02-Feb-2001

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices
Back to top

Dispatcher Notices

Insert Time Message
01-Feb-2001 6:11:31 TP-LI REQUESTS NORTHPORT___1,NORTHPORT___4 OUT OF MERIT FOR ISO SECURITY. ON Y-49 AT 06:05 02/01/01
01-Feb-2001 6:11:50 TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR LOCAL SECURITY. AT 06:08 02/01/01
01-Feb-2001 7:20:10 ISO REQUESTS WADING RIVER_IC_2 OUT OF MERIT FOR ISO SECURITY. AT 07:20 02/01/01
01-Feb-2001 8:57:05 TP-CE REQUESTS ASTORIA___3 OUT OF MERIT FOR LOCAL SECURITY. AT 08:56 02/01/01
01-Feb-2001 9:17:11 TP-LI REQUESTS SOUTHOLD___IC OUT OF MERIT ABOVE OPCAP DMNC TEST. AT 09:15 02/01/01
01-Feb-2001 10:15:33 TP-CE REQUESTS RAVENSWOOD___2 OUT OF MERIT FOR LOCAL SECURITY. AT 10:10 02/01/01
01-Feb-2001 10:22:43 TP-LI REQUESTS SOUTHOLD___IC NO LONGER OUT OF MERIT. AT 10:20 02/01/01
01-Feb-2001 13:47:14 NYISO Locational based curtailment cut 200 MWs.
01-Feb-2001 13:55:26 TP-LI REQUESTS PORT_JEFF_4 OUT OF MERIT ABOVE OPCAP DMNC TEST. AT 14:00 02/01/01
01-Feb-2001 14:40:10 NYISO Locational based curtailment cut 200 MWs. nyiso is cutting du to violation of line limit on 5018 line
01-Feb-2001 15:35:38 PJM initiated curtailment cut 200 MWs.
01-Feb-2001 16:07:59 ISO REQUESTS BARRETT___1 OUT OF MERIT FOR ISO SECURITY. AT 16:05 02/01/01
01-Feb-2001 16:08:17 ISO REQUESTS BARRETT___2 OUT OF MERIT FOR ISO SECURITY. AT 16:05 02/01/01
01-Feb-2001 16:19:27 ISO REQUESTS PORT_JEFF_3 OUT OF MERIT FOR ISO SECURITY. AT 16:19 02/01/01
01-Feb-2001 16:40:30 ISO REQUESTS GILBOA___3 OUT OF MERIT FOR ISO SECURITY. AT 17:00 02/01/01
01-Feb-2001 16:52:26 ISO REQUESTS NYPA___HOLTSVILL OUT OF MERIT FOR ISO SECURITY. AT 16:44 02/01/01
01-Feb-2001 16:52:43 TP-CE REQUESTS GOWANUS_GT 2_GRP OUT OF MERIT FOR LOCAL SECURITY. AT 16:49 02/01/01
01-Feb-2001 16:52:59 TP-CE REQUESTS GOWANUS_GT 3_GRP OUT OF MERIT FOR LOCAL SECURITY. AT 16:49 02/01/01
01-Feb-2001 17:05:42 TP-CE REQUESTS ASTORIA_GT2_2 OUT OF MERIT FOR LOCAL SECURITY. AT 17:04 02/01/01
01-Feb-2001 17:05:57 TP-CE REQUESTS ASTORIA_GT2_4 OUT OF MERIT FOR LOCAL SECURITY. AT 17:04 02/01/01
01-Feb-2001 17:06:15 ISO REQUESTS NORTHPORT___3 OUT OF MERIT FOR ISO SECURITY. AT 17:04 02/01/01
01-Feb-2001 17:21:46 ISO REQUESTS GILBOA___3 NO LONGER OUT OF MERIT. AT 17:30 02/01/01
01-Feb-2001 17:43:02 ISO REQUESTS NORTHPORT___3 NO LONGER OUT OF MERIT. AT 17:40 02/01/01
01-Feb-2001 17:57:55 ISO REQUESTS NORTHPORT___3 OUT OF MERIT FOR ISO SECURITY. AT 17:53 02/01/01
01-Feb-2001 18:07:40 TP-LI REQUESTS PORT_JEFF_4 NO LONGER OUT OF MERIT. AT 18:06 02/01/01
01-Feb-2001 18:35:48 ISO REQUESTS BARRETT___1 NO LONGER OUT OF MERIT. AT 18:34 02/01/01
01-Feb-2001 19:00:41 ISO REQUESTS NORTHPORT___1 NO LONGER OUT OF MERIT. AT 18:59 02/01/01
01-Feb-2001 19:00:57 ISO REQUESTS NORTHPORT___4 NO LONGER OUT OF MERIT. AT 18:59 02/01/01
01-Feb-2001 21:23:14 ISO REQUESTS BARRETT___1,port jeff 3, NYPA_HOLTSVL, NORTHPORT 3 NO LONGER OUT OF MERIT. AT 19:20 02/01/01
01-Feb-2001 21:23:45 TP-CE REQUESTS ASTORIA_GT2_2 NO LONGER OUT OF MERIT. AT 19:26 02/01/01
01-Feb-2001 21:24:29 ISO REQUESTS WADING RIVER_IC_2 NO LONGER OUT OF MERIT. AT 19:40 02/01/01
01-Feb-2001 21:24:59 TP-CE REQUESTS ASTORIA___3 NO LONGER OUT OF MERIT. AT 20:06 02/01/01
01-Feb-2001 21:25:50 TP-CE REQUESTS GOWANUS_GT 2_GRP,GOWANUS_GT 3_GRP,RAVENSWOOD 2 NO LONGER OUT OF MERIT. AT 20:34 02/01/01
01-Feb-2001 21:26:25 TP-CE REQUESTS ASTORIA_GT2_1 NO LONGER OUT OF MERIT. AT 21:20 02/01/01
01-Feb-2001 21:52:18 TP-CE REQUESTS RAVENSWOOD___2 OUT OF MERIT FOR LOCAL SECURITY. AT 21:50 02/01/01
01-Feb-2001 22:34:32 TP-CE REQUESTS RAVENSWOOD___2 NO LONGER OUT OF MERIT. AT 22:33 02/01/01
01-Feb-2001 22:37:04 NYISO Locational based curtailment cut 100 MWs.
01-Feb-2001 22:58:54 TP-CE REQUESTS ASTORIA___5 NO LONGER OUT OF MERIT. AT 22:57 02/01/01
Back to top

Committed for Reliability

Insert Time Message
01-Feb-2001 11:25:43 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/02/2001 22 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:25:45 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/02/2001 23 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:26:45 Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 02/02/2001 00 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:26:46 Generator: NORTHPORT___3 scheduled for local reliability in DAM market for 02/02/2001 01 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:27:17 Generator: BARRETT___1 scheduled for local reliability in DAM market for 02/02/2001 00 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:27:18 Generator: BARRETT___1 scheduled for local reliability in DAM market for 02/02/2001 01 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:27:19 Generator: BARRETT___1 scheduled for local reliability in DAM market for 02/02/2001 02 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:27:21 Generator: BARRETT___1 scheduled for local reliability in DAM market for 02/02/2001 03 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:27:22 Generator: BARRETT___1 scheduled for local reliability in DAM market for 02/02/2001 04 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:27:23 Generator: BARRETT___1 scheduled for local reliability in DAM market for 02/02/2001 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:27:24 Generator: BARRETT___1 scheduled for local reliability in DAM market for 02/02/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:27:25 Generator: BARRETT___1 scheduled for local reliability in DAM market for 02/02/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:27:26 Generator: BARRETT___1 scheduled for local reliability in DAM market for 02/02/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:00 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 00 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:01 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 01 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:02 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 02 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:03 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 03 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:04 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 04 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:05 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:06 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:07 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:08 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:09 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:10 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:11 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:13 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:14 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:15 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:28:16 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/02/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = 20 MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:17 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:18 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:20 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:21 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:22 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:23 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:24 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:25 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:26 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:27 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:28 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:29 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:30 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:31 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/02/2001 23 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:29:59 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/02/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:30:00 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/02/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:30:01 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/02/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:30:02 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/02/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 11:30:03 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/02/2001 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 13:18:11 Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/02/2001 12 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 13:18:12 Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/02/2001 13 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 13:18:13 Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/02/2001 14 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 13:18:14 Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/02/2001 15 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 13:18:15 Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/02/2001 16 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 13:18:17 Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/02/2001 17 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 13:18:18 Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/02/2001 18 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 13:18:19 Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/02/2001 19 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 13:18:20 Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/02/2001 20 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 13:18:21 Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/02/2001 21 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 13:18:22 Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/02/2001 22 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
01-Feb-2001 13:18:23 Generator: ASTORIA___5 scheduled for local reliability in DAM market for 02/02/2001 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
Back to top

Market Monitor Notices

Insert Time Message
01-Feb-2001 11:46:26 The NYISO is reserving hours beginning 06:00, 07:00, 09:00 and 17:00 in the January
31, 2001 Real-Time Market as well as the following hours per ECA20001006B to
verify prices:

PJM: 00:00 - 05:00, 07:00 and 23:00
OH: 07:00 and 23:00
HQ: 07:00 and 23:00
NE: 07:00 and 23:00

Prices in the February 1, 2001 Day-Ahead Market are correct.

01-Feb-2001 14:37:32 The Real Time prices have been updated in the MIS for 01/27/2001 in hours (00,01,02,03,04,05,08,09,12,14,15,16,21,22,23,)