Page Ref: P-25
28-Dec-2000

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices
Back to top

Dispatcher Notices

Insert Time Message
27-Dec-2000 0:48:51 TP-CE REQUESTS RAVENSWOOD___2 NO LONGER OUT OF MERIT. AT 00:50 12/27/00
27-Dec-2000 6:08:59 TP-CE REQUESTS ASTORIA___4 OUT OF MERIT FOR LOCAL SECURITY. AT 06:05 12/27/00
27-Dec-2000 7:02:33 TP-CE REQUESTS RAVENSWOOD___2 OUT OF MERIT FOR LOCAL SECURITY. ASTORIA LOAD POCKET AT 06:57 12/27/00
27-Dec-2000 7:31:29 TP-CE REQUESTS ASTORIA___5 OUT OF MERIT FOR LOCAL SECURITY. 36312 CONTINGENCY AT 07:27 12/27/00
27-Dec-2000 9:23:52 TP-CE REQUESTS ASTORIA GT3____ OUT OF MERIT FOR LOCAL SECURITY. 701/702 OVER NORMAL AT 09:18 12/27/00
27-Dec-2000 11:26:06 TP-CE REQUESTS ASTORIA GT4____ OUT OF MERIT FOR LOCAL SECURITY. 701/702 OVER NORMAL AT 11:20 12/27/00
27-Dec-2000 11:56:34 12/27/2000 11:48:26 NYISO SCD reserve pick-up executed.
27-Dec-2000 11:57:19 ISO REQUESTS GILBOA___4 OUT OF MERIT FOR ISO SECURITY. RESERVE P/U AT 12:04 12/27/00
27-Dec-2000 11:57:39 ISO REQUESTS GILBOA___4 NO LONGER OUT OF MERIT. AT 12:06 12/27/00
27-Dec-2000 15:17:28 TP-CE REQUESTS NARROWS_GT1_GRP OUT OF MERIT FOR LOCAL SECURITY. 138KV LOAD POCKET AT 15:12 12/27/00
27-Dec-2000 15:51:07 TP-CE REQUESTS ASTORIA___5 NO LONGER OUT OF MERIT. AT 15:50 12/27/00
27-Dec-2000 16:06:47 TP-CE REQUESTS NARROWS_GT2_GRP OUT OF MERIT FOR LOCAL SECURITY. 138KV LOAD POCKET AT 15:54 12/27/00
27-Dec-2000 16:07:14 TP-CE REQUESTS ASTORIA GT3____ OUT OF MERIT FOR LOCAL SECURITY. 138KV LOAD POCKET AT 16:02 12/27/00
27-Dec-2000 16:34:11 ISO REQUESTS WADING RIVER_IC_1 AND 2 OUT OF MERIT FOR ISO SECURITY. Y-49 AT 16:30 12/27/00
27-Dec-2000 16:39:26 TP-LI REQUESTS BARRETT___1 OUT OF MERIT TO TEST UNIT AT 16:38 12/27/00
27-Dec-2000 17:04:27 ISO REQUESTS WADING RIVER_IC_1 AND 2 NO LONGER OUT OF MERIT. AT 17:00 12/27/00
27-Dec-2000 17:04:51 TP-CE REQUESTS GOWANUS_GT 3_GRP OUT OF MERIT FOR LOCAL SECURITY. 138KV LOAD POCKET AT 17:00 12/27/00
27-Dec-2000 17:08:41 TP-CE REQUESTS ASTORIA GT2____ OUT OF MERIT FOR LOCAL SECURITY. 138KV LOAD POCKET AT 17:06 12/27/00
27-Dec-2000 18:13:36 TP-CE REQUESTS NARROWS_GT2_GRP NO LONGER OUT OF MERIT. AT 18:09 12/27/00
27-Dec-2000 18:42:23 TP-CE REQUESTS ASTORIA_GT2_2 NO LONGER OUT OF MERIT. AT 18:39 12/27/00
27-Dec-2000 18:51:37 TP-CE REQUESTS NARROWS_GT2_GRP NO LONGER OUT OF MERIT. AT 18:48 12/27/00
27-Dec-2000 19:41:18 TP-CE REQUESTS ASTORIA_GT4_1 NO LONGER OUT OF MERIT. AT 19:39 12/27/00, ENTIRE GROUP IN MERIT.
27-Dec-2000 20:51:10 ISO REQUESTS BARRETT___1 OUT OF MERIT FOR ISO SECURITY. AT 20:20 12/27/00
27-Dec-2000 20:51:27 ISO REQUESTS BARRETT___1 NO LONGER OUT OF MERIT. AT 20:44 12/27/00
27-Dec-2000 21:09:26 TP-CE REQUESTS GOWANUS_GT 2_GRP OUT OF MERIT FOR LOCAL SECURITY. AT 21:03 12/27/00
27-Dec-2000 22:01:36 TP-CE REQUESTS NARROWS_GT1_GRP NO LONGER OUT OF MERIT. AT 18:48 12/27/00
27-Dec-2000 22:27:58 TP-CE REQUESTS GOWANUS_GT 3_GRP NO LONGER OUT OF MERIT. AT 22:26 12/27/00
27-Dec-2000 22:59:37 TP-CE REQUESTS ASTORIA_GT3_1 NO LONGER OUT OF MERIT. AT 22:55 12/27/00, ENTIRE GROUP BACK IN MERIT.
27-Dec-2000 23:56:13 TP-CE REQUESTS ASTORIA___4 NO LONGER OUT OF MERIT. AT 23:55 12/27/00
Back to top

Committed for Reliability

Insert Time Message
27-Dec-2000 12:41:49 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 00 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:41:52 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 01 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:41:53 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 02 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:41:55 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 03 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:41:56 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 04 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:41:57 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:41:58 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:41:59 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:00 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:01 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:02 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:04 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:05 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:06 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:07 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:08 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:09 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:10 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:11 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:13 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:14 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:15 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:16 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:42:17 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/28/2000 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:41 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 00 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:43 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 01 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:44 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 02 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:45 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 03 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:46 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 04 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:47 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 05 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:49 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:50 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:51 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:52 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:53 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:54 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:56 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:57 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:58 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:46:59 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/28/2000 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:08 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:10 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:12 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:13 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:14 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:15 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:16 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:17 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:18 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:19 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:21 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:22 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:23 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:24 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:25 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:26 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:27 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:28 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:30 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:31 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:32 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:33 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:34 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 12:50:35 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/28/2000 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:17 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 00 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:19 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 01 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:20 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 02 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:21 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 03 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:22 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 04 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:23 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 05 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:24 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 06 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:25 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 07 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:26 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 08 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:27 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 09 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:28 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 10 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:30 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 11 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:31 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 12 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:32 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 13 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:33 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 14 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:34 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 15 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:35 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 16 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:36 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 17 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:37 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 18 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:38 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 19 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:39 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 20 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:40 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 21 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:41 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 22 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
27-Dec-2000 13:56:43 Generator: ASTORIA___4 scheduled for local reliability in DAM market for 12/28/2000 23 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
Back to top

Market Monitor Notices

Insert Time Message
27-Dec-2000 15:24:42 The NYISO is reserving hours beginning 1000 and 1600 - 1900 in the 26 December 2000 Real-Time market as well as the following hours per ECA20001006B to verify prices:
PJM: 0000. 0600 - 0700, 2000, 2300
HQ: 0000. 0600 - 0700, 2000, 2300
NE: 0000. 0600 - 0700, 2000, 2300
OH: 0000. 0600 - 0700, 2000, 2300.
Prices in the 27 December 2000 Day-Ahead market are correct.
27-Dec-2000 15:51:10 The Real Time prices have been updated in the MIS for 12/22/2000 in hours (01,02,07,08,)
27-Dec-2000 20:03:54 The Real Time prices have been updated in the MIS for 12/23/2000 in hours (01,02,03,04,05,06,07,)