2_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 12:00.
08-Jun-2001 13:22:32TP-LI REQUESTS FAR ROCKAWAY___4 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 13:00.
08-Jun-2001 13:35:55TP-CE REQUESTS ASTORIA_GT2_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 13:00.
08-Jun-2001 13:37:11TP-NM REQUESTS ALBANY___2 OUT OF MERIT ABOVE OPCAP DMNC TEST. AT 13:00 06/08/01
08-Jun-2001 18:57:58TP-CE REQUESTS ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 18:00.
08-Jun-2001 19:52:59TP-CE REMOVES ASTORIA_GT2_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 19:00.
08-Jun-2001 21:18:48TP-CE REQUESTS RAVENSWOOD___1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 21:00.
08-Jun-2001 21:36:25TP-CE REMOVES ASTORIA_GT2_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 21:00.
08-Jun-2001 21:37:15TP-CE REMOVES ASTORIA_GT2_1 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 21:00.
08-Jun-2001 21:37:37TP-CE REMOVES ASTORIA_GT2_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 23:00.
08-Jun-2001 21:37:51TP-CE REMOVES ASTORIA_GT2_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 21:00.
08-Jun-2001 21:41:34TP-LI REQUESTS PORT_JEFF_3 & 4 BOTH OUT OF MERIT FOR LOCAL SECURITY. AT 21:40 06/08/01
08-Jun-2001 22:01:46TP-CE REMOVES ASTORIA_GT2_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 23:00.
08-Jun-2001 22:02:09TP-CE REQUESTS ASTORIA___3 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/09/2001 00:00.
08-Jun-2001 22:02:20TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/09/2001 00:00.
08-Jun-2001 22:31:00TP-LI REQUESTS PORT_JEFF_3 & 4 BOTH ARE NO LONGER OUT OF MERIT. AT 22:30 06/08/01
08-Jun-2001 23:14:40TP-CE REMOVES ASTORIA_GT2_2 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 23:00.
08-Jun-2001 23:15:35TP-LI REQUESTS FAR ROCKAWAY___4 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/09/2001 00:00.
08-Jun-2001 23:18:55TP-LI REMOVES FAR ROCKAWAY___4 OUT OF MERIT FOR TO LOCAL SECURITY AT START TIME 06/08/2001 23:00.

Committed for Reliability

Back to top
Insert TimeMessage
08-Jun-2001 12:15:31Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:34Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:35Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:36Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:37Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:38Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:39Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:40Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:41Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:43Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:44Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:45Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:46Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:47Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:48Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:50Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:51Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:52Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:53Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:54Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:55Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:56Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:58Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:15:59Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 06/09/2001 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:02Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:03Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:04Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:05Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:06Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:07Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:08Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:09Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:10Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:12Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:13Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:14Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:15Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:16Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:17Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:18Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:19Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:20Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:21Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:22Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:24Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:25Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:26Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:17:27Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 06/09/2001 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:03Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 00 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:04Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 01 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:05Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 02 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:06Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 03 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:08Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 04 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:09Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 05 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:10Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 06 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:12Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 07 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:13Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 08 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:14Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 09 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:15Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 10 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:17Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 11 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:18Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 12 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:19Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 13 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:20Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 14 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:22Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 15 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:23Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 16 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:24Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 17 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:25Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 18 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:26Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 19 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:28Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 20 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:29Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 21 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:30Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 22 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:18:31Generator: ASTORIA___3 scheduled for local reliability in DAM market for 06/09/2001 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 12:19:04Generator: PORT_JEFF_3 scheduled for local reliability in DAM market for 06/09/2001 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 20:56:27Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2001 21 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 20:56:30Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2001 22 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
08-Jun-2001 20:56:31Generator: ARTHUR_KILL_3 scheduled for local reliability in DAM market for 06/09/2001 23 Energy = 150 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.

Market Monitor Notices

Back to top
Insert TimeMessage
08-Jun-2001 14:10:31The Real Time prices have been updated in the MIS for 06/05/2001 in hours (00,01,02,03,04,05,06,22,23,13,16,)
08-Jun-2001 15:25:01The Real Time prices have been updated in the MIS for 06/06/2001 in hours (13,)
08-Jun-2001 15:58:50The NYISO is reserving the following hours in the June 7, 2001 Real-Time Market per ECA20001006B to verify prices: HQ: 00:00 - 04:00, 06:00, and 22:00 NE: 00:00, 01:00, 06:00, and 22:00 OH: 00:00, 01:00, 06:00, and 22:00 PJM: 00:00, 01:00, 06:00, and 22:00 All other prices in the June 7, 2001 Real-Time Market are correct Prices in the June 8, 2001 Day-Ahead Market are correct.
08-Jun-2001 16:45:03The Real Time prices have been updated in the MIS for 06/07/2001 in hours (00,01,02,03,04,05,06,07,22,23,)