Page Ref: P-25
22-Dec-2000

NYISO Operational Announcements


Dispatcher Notices
Committed for Reliability
Market Monitor Notices
Back to top

Dispatcher Notices

Insert Time Message
21-Dec-2000 6:58:21 TP-CE REQUESTS ASTORIA___4 OUT OF MERIT FOR LOCAL SECURITY. AT 06:56 12/21/00
21-Dec-2000 10:23:34 NYISO Locational based curtailment cut 76 MWs.
21-Dec-2000 10:33:59 NYISO Locational based curtailment cut 42 MWs.
21-Dec-2000 12:59:24 12/21/2000 12:50:18 NYISO SCD reserve pick-up executed.
21-Dec-2000 15:50:21 TP-CE REQUESTS ASTORIA___3 OUT OF MERIT FOR LOCAL SECURITY. AT 15:39 12/21/00
21-Dec-2000 16:35:39 ISO REQUESTS GILBOA___3 OUT OF MERIT FOR ISO SECURITY. AT 16:00 12/21/00
21-Dec-2000 16:35:57 ISO REQUESTS GILBOA___3 NO LONGER OUT OF MERIT. AT 16:30 12/21/00
21-Dec-2000 16:36:51 TP-CE REQUESTS RAVENSWOOD___2 OUT OF MERIT FOR LOCAL SECURITY. AT 16:02 12/21/00
21-Dec-2000 16:37:19 TP-CE REQUESTS ASTORIA___3 OUT OF MERIT FOR LOCAL SECURITY. AT 15:39 12/21/00
21-Dec-2000 16:56:58 TP-CE REQUESTS NARROWS_GT2_GRP OUT OF MERIT FOR LOCAL SECURITY. AT 16:46 12/21/00
21-Dec-2000 16:57:18 TP-CE REQUESTS NARROWS_GT1_GRP OUT OF MERIT FOR LOCAL SECURITY. AT 16:51 12/21/00
21-Dec-2000 17:18:20 ISO REQUESTS WADING RIVER_IC_2 OUT OF MERIT FOR ISO SECURITY.ON Y-49 AT 17:12 12/21/00
21-Dec-2000 17:27:32 TP-LI REQUESTS BARRETT___2,FAR ROCK 4, GLENWOOD 4, GLENWOOD 5 OUT OF MERIT FOR ISO SECURITY FOR Y-49 AT 17:20 12/21/00
21-Dec-2000 18:27:11 TP-CE REQUESTS NARROWS_GT1_GRP NO LONGER OUT OF MERIT. AT 18:27 12/21/00
21-Dec-2000 19:07:35 ISO REQUESTS WADING RIVER_IC_2 NO LONGER OUT OF MERIT. AT 19:02 12/21/00
21-Dec-2000 19:08:08 ISO REQUESTS BARRETT___2 NO LONGER OUT OF MERIT. AT 19:02 12/21/00
21-Dec-2000 19:08:37 ISO REQUESTS FAR ROCKAWAY___4 NO LONGER OUT OF MERIT. AT 19:02 12/21/00
21-Dec-2000 19:08:58 ISO REQUESTS GLENWOOD___4 AND 5 NO LONGER OUT OF MERIT. AT 19:02 12/21/00
21-Dec-2000 21:20:19 TP-CE REQUESTS ASTORIA GT3____ NO LONGER OUT OF MERIT. AT 21:18 12/21/00
21-Dec-2000 21:41:00 TP-CE REQUESTS NARROWS_GT2_GRP NO LONGER OUT OF MERIT. AT 21:38 12/21/00
21-Dec-2000 21:49:03 TP-CE REQUESTS ASTORIA GT2____GROUP OUT OF MERIT FOR LOCAL SECURITY. AT 16:40 12/21/00
21-Dec-2000 21:49:32 TP-CE REQUESTS ASTORIA GT3____GROUP OUT OF MERIT FOR LOCAL SECURITY. AT 16:40 12/21/00
21-Dec-2000 22:14:01 TP-CE REQUESTS ASTORIA GT2____GROUP NO LONGER OUT OF MERIT. AT 22:12 12/21/00
21-Dec-2000 23:32:39 TP-CE REQUESTS ASTORIA___3 NO LONGER OUT OF MERIT. AT 23:31 12/21/00
21-Dec-2000 23:33:01 TP-CE REQUESTS ASTORIA___4 NO LONGER OUT OF MERIT. AT 23:31 12/21/00
Back to top

Committed for Reliability

Insert Time Message
21-Dec-2000 12:29:50 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 00 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:29:52 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 01 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:29:53 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 02 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:29:54 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 03 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:29:55 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 04 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:29:57 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:29:58 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:29:59 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:00 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:01 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:02 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:03 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:04 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:05 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:07 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:08 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:09 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:10 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:11 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:12 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:13 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:14 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:15 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:30:17 Generator: BARRETT___1 scheduled for local reliability in DAM market for 12/22/2000 23 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:31:27 Generator: BARRETT___2 scheduled for local reliability in DAM market for 12/22/2000 00 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:31:28 Generator: BARRETT___2 scheduled for local reliability in DAM market for 12/22/2000 01 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:31:29 Generator: BARRETT___2 scheduled for local reliability in DAM market for 12/22/2000 02 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:31:30 Generator: BARRETT___2 scheduled for local reliability in DAM market for 12/22/2000 03 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:31:31 Generator: BARRETT___2 scheduled for local reliability in DAM market for 12/22/2000 04 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:31:32 Generator: BARRETT___2 scheduled for local reliability in DAM market for 12/22/2000 05 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:32:16 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 12/22/2000 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:32:17 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 12/22/2000 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:32:18 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 12/22/2000 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:32:19 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 12/22/2000 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:32:21 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 12/22/2000 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:32:22 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 12/22/2000 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:32:23 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 12/22/2000 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:32:52 Generator: FAR ROCKAWAY___4 scheduled for local reliability in DAM market for 12/22/2000 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:28 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 00 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:29 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 01 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:30 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 02 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:32 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 03 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:33 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 04 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:34 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 05 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:35 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:36 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:37 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:38 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:39 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:40 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:41 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:42 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:43 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:44 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:45 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:46 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:48 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:49 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:50 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:51 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:52 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:33:53 Generator: GLENWOOD___4 scheduled for local reliability in DAM market for 12/22/2000 23 Energy = 25 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:23 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 00 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:24 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 01 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:25 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 02 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:26 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 03 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:27 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 04 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:28 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 05 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:29 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 06 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:30 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 07 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:31 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 08 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:32 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 09 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:33 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 10 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:35 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 11 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:36 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 12 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:37 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 13 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:38 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 14 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:39 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 15 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:40 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 16 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:41 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 17 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:42 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 18 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:43 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 19 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:44 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 20 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:45 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 21 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:46 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 22 Energy = 40 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:34:47 Generator: GLENWOOD___5 scheduled for local reliability in DAM market for 12/22/2000 23 Energy = 20 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:38:41 Generator: NORTHPORT___2 scheduled for local reliability in DAM market for 12/22/2000 23 Energy = 100 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:39:15 Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 12/22/2000 00 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:39:16 Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 12/22/2000 01 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:39:17 Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 12/22/2000 02 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:39:18 Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 12/22/2000 03 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:39:19 Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 12/22/2000 04 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:39:20 Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 12/22/2000 05 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 12:39:21 Generator: NORTHPORT___4 scheduled for local reliability in DAM market for 12/22/2000 06 Energy = 140 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 15:42:14 Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/21/2000 21 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 15:42:17 Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/21/2000 22 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 15:42:18 Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/21/2000 23 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 15:42:19 Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/22/2000 00 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 15:42:20 Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/22/2000 01 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 15:42:21 Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/22/2000 02 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 15:42:23 Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/22/2000 03 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 15:42:24 Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/22/2000 04 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 15:42:25 Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/22/2000 05 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
21-Dec-2000 15:42:26 Generator: ASTORIA___3 scheduled for local reliability in DAM market for 12/22/2000 06 Energy = 75 MW. Regulation = MW. Min10 Spinning = MW. Min10 Nonsynch = MW. Min30 Spinning = MW. Min30 Nonsynch = MW. Operating Cap = MW.
Back to top

Market Monitor Notices

Insert Time Message
21-Dec-2000 13:58:01 The Real Time prices have been updated in the MIS for 12/16/2000 in hours (00,01,02,03,04,05,06,07,10,11,16,17,18,19,23,)
21-Dec-2000 15:35:33 Notice:
The Average Real Time prices have been updated in the MIS for 12/16/2000 in hours (00,01,02,03,04,05,06,07,10,11,16,17,18,19,23,)
21-Dec-2000 16:00:33 The NYISO is reserving hours beginning 0500 - 0600, 1200, and 1600 - 2000 in the 20 December 2000 Real-Time market as well as the following hours per ECA20001006B to verify prices:
PJM: 0000 - 0300, 0500 - 0800, 2200 - 2300
HQ: 0000, 0500 - 0800, 2200 - 2300
NE: 0000, 0500 - 0800, 2200 - 2300
OH: 0000, 0500 - 0800, 2200 - 2300.
Prices in the 21 December 2000 Day-Ahead market are correct.
21-Dec-2000 16:27:23 The Real Time prices have been updated in the MIS for 12/18/2000 in hours (20,21,23,)