Page Ref: P-25
16-Feb-2001

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices
Back to top

Dispatcher Notices

Insert Time Message
15-Feb-2001 0:39:06 TP-CE REQUESTS ASTORIA___3 NO LONGER OUT OF MERIT. AT 00:37 02/15/01
15-Feb-2001 0:46:43 TP-CE REQUESTS RAVENSWOOD___1 NO LONGER OUT OF MERIT. AT 00:42 02/15/01
15-Feb-2001 7:43:05 TP-CE REQUESTS RAVENSWOOD___1 OUT OF MERIT FOR LOCAL SECURITY. 138KV LOAD POCKET AT 07:41 02/15/01
15-Feb-2001 8:01:49 TP-RGE REQUESTS RUSSELL___STATION OUT OF MERIT ABOVE OPCAP DMNC TEST. AT 08:00 02/15/01
15-Feb-2001 9:50:59 TP-CE REQUESTS ASTORIA GT4____ OUT OF MERIT FOR LOCAL SECURITY. 138KV LOAD POCKET AT 09:48 02/15/01
15-Feb-2001 16:03:15 TP-CE REQUESTS ASTORIA GT2____ OUT OF MERIT FOR LOCAL SECURITY. 138KV LOAD POCKET AT 15:47 02/15/01
15-Feb-2001 17:25:08 ISO REQUESTS WADING RIVER_IC_1 OUT OF MERIT FOR ISO SECURITY. Y-49 AT 17:15 02/15/01
15-Feb-2001 18:14:39 ISO REQUESTS WADING RIVER_IC_2 OUT OF MERIT FOR ISO SECURITY. Y-49 AT 17:30 02/15/01
15-Feb-2001 18:15:01 ISO REQUESTS WADING RIVER_IC_1 AND 2 NO LONGER OUT OF MERIT. AT 18:00 02/15/01
15-Feb-2001 18:30:03 NYISO Locational based curtailment cut 200 MWs.
15-Feb-2001 19:09:07 TP-CE REQUESTS GOWANUS_GT 1_GRP OUT OF MERIT FOR LOCAL SECURITY. AT 19:00 02/15/01
15-Feb-2001 19:09:23 TP-CE REQUESTS GOWANUS_GT 2_GRP OUT OF MERIT FOR LOCAL SECURITY. AT 19:00 02/15/01
15-Feb-2001 19:46:28 TP-CE REQUESTS RAVENSWOOD___1 NO LONGER OUT OF MERIT. AT 19:30 02/15/01
15-Feb-2001 22:03:23 TP-CE REQUESTS ASTORIA GT2____ NO LONGER OUT OF MERIT. AT 22:01 02/15/01
15-Feb-2001 22:22:38 TP-CE REQUESTS GOWANUS_GT 2_GRP NO LONGER OUT OF MERIT. AT 22:20 02/15/01
15-Feb-2001 22:54:22 TP-CE REQUESTS ASTORIA GT4____ NO LONGER OUT OF MERIT. AT 22:49 02/15/01
Back to top

Committed for Reliability

Insert Time Message
15-Feb-2001 13:57:25 Generator: ASTORIA___3 scheduled for local reliability in DAM market for 02/16/2001 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 14:59:41 Generator: BARRETT___1 scheduled for local reliability in DAM market for 02/16/2001 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:00:15 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/16/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:00:16 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/16/2001 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:00:52 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/16/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:00:53 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/16/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:00:54 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/16/2001 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:43 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 00 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:44 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 01 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:45 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 02 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:46 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 03 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:47 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 04 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:48 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 05 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:49 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:50 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:52 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:53 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:54 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:55 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:56 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:57 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:58 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:01:59 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:00 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:01 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:02 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:04 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:05 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:06 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:07 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:08 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/16/2001 23 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:32 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:33 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:34 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:35 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:36 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:37 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:38 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:39 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:40 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:41 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:42 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:43 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:44 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:46 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:47 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:48 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:49 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:50 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:51 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:52 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:53 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:54 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:55 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
15-Feb-2001 15:02:56 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/16/2001 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
Back to top

Market Monitor Notices

Insert Time Message
15-Feb-2001 13:25:25 The NYISO is reserving hour beginning 08:00 in the February 14, 2001 Real-Time Market as well as the following hours per ECA20001006B to verify prices:
PJM: 00:00 - 06:00, 11:00 and 22:00
HQ: 00:00, 02:00 - 06:00
OH: 00:00, 02:00 - 06:00
NE: 00:00, 02:00 - 06:00

Prices in the February 15, 2001 Day-Ahead Market are correct.

15-Feb-2001 15:35:01 The Real Time prices have been updated in the MIS for 02/10/2001 in hours (00,01,02,03,04,05,06,10,11,23,22,)
15-Feb-2001 17:13:10 The Real Time prices have been updated in the MIS for 02/11/2001 in hours (00,01,02,03,04,05,06,07,08,12,13,14,15,16,17,18,19,20,21,22,23,)
15-Feb-2001 18:16:05 The NYISO is reserving hour beginning 08:00 in the February 14, 2001 Real-Time
Market as well as the following hours per ECA20001006B to verify prices:

PJM: 00:00 - 06:00, 11:00 and 22:00
HQ: 00:00, 02:00 - 06:00
OH: 00:00, 02:00 - 06:00
NE: 00:00, 02:00 - 06:00

Prices in the February 15, 2001 Day-Ahead Market are correct.

Revision: The NYISO is also reserving hours-beginning 5 and 6 in the 14 February 2001 real-time market to verify prices.