NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices
Back to top

Dispatcher Notices

Insert Time Message
10-Feb-2001 1:38:28 TP-CE REQUESTS ASTORIA___3 NO LONGER OUT OF MERIT. AT 01:36 02/10/01
10-Feb-2001 2:23:40 02/10/2001 02:15:33 NYISO SCD reserve pick-up executed.
10-Feb-2001 8:12:24 TP-CE REQUESTS RAVENSWOOD___2 OUT OF MERIT FOR LOCAL SECURITY. AT 08:10 02/10/01
10-Feb-2001 9:01:45 TP-CE REQUESTS ASTORIA___3 OUT OF MERIT FOR LOCAL SECURITY. AT 08:59 02/10/01
10-Feb-2001 15:22:57 TP-CE REQUESTS ARTHUR_KILL_2 OUT OF MERIT FOR LOCAL SECURITY. AT 15:22 02/10/01
10-Feb-2001 15:33:26 PJM initiated curtailment cut 200 MWs. pjm cutting early for ramp
10-Feb-2001 16:36:47 ISO REQUESTS WADING RIVER_IC_3 OUT OF MERIT FOR ISO SECURITY. AT 16:36 02/10/01
10-Feb-2001 16:56:00 ISO REQUESTS NORTHPORT___2 OUT OF MERIT FOR ISO SECURITY. AT 16:55 02/10/01
10-Feb-2001 17:09:01 ISO REQUESTS WADING RIVER_IC_3 NO LONGER OUT OF MERIT. AT 17:06 02/10/01
10-Feb-2001 17:09:14 ISO REQUESTS WADING RIVER_IC_1 OUT OF MERIT FOR ISO SECURITY. AT 17:09 02/10/01
10-Feb-2001 17:12:59 ISO REQUESTS BARRETT___1 OUT OF MERIT FOR ISO SECURITY. AT 17:12 02/10/01
10-Feb-2001 17:13:18 ISO REQUESTS BARRETT___2 OUT OF MERIT FOR ISO SECURITY. AT 17:12 02/10/01
10-Feb-2001 17:25:21 TP-CE REQUESTS ASTORIA GT4____ OUT OF MERIT FOR LOCAL SECURITY. AT 17:24 02/10/01
10-Feb-2001 17:28:47 ISO REQUESTS NORTHPORT___4 OUT OF MERIT FOR ISO SECURITY. AT 17:20 02/10/01
10-Feb-2001 18:55:59 TP-LI REQUESTS BARRETT___1 AND 2, NORTHPORT 2 AND 4 NO LONGER OUT OF MERIT. AT 18:54 02/10/01
10-Feb-2001 20:17:01 TP-LI REQUESTS WADING RIVER_IC_1 NO LONGER OUT OF MERIT. AT 20:17 02/10/01
10-Feb-2001 20:30:55 TP-CE REQUESTS RAVENSWOOD___3 OUT OF MERIT FOR LOCAL SECURITY. M51/M52 CONTINGENCIES AT 20:28 02/10/01
10-Feb-2001 22:16:21 NYISO Locational based curtailment cut 300 MWs.
10-Feb-2001 22:31:27 TP-CE REQUESTS ASTORIA GT4____ NO LONGER OUT OF MERIT. AT 22:06 02/10/01
Back to top

Committed for Reliability

Insert Time Message
10-Feb-2001 12:50:16 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 00 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:18 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 01 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:19 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 02 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:20 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 03 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:21 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 04 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:22 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 05 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:23 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 06 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:25 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 07 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:26 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 08 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:27 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 09 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:28 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 10 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:29 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 11 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:30 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 12 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:31 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 13 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:32 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 14 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:33 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 15 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:34 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 16 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:36 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 17 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:37 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 18 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:38 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 19 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:39 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 20 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:40 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 21 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:41 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 22 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 12:50:42 Generator: ARTHUR_KILL_2 scheduled for local reliability in DAM market for 02/11/2001 23 Energy = 90 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:10:14 Generator: BARRETT___1 scheduled for local reliability in DAM market for 02/11/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:10:16 Generator: BARRETT___1 scheduled for local reliability in DAM market for 02/11/2001 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:10 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 00 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:11 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 01 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:12 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 02 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:13 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 03 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:14 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 04 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:15 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:17 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:18 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:19 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:20 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:21 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:22 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:23 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:24 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:25 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:26 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:27 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:28 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:30 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:31 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:32 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:33 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:34 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:11:35 Generator: BARRETT___2 scheduled for local reliability in DAM market for 02/11/2001 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:18 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 00 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:19 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 01 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:20 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 02 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:21 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 03 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:22 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 04 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:23 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 05 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:24 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:25 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:26 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:27 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:28 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:29 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:30 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:31 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:33 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:34 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:35 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:36 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:37 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:38 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:39 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:40 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:41 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:13:42 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 02/11/2001 23 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:17 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:18 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:19 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:20 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:21 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:22 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:24 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:25 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:26 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:27 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:28 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:29 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:30 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:31 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:32 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:33 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:34 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:35 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:36 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:37 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:38 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:39 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:41 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:14:42 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 02/11/2001 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:42 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 00 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:43 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 01 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:44 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 02 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:45 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 03 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:46 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 04 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:47 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 05 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:48 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 06 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:49 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 07 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:50 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 08 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:51 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 09 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:52 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 10 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:54 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 11 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:55 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 12 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:56 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 13 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:57 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 14 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:58 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 15 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:15:59 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 16 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:16:00 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 17 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:16:01 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 18 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:16:02 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 19 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:16:03 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 20 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:16:04 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 21 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:16:05 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 22 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:16:06 Generator: NYPA___HOLTSVILL scheduled for local reliability in DAM market for 02/11/2001 23 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:16:32 Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 02/11/2001 23 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:13 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:14 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:16 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:17 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:18 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:19 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:20 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:21 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:22 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:23 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:24 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:25 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:26 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:27 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:28 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:29 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:31 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:32 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:33 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:34 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:35 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:36 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:37 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
10-Feb-2001 16:17:38 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 02/11/2001 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
Back to top

Market Monitor Notices

Insert Time Message
10-Feb-2001 11:11:44 The NYISO is reserving the following hours in the February 9, 2001 Real-Time Market per ECA20001006B to verify external prices:

PJM: 00:00 - 04:00, 06:00 - 07:00, 15:00, 21:00, and 23:00.
OH: 00:00 - 01:00,06:00 - 7:00, 15:00, and 21:00.
HQ: 01:00, 01:00, 06:00 - 07:00, 15:00, and 21:00.
NE: 01:00, 01:00, 06:00 - 07:00. 15:00, and 21:00.
All other prices in the February 9, 2001 Real-Time Market are correct.

Prices in the February 10, 2001 Day-Ahead Market are correct.
10-Feb-2001 11:19:59 The NYISO is reserving the following hours in the February 9, 2001 Real-Time Market per ECA20001006B to verify external prices:

PJM: 00:00 - 04:00, 06:00 - 07:00, 15:00, 21:00, and 23:00.
OH: 00:00 - 01:00,06:00 - 7:00, 15:00, and 21:00.
HQ: 01:00, 01:00, 06:00 - 07:00, 15:00, and 21:00.
NE: 01:00, 01:00, 06:00 - 07:00. 15:00, and 21:00.
All other prices in the February 9, 2001 Real-Time Market are correct.

Prices in the February 10, 2001 Day-Ahead Market are correct.